Patent US3186181A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3186181A Expired / Lapsed US ⏱️ 0.0 years remaining

Filling of pile shells with concrete

Assignee: Raymond International Inc
•
Filing: 1962-10-18
•
Granted: 1965-06-01
•
Expires: 1982-10-18
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Richard K Snow
  • 👤 George J Gendron
  • 👤 Lindsey J Phares

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-04 13:06
CPC Classifications
E; E02; E02D; E02D15/00; E02D15/02; E02D15/04

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 155 words
METHOD FOR INTRODUCING CONCRETE INTO PILE SHELLS AND THE LIKE AFTER SAME HAVE BEEN INSTALLED IN THE EARTH AND WHICH ARE OF SUCH EXTENSIVE DEPTH THAT THE ROCK OF THE CONCRETE MIXTURE, IF POURED IN AT THE TOP, WOULD BECOME EXCESSIVELY SEGREGATED FROM THE GROUTH BY REASON OF AIR TURBULENCE IN THE SHELL, SAID METHOD COMPRISING: FIRST FORMING A COMPACT SLUG OF THE CONCRETE MIXTURE AT THE UPPER END OF THE PILE SHELL, SAID SLUG BEING SMALLER THAN THE SHELL IN CROSS-SECTION AND BEING ELONGATED WITH ITS LOWER END AS FORMED AT A REGION SPACED FROM THE BOTTOM OF THE SHELL BY A DISTANCE AT LEAST SEVERAL TIMES GREATER THAN THE LENGTH OF THE SLUG; THEN RELEASING SAID SLUG AND ALLOWING SAME TO DROP, WHILE SAME REMAINS AS AN INTEGRAL COMPACT MASS, TO THE BOTTOM OF THE SHELL; AND FORMING AND DROPPING LIKE SUCCESSIVE COMPACT SLUGS UNTIL THE SHELL IS FILLED TO THE DESIRED DEPTH.
Claim 2
Dependent Claim 155 words
METHOD FOR INTRODUCING CONCRETE INTO PILE SHELLS AND THE LIKE AFTER SAME HAVE BEEN INSTALLED IN THE EARTH AND WHICH ARE OF SUCH EXTENSIVE DEPTH THAT THE ROCK OF THE CONCRETE MIXTURE, IF POURED IN AT THE TOP, WOULD BECOME EXCESSIVELY SEGREGATED FROM THE GROUTH BY REASON OF AIR TURBULENCE IN THE SHELL, SAID METHOD COMPRISING: FIRST FORMING A COMPACT SLUG OF THE CONCRETE MIXTURE AT THE UPPER END OF THE PILE SHELL, SAID SLUG BEING SMALLER THAN THE SHELL IN CROSS-SECTION AND BEING ELONGATED WITH ITS LOWER END AS FORMED AT A REGION SPACED FROM THE BOTTOM OF THE SHELL BY A DISTANCE AT LEAST SEVERAL TIMES GREATER THAN THE LENGTH OF THE SLUG; THEN RELEASING SAID SLUG AND ALLOWING SAME TO DROP, WHILE SAME REMAINS AS AN INTEGRAL COMPACT MASS, TO THE BOTTOM OF THE SHELL; AND FORMING AND DROPPING LIKE SUCCESSIVE COMPACT SLUGS UNTIL THE SHELL IS FILLED TO THE DESIRED DEPTH.

References Cited (Backward Citations)

US1104703A Cited
US1127393A Cited
US940100A Cited
US1444519A Cited
US2576507A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-05-31 1968-11-30 1969-06-01 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-05-31 1972-11-30 1973-06-01 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-05-31 1976-11-30 1977-06-01 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag