US2917296A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Recovery of hydrocarbon from oil shale adjoining a permeable oilbearing stratum
Assignee: Phillips Petroleum Co
•
Filing: 1957-03-08
•
Granted: 1959-12-15
•
Expires: 1977-03-08
Abstract
No abstract record available.
Inventors
- 👤 Spencer S Prentiss
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-26 03:40
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/243
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
180 words
A PROCESS FOR RECOVERING FLUID HYDROCARBONS FROM AN OIL-BEARING IMPERMEABLE SHALE AND FROM AN ADJOINING PERMEABLE OIL-BEARING STRATUM WHICH COMPRISES FACTURING SAID SHALE HORIZAONTALLY N AT LEAST ONE LEVEL THEREIN SO THAT THE RESULTING FRACTURES CONNECT WITH A PRODUCTION BOREHOLE THEREIN; INITIATING COMBUSTION IN SAID STRATUM AROUND AN IGNITION BOREHOLE THEREIN AND DRIVING THE RESULTING COMBUSTION FROMT THRU SAID STRATUM TO AN INJECTION BOREHOLE THEREIN BY INVERSE AIR INJECTION THRU SAID INJECTION BOREHOLE WHEREBY HEAT OF COMBUSTION IS PASSED DIRECTLY INTO THE ADJOINING SHALE AND DEROGEN THEREIN IS FLUIDIZED AND DRIVEN THEREFROM INTO SAID PRODUCTION BOREHOLE, RENDERING SAID SHALE PERMEABLE FROM SAID STRATUM TO SAID FRACTURES; AS SAID COMBUSTION FRONT REACHES SAID INJECTION BOREHOLE, CONTINUING THE INJECTION OF AIR THRU SAID INJECTION BOREHOLE SO AS TO DRIVE SIAD FRONT BACK THRU SAID STRATUM, FEEDING ON THE CARBON RESIDUE LEFT BY THE FIRST BURN THRU SO AS TO FURTHER HEAT SAID SHALE AND CAUSE HOT GASES TO PASS THRU THE PERMEABLE SHALE INTO SAID FRACTURES, THEREBY PRODUCING ADDITIONAL HYDROCARBONS THEREFROM; AND RECOVERING THE PRODUCED HYDROCARBONS FROM SAID SHALE AND SAID STRATUM.
Claim 2
Dependent Claim
180 words
A PROCESS FOR RECOVERING FLUID HYDROCARBONS FROM AN OIL-BEARING IMPERMEABLE SHALE AND FROM AN ADJOINING PERMEABLE OIL-BEARING STRATUM WHICH COMPRISES FACTURING SAID SHALE HORIZAONTALLY N AT LEAST ONE LEVEL THEREIN SO THAT THE RESULTING FRACTURES CONNECT WITH A PRODUCTION BOREHOLE THEREIN; INITIATING COMBUSTION IN SAID STRATUM AROUND AN IGNITION BOREHOLE THEREIN AND DRIVING THE RESULTING COMBUSTION FROMT THRU SAID STRATUM TO AN INJECTION BOREHOLE THEREIN BY INVERSE AIR INJECTION THRU SAID INJECTION BOREHOLE WHEREBY HEAT OF COMBUSTION IS PASSED DIRECTLY INTO THE ADJOINING SHALE AND DEROGEN THEREIN IS FLUIDIZED AND DRIVEN THEREFROM INTO SAID PRODUCTION BOREHOLE, RENDERING SAID SHALE PERMEABLE FROM SAID STRATUM TO SAID FRACTURES; AS SAID COMBUSTION FRONT REACHES SAID INJECTION BOREHOLE, CONTINUING THE INJECTION OF AIR THRU SAID INJECTION BOREHOLE SO AS TO DRIVE SIAD FRONT BACK THRU SAID STRATUM, FEEDING ON THE CARBON RESIDUE LEFT BY THE FIRST BURN THRU SO AS TO FURTHER HEAT SAID SHALE AND CAUSE HOT GASES TO PASS THRU THE PERMEABLE SHALE INTO SAID FRACTURES, THEREBY PRODUCING ADDITIONAL HYDROCARBONS THEREFROM; AND RECOVERING THE PRODUCED HYDROCARBONS FROM SAID SHALE AND SAID STRATUM.
References Cited (Backward Citations)
US2734579A
Cited
US1422204A
Cited
US2584605A
Cited
US2596845A
Cited
US2584606A
Cited
US2718263A
Cited
US2780449A
Cited
US2793696A
Cited
US2818118A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1962-12-14 | 1963-06-15 | 1963-12-15 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1966-12-14 | 1967-06-15 | 1967-12-15 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1970-12-14 | 1971-06-15 | 1971-12-15 | $7700.00 | Window Closed / Lapsed |