Patent US3130041A successfully refreshed from Google Patents.
US3130041A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of simultaneous production of low-silicon iron and high-alumina slag
Assignee: LafargeHolcim Ciments SA
•
Filing: 1961-08-11
•
Granted: 1964-04-21
•
Expires: 1981-08-11
Abstract
No abstract record available.
Inventors
- 👤 Richaud Pierre Joseph Gabriel
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-23 20:02
CPC Classifications
C; C04; C04B; C04B7/00; C04B7/32; C21; C21B; C21B11/00
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
151 words
A METHOD OF SIMULTANDOUS PRODUCTIN OF LOW-SILICON CAST IRON AND A HIGH ALUMINA CONTENT SLAG FOR PRODUCING A HIGHLY REFRACTORY HIGH-ALUMINA CEMENT, WHICH METHOD COMPRISES THE STEPS OF CHARGING A FURNACE WITH COKE AND SLAGGING CONSTITUENTS POOR IN SILICA, CORRESPONDIG TO A COMPOSITION OF 20-65% AL2O3, LESS THAN 7% SIO2, 10-60% CAO AND 1-7% IRON OXIDES, WITH THE FOLLOWING SIZE RANGES: AL2O3 5-25MM., CAO 5-15MM., COKE 5-50 MM., ANY IRON ORE ADDED BEING IN A NON-SINTERED CONDITION, MAINTAINING A UNIFORM TEMPERATURE ABOVE 2000*C. IN THE BLASTING AREA BY BLOWING HOT AIR CONTAINIG WATER VAPOR AT A TEMPERATURE OF AT LEAST 600*C., AND DISCHARGING SEPARATELY THE MELTED SLAG CONTINUOUSLY AND THE LOWSILICON IRON IN BATCHES, THE TAPPING OF THE IRON BEING EFFECTED AT SUCH A RATE THAT THE RESPCETIVE POSITIONS OF THE SUPERIMPOSED LIQUID PHASES REMAIN SUBSTANTIALLY CONSTANT, THE DEPTH OF THE AVAILABLE SLAG CORRESPONDING TO AT LEAST ABOUT 20 MINUTES PRODUCTION.
Claim 2
Independent Claim
151 words
A METHOD OF SIMULTANDOUS PRODUCTIN OF LOW-SILICON CAST IRON AND A HIGH ALUMINA CONTENT SLAG FOR PRODUCING A HIGHLY REFRACTORY HIGH-ALUMINA CEMENT, WHICH METHOD COMPRISES THE STEPS OF CHARGING A FURNACE WITH COKE AND SLAGGING CONSTITUENTS POOR IN SILICA, CORRESPONDIG TO A COMPOSITION OF 20-65% AL2O3, LESS THAN 7% SIO2, 10-60% CAO AND 1-7% IRON OXIDES, WITH THE FOLLOWING SIZE RANGES: AL2O3 5-25MM., CAO 5-15MM., COKE 5-50 MM., ANY IRON ORE ADDED BEING IN A NON-SINTERED CONDITION, MAINTAINING A UNIFORM TEMPERATURE ABOVE 2000*C. IN THE BLASTING AREA BY BLOWING HOT AIR CONTAINIG WATER VAPOR AT A TEMPERATURE OF AT LEAST 600*C., AND DISCHARGING SEPARATELY THE MELTED SLAG CONTINUOUSLY AND THE LOWSILICON IRON IN BATCHES, THE TAPPING OF THE IRON BEING EFFECTED AT SUCH A RATE THAT THE RESPCETIVE POSITIONS OF THE SUPERIMPOSED LIQUID PHASES REMAIN SUBSTANTIALLY CONSTANT, THE DEPTH OF THE AVAILABLE SLAG CORRESPONDING TO AT LEAST ABOUT 20 MINUTES PRODUCTION.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1967-04-21 | 1967-10-21 | 1968-04-21 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1971-04-21 | 1971-10-21 | 1972-04-21 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1975-04-21 | 1975-10-21 | 1976-04-21 | $7700.00 | Window Closed / Lapsed |