Patent US3106087A successfully refreshed from Google Patents.
US3106087A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Fluid stream analyzer
Assignee: Phillips Petroleum Co
•
Filing: 1960-05-23
•
Granted: 1963-10-08
•
Expires: 1980-05-23
Abstract
No abstract record available.
Inventors
- 👤 Raymond L Kindred
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-28 10:27
CPC Classifications
G; G01; G01N; G01N30/00; G01N30/02; G01N30/86; G01N30/8651
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
166 words
ANALYSIS APPARATUS COMPRISING (A) ANALYZER MEANS ADAPTED TO ANALYZE AT LEAST A FIRST AND A SECOND CONSTITUENT OF A STREAM OF MATERIAL AND TO GENERATE RESPECTIVELY AT LEAST A FIRST AND A SECOND ELECTRICAL SIGNAL AS EACH OF SAID FIRST AND SAID SECOND CONSTITUENTS IS SENSED BY SAID ANALYZER RESPECTIVELY DURING SUCCESSIVE INTERVALS OF TIME, SAID SIGNALS BEING PRESENT ON AN OUTPUT TERMINAL OF SAID ANALYZER MEANS, (B) A RECTIFIER HAVING ONE TERMINAL THEREOF CONNECTED TO THE SAID OUTPUT OF SAID ANALYZER MEANS, SAID RECTIFIER BEING ADAPTED TO PASS SIGNALS IN A DIRECTION FROM SAID ANALYZER MEANS TO SWITCHING MEANS DETAILED HEREAFTER, (C) FIRST AND SECOND ELECTRICAL SIGNAL STORAGE MEANS, (D) FIRST SWITCHING MEANS ADAPTED TO CONNECT THE SECOND TERMINAL OF SAID RECTIFIER TO SAID FIRST STORAGE MEANS, (E) SECOND SWITCHING MEANS CONNECTING THE SECOND TERMINAL OF SAID RECTIFIER TO SAID SECOND STORAGE MEANS, (F) SIGNAL COMPARING MEANS, (G) THIRD SWITCHING MEANS TO SIMULTANEOUSLY CONNECT SAID FIRST AND SECOND STORAGE MEANS TO SAID SIGNAL COMPARING MEANS,
Claim 2
Dependent Claim
166 words
ANALYSIS APPARATUS COMPRISING (A) ANALYZER MEANS ADAPTED TO ANALYZE AT LEAST A FIRST AND A SECOND CONSTITUENT OF A STREAM OF MATERIAL AND TO GENERATE RESPECTIVELY AT LEAST A FIRST AND A SECOND ELECTRICAL SIGNAL AS EACH OF SAID FIRST AND SAID SECOND CONSTITUENTS IS SENSED BY SAID ANALYZER RESPECTIVELY DURING SUCCESSIVE INTERVALS OF TIME, SAID SIGNALS BEING PRESENT ON AN OUTPUT TERMINAL OF SAID ANALYZER MEANS, (B) A RECTIFIER HAVING ONE TERMINAL THEREOF CONNECTED TO THE SAID OUTPUT OF SAID ANALYZER MEANS, SAID RECTIFIER BEING ADAPTED TO PASS SIGNALS IN A DIRECTION FROM SAID ANALYZER MEANS TO SWITCHING MEANS DETAILED HEREAFTER, (C) FIRST AND SECOND ELECTRICAL SIGNAL STORAGE MEANS, (D) FIRST SWITCHING MEANS ADAPTED TO CONNECT THE SECOND TERMINAL OF SAID RECTIFIER TO SAID FIRST STORAGE MEANS, (E) SECOND SWITCHING MEANS CONNECTING THE SECOND TERMINAL OF SAID RECTIFIER TO SAID SECOND STORAGE MEANS, (F) SIGNAL COMPARING MEANS, (G) THIRD SWITCHING MEANS TO SIMULTANEOUSLY CONNECT SAID FIRST AND SECOND STORAGE MEANS TO SAID SIGNAL COMPARING MEANS,
References Cited (Backward Citations)
US2712128A
Cited
FR880182A
Cited
US2823351A
Cited
US2617586A
Cited
US2896165A
Cited
US2869853A
Cited
US2875606A
Cited
US3002818A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1966-10-07 | 1967-04-08 | 1967-10-08 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1970-10-07 | 1971-04-08 | 1971-10-08 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1974-10-07 | 1975-04-08 | 1975-10-08 | $7700.00 | Window Closed / Lapsed |