Patent US3117899A successfully refreshed from Google Patents.
US3117899A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process for making semiconductor devices
Assignee: Westinghouse Electric Corp
•
Filing: 1960-07-18
•
Granted: 1964-01-14
•
Expires: 1980-07-18
Abstract
No abstract record available.
Inventors
- 👤 Raymond M Mclouski
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-29 23:48
CPC Classifications
H; H10; H10P; H10P50/00; H10P50/60; H10P50/64; H10P50/642; C; C25; C25F; C25F3/00; C25F3/02; C25F3/12; H10D; H10D99/00; Y; Y10; Y10S; Y10S438/00; Y10S438/979
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
162 words
IN THE PROCESS OF MAKING A SEMICONDUCTOR DEVICE HAVING A P-N JUNCTION PORTION WITH PREDETERMINED TUNNEL DIODE CHARACTERISTICS, THE STEPS COMPRISING PREPARING THE DEVICE WITH THE P-N JUNCTION PORTION PROCESSED TO PROVIDE THE TUNNEL CHARACTERISTICS IN A DEGREE LESS THAN OPTIMALLY POSSIBLE, THERE BEING LEADS ATTACHED TO EACH SIDE OF SAID P-N JUNCTION; APPLYING TO THE PORTION A CHEMICAL ETCHANT EQUIVALENT TO THAT PRODUCED BY ADMIXING THE FOLLOWING COMPONENTS BY VOLUME FROM 1 TO 10 PARTS OF FUMING RED NITRIC ACID (90%), FROM 1 TO 15 PARTS OF ACETIC ACID (80%), FROM 1 TO 10 ML. OF HYDROFLUORIC ACID (50% HF) AND FROM 0.1 TO 4 ML. OF BROMINE PER 100 ML. OF SOLUTION; PASSING A FORWARD CURRENT THROUGH THE LEADS TO THE P-N JUNCTION AS ETCHING PROGRESSES TO MEASURE SUBSTANTIALLY CONTINUOUSLY THE PEAK-TO-VALLEY CURRENT RATIO AT THE JUNCTION WITHOUT REMOVING THE DEVICE FROM CONTACT WITH THE ETCHANT AND CONTINUING ETCHING UNTIL THE DESIRED PEAK-TO-VALLEY CURRENT RATIO AT THE JUNCTION IS ATTAINED.
Claim 2
Dependent Claim
162 words
IN THE PROCESS OF MAKING A SEMICONDUCTOR DEVICE HAVING A P-N JUNCTION PORTION WITH PREDETERMINED TUNNEL DIODE CHARACTERISTICS, THE STEPS COMPRISING PREPARING THE DEVICE WITH THE P-N JUNCTION PORTION PROCESSED TO PROVIDE THE TUNNEL CHARACTERISTICS IN A DEGREE LESS THAN OPTIMALLY POSSIBLE, THERE BEING LEADS ATTACHED TO EACH SIDE OF SAID P-N JUNCTION; APPLYING TO THE PORTION A CHEMICAL ETCHANT EQUIVALENT TO THAT PRODUCED BY ADMIXING THE FOLLOWING COMPONENTS BY VOLUME FROM 1 TO 10 PARTS OF FUMING RED NITRIC ACID (90%), FROM 1 TO 15 PARTS OF ACETIC ACID (80%), FROM 1 TO 10 ML. OF HYDROFLUORIC ACID (50% HF) AND FROM 0.1 TO 4 ML. OF BROMINE PER 100 ML. OF SOLUTION; PASSING A FORWARD CURRENT THROUGH THE LEADS TO THE P-N JUNCTION AS ETCHING PROGRESSES TO MEASURE SUBSTANTIALLY CONTINUOUSLY THE PEAK-TO-VALLEY CURRENT RATIO AT THE JUNCTION WITHOUT REMOVING THE DEVICE FROM CONTACT WITH THE ETCHANT AND CONTINUING ETCHING UNTIL THE DESIRED PEAK-TO-VALLEY CURRENT RATIO AT THE JUNCTION IS ATTAINED.
References Cited (Backward Citations)
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1967-01-13 | 1967-07-15 | 1968-01-14 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1971-01-13 | 1971-07-15 | 1972-01-14 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1975-01-13 | 1975-07-15 | 1976-01-14 | $7700.00 | Window Closed / Lapsed |