Patent US3142323A successfully refreshed from Google Patents.
US3142323A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method and apparatus for controlling the slicing operation
Assignee: JBS USA LLC
•
Filing: 1961-08-22
•
Granted: 1964-07-28
•
Expires: 1981-08-22
Abstract
No abstract record available.
Inventors
- 👤 Metzler Philip Carl
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 01:01
CPC Classifications
B; B26; B26D; B26D7/00; B26D7/27; B26D7/30; B23; B23D; B23D36/00; B23D36/0091; B26D7/06; B26D7/0608; Y; Y10; Y10T; Y10T83/00; Y10T83/04; Y10T83/0448; Y10T83/101; Y10T83/141; Y10T83/145; Y10T83/202; Y10T83/2033; Y10T83/525
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
221 words
AN IMPROVED CONTROL SYSTEM FOR A SLICING MACHINE HAVING A SLICING ELEMENT AND A FEED FOR ADVANCING MATERIAL IN A GIVEN DIRECTION AND AT A GIVEN SPEED THERETO, SAID CONTROL SYSTEM COMPRISING: SENSING MEANS BETWEEN SAID FEED AND SAID SLICING ELEMENT, SAID SENSING MEANS POSITIONED TO DETECT DIMENSIONS OF THE MATERIAL AND CHANGES THEREIN; FIRST SIGNAL MEANS CONNECTED TO SAID SENSING MEANS, SAID FIRST SIGNAL MEANS BEING OPERABLE TO PRODUCE A FIRST SIGNAL VARIABLE IN ACCORDANCE WITH SAID DIMENSIONS OF SAID MATERIAL; INTEGRATING MEANS CONNECTED TO SAID FIRST SIGNAL MEANS, SAID INTEGRATING MEANS ACTING TO CONTINUOUSLY INTEGRATE SAID FIRST SIGNAL PRODUCED BY SAID SIGNAL MEANS AGAINST SAID SPEED TO DEVELOP A SECOND INCREASING SIGNAL CHANGING IN DIRECT RELATION TO THE VOLUME OF MATERIAL MOVED PAST SAID SENSING MEANS; A SECOND SIGNAL MEANS ASSOCIATED WITH THE SLICING ELEMENT, SAID SECOND SIGNAL MEANS ADAPTED TO MOMENTARILY PRODUCE A CONSTANT SIGNAL OF A GIVEN MAGNITUDE ONCE DURING EACH COMPLETE CYCLE OF SAID SLICING ELEMENT; DETECTING MEANS CONNECTED TO SAID INTEGRATING MEANS AND SAID SECOND SIGNAL MEANS, SAID DETECTING MEANS ADAPTED TO CHANGE CONDITION UPON THE CUMULATION OF SAID SECOND AND SAID CONSTANT SIGNALS REACHING A SPECIFIED LEVEL; AND REGULATING MEANS CONNECTED BETWEEN SAID DETECTING MEANS AND THE FEED MEANS TO CAUSE INTERRUPTION OF SAID FEED UPON SUCH CHANGE IN CONDITION OF SAID DETECTING MEANS.
Claim 2
Dependent Claim
103 words
AN IMPROVED METHOD OF CONTROLLING A SLICING OPERATION IN ACCORDANCE WITH AN AMOUNT OF MATERIAL FED PAST A SLICING MEANS, SAID METHOD COMPRISING THE STEPS OF: FEEDING SAID MATERIAL AT A CONSTANT SPEED TOWARD SAID SLICING MEANS TO THAT ALL SLICES SEVERED THEREBY ARE OF UNIFORM THICKNESS; SENSING AT LEAST ONE CROSS SECTIONAL DIMENSION OF SAID MATERIAL, AND CHANGES THEREIN, NORMAL TO THE PATH THEREOF; PRODUCING A SIGNAL REPRESENTING THE VOLUME OF SAID MATERIAL HAVING PASSED A GIVEN POINT ON SAID PATH; AND COMPLETELY INTERRUPTING THE FEEDING OF SAID MATERIAL FOR BRIEF PERIODS UPON SAID SIGNAL REPRESENTING A DESIRED VOLUME OF SAID MATERIAL.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1967-07-28 | 1968-01-27 | 1968-07-28 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1971-07-28 | 1972-01-27 | 1972-07-28 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1975-07-28 | 1976-01-27 | 1976-07-28 | $7700.00 | Window Closed / Lapsed |