Patent US3130459A successfully refreshed from Google Patents.
Patent US3038847A successfully refreshed from Google Patents.
← Back to Patent Explorer
US3038847A Expired / Lapsed US ⏱️ 0.0 years remaining

Reactor control

Assignee: Bendix Corp
•
Filing: 1957-01-22
•
Granted: 1962-06-12
•
Expires: 1977-01-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 William J Hartin

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 07:11
CPC Classifications
G; G21; G21C; G21C7/00; G21C7/36; Y; Y02; Y02E; Y02E30/00; Y02E30/30

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 166 words
IN A NULCEAR FISSION REACTOR HAVING POSITIONING RODS FOR VARYING THE COEFFICIENT OF MULTIPLICATION OF THE NEURON OUTPUT OF THE REACTOR, MEANS FOR CONTROLLING THE POSITION OF SAID RODS COMPRISING: A SEROMECHANISM OPERATIVELY CONNECTED TO AND ADAPTED TO VARY THE POSITION OF SAID RODS WITH RESPECT TO SAID REACTOR IN ACCORDANCE WITH A CONTROL SIGNAL APPLIED TO IT; MEANS FOR PRODUCING A FIRST ELECTRICAL SIGNAL WHICH IS PROPORTIONAL TO THE POWER OUTPUT OF SAID REACTOR; MEANS FOR PRODUCING A SECOND ELECTRICAL SIGNAL WHICH IS PROPORTIONAL TO THE POWER OUTPUT WHICH IT IS DESIRED TO OBTAIN FROM SAID REACTOR; MEANS FOR PRODUCING A THIRD ELECTRICAL SIGNAL WHICH IS PROPORTIONAL TO THE RATE OF INCREASE OF NEUTRONS WITHIN THE REACTOR; MEANS FOR REDUCING SAID SECOND SIGNAL IN PROPORTION TO THE MAGNITUDE OF THE SECOND SIGNAL AND ALSO IN PROPORTION TO THE MAGNITUDE OF THE THIRD SIGNAL; AND MEANS OPERATIVELY CONNECTED TO SAID SERVOMECHANISM FOR ALGEBRAICALLY COMBINING SAID FIRST AND MODIFIED SECOND SIGNALS SO AS TO CONTROL SAID SERVOMECHANISM.
Claim 2
Dependent Claim 166 words
IN A NULCEAR FISSION REACTOR HAVING POSITIONING RODS FOR VARYING THE COEFFICIENT OF MULTIPLICATION OF THE NEURON OUTPUT OF THE REACTOR, MEANS FOR CONTROLLING THE POSITION OF SAID RODS COMPRISING: A SEROMECHANISM OPERATIVELY CONNECTED TO AND ADAPTED TO VARY THE POSITION OF SAID RODS WITH RESPECT TO SAID REACTOR IN ACCORDANCE WITH A CONTROL SIGNAL APPLIED TO IT; MEANS FOR PRODUCING A FIRST ELECTRICAL SIGNAL WHICH IS PROPORTIONAL TO THE POWER OUTPUT OF SAID REACTOR; MEANS FOR PRODUCING A SECOND ELECTRICAL SIGNAL WHICH IS PROPORTIONAL TO THE POWER OUTPUT WHICH IT IS DESIRED TO OBTAIN FROM SAID REACTOR; MEANS FOR PRODUCING A THIRD ELECTRICAL SIGNAL WHICH IS PROPORTIONAL TO THE RATE OF INCREASE OF NEUTRONS WITHIN THE REACTOR; MEANS FOR REDUCING SAID SECOND SIGNAL IN PROPORTION TO THE MAGNITUDE OF THE SECOND SIGNAL AND ALSO IN PROPORTION TO THE MAGNITUDE OF THE THIRD SIGNAL; AND MEANS OPERATIVELY CONNECTED TO SAID SERVOMECHANISM FOR ALGEBRAICALLY COMBINING SAID FIRST AND MODIFIED SECOND SIGNALS SO AS TO CONTROL SAID SERVOMECHANISM.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1965-06-11 1965-12-11 1966-06-12 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1969-06-11 1969-12-11 1970-06-12 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1973-06-11 1973-12-11 1974-06-12 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag