US3116792A
Expired / Lapsed
US
⏱️ 0.0 years remaining
In situ combustion process
Assignee: Phillips Petroleum Co
•
Filing: 1959-07-27
•
Granted: 1964-01-07
•
Expires: 1979-07-27
Abstract
No abstract record available.
Inventors
- 👤 Purre Heino
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-01 22:36
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/243
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
183 words
A PROCESS FOR PRODUCING HYDROCARBONS FROM A PLURALITY OF READILY COMBUSTIBLE UNDERGROUND OIL-BEARING LAYERS RANGING FROM RELATIVELY HIGH TO RELATIVELY LOW NATURAL PERMEABILITY, WHEREIN EACH PAIR OF ADJACENT LAYERS IS SEPARATED BY A RELATIVELY THIN IMPERMEABLE LAYER, WHICH COMPRISES SEPARATELY PRODUCING A LAYER OF HIGH PERMEABILITY BY IGNITING A SECTION THEREOF AROUND A WELL THEREIN, FEEDING O2-CONTAINING COMBUSTION-SUPPORTING GAS TO THE IGNITED ZONE, AND CONTINUING THE INJECTION OF SAID GAS SO AS TO MOVE SAID ZONE TO ANOTHER WELL THEREIN, WHEREBY AT LEAST ONE ADJACENT LESS PERMEABLE LAYER IS HEATED SO AS TO REDUCE THE VISCOSITY OF HYDROCARBONS THEREIN; THEREAFTER, WHILE SAID ADJACENT LAYER IS HOT, PRODUCING SAME BY GAS DRIVE INCLUDING INJECTING A RELATIVELY INERT NON-HYDROCARBON GAS CONTINUOUSLY THROUGH ONE OF SAID WELLS INTO SAID LESS PERMEABLE LAYER AND PRODUCING GAS AND HYDROCARBONS THROUGH THE OTHER WELL, THEREBY INCREASING THE PERMEABILITY THEREOF; AND PRODUCING LAST SAID LAYER BY IN SITU CONBUSTION INCLUDING IGNITING LAST LAYER AROUND ONE OF SAID WELLS AND INJECTING COMBUSTION-SUPPORTING GAS INTO THE IGNITED AREAA THROUGH ONE OF SAID WELLS SO AS TO PRODUCE HYDROCARBONS THROUGH THE OTHER WELL.
Claim 2
Dependent Claim
183 words
A PROCESS FOR PRODUCING HYDROCARBONS FROM A PLURALITY OF READILY COMBUSTIBLE UNDERGROUND OIL-BEARING LAYERS RANGING FROM RELATIVELY HIGH TO RELATIVELY LOW NATURAL PERMEABILITY, WHEREIN EACH PAIR OF ADJACENT LAYERS IS SEPARATED BY A RELATIVELY THIN IMPERMEABLE LAYER, WHICH COMPRISES SEPARATELY PRODUCING A LAYER OF HIGH PERMEABILITY BY IGNITING A SECTION THEREOF AROUND A WELL THEREIN, FEEDING O2-CONTAINING COMBUSTION-SUPPORTING GAS TO THE IGNITED ZONE, AND CONTINUING THE INJECTION OF SAID GAS SO AS TO MOVE SAID ZONE TO ANOTHER WELL THEREIN, WHEREBY AT LEAST ONE ADJACENT LESS PERMEABLE LAYER IS HEATED SO AS TO REDUCE THE VISCOSITY OF HYDROCARBONS THEREIN; THEREAFTER, WHILE SAID ADJACENT LAYER IS HOT, PRODUCING SAME BY GAS DRIVE INCLUDING INJECTING A RELATIVELY INERT NON-HYDROCARBON GAS CONTINUOUSLY THROUGH ONE OF SAID WELLS INTO SAID LESS PERMEABLE LAYER AND PRODUCING GAS AND HYDROCARBONS THROUGH THE OTHER WELL, THEREBY INCREASING THE PERMEABILITY THEREOF; AND PRODUCING LAST SAID LAYER BY IN SITU CONBUSTION INCLUDING IGNITING LAST LAYER AROUND ONE OF SAID WELLS AND INJECTING COMBUSTION-SUPPORTING GAS INTO THE IGNITED AREAA THROUGH ONE OF SAID WELLS SO AS TO PRODUCE HYDROCARBONS THROUGH THE OTHER WELL.
References Cited (Backward Citations)
US2734579A
Cited
US2382471A
Cited
US2584605A
Cited
US2818117A
Cited
US2877847A
Cited
US2917112A
Cited
US2917296A
Cited
US2888987A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1967-01-06 | 1967-07-08 | 1968-01-07 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1971-01-06 | 1971-07-08 | 1972-01-07 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1975-01-06 | 1975-07-08 | 1976-01-07 | $7700.00 | Window Closed / Lapsed |