Patent US3177939A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3177939A Expired / Lapsed US ⏱️ 0.0 years remaining

Secondary recovery process using gasliquid drive fluids

Assignee: Pure Oil Co
•
Filing: 1963-01-31
•
Granted: 1965-04-13
•
Expires: 1983-01-31
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Le Roy W Holm
  • 👤 Albert K Csaszar

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 22:53
CPC Classifications
C; C09; C09K; C09K8/00; C09K8/58

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 121 words
THE METHOD FOR THE RECOVERY OF PETROLEUM OIL FROM RESERVOIRS CONTAINING WATER IN EXCESS OF ABOUT 0.5 PORE VOLUME AND PETROLEUM COMPRISING FIRST INJECTING THROUGH AN INPUT WELL AND INTO SAID RESERVOIR ABOUT 0.1 TO 0.5 PORE VOLUME OF A GAS HAVING A SOLUBILITY IN PETROLEUM NOT GREATER THAN ABOUT 2% BY WEIGHT, THEN INJECTING 0.03 TO 0.20 PORE VOLUME OF LIQUID C3 TO C10 HYDROCARBON, THEREAFTER INJECTING ABOUT 0.03 TO 0.20 PORE VOLUME OF A LIQUID SOLVENT CAPABLE OF DISSOLVING AT LEAST 10% ITS WEIGHT OF PETROLEUM AND SOLUBLE IN WATER TO AT LEAST 10% OF THE WEIGHT OF THE WATER, DRIVING THE INJECTED MATERIAL THROUGH SAID RESERVOIR BY THE INJECTION OF FLOODWATER AND PRODUCING PETROLEUM FROM AN OUTPUT WELL.
Claim 2
Independent Claim 121 words
THE METHOD FOR THE RECOVERY OF PETROLEUM OIL FROM RESERVOIRS CONTAINING WATER IN EXCESS OF ABOUT 0.5 PORE VOLUME AND PETROLEUM COMPRISING FIRST INJECTING THROUGH AN INPUT WELL AND INTO SAID RESERVOIR ABOUT 0.1 TO 0.5 PORE VOLUME OF A GAS HAVING A SOLUBILITY IN PETROLEUM NOT GREATER THAN ABOUT 2% BY WEIGHT, THEN INJECTING 0.03 TO 0.20 PORE VOLUME OF LIQUID C3 TO C10 HYDROCARBON, THEREAFTER INJECTING ABOUT 0.03 TO 0.20 PORE VOLUME OF A LIQUID SOLVENT CAPABLE OF DISSOLVING AT LEAST 10% ITS WEIGHT OF PETROLEUM AND SOLUBLE IN WATER TO AT LEAST 10% OF THE WEIGHT OF THE WATER, DRIVING THE INJECTED MATERIAL THROUGH SAID RESERVOIR BY THE INJECTION OF FLOODWATER AND PRODUCING PETROLEUM FROM AN OUTPUT WELL.

References Cited (Backward Citations)

US2742089A Cited
US2866507A Cited
US3080917A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1968-04-12 1968-10-12 1969-04-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1972-04-12 1972-10-12 1973-04-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1976-04-12 1976-10-12 1977-04-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag