← Back to Patent Explorer
US3024841A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of oil recovery by in situ combustion

Assignee: Jersey Production Research Co
•
Filing: 1958-07-30
•
Granted: 1962-03-13
•
Expires: 1978-07-30
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Bertram T Willman

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 04:34
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/243

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 112 words
AN IMPROVED OIL RECOVERY PROCESS WHICH CONSISTS ESSENTIALLY OF INJECTING FROM ABOUT0.05 TO ABOUT 0.55 PORE VOLUME OF WATER INTO AN UNDERGROUNG OIL-BEARING RESERVOIR TO FORM A WATER BANK ABOUT AN INJECTION WELL PENETRATING SAID RESERVOIR, ESTABLISHING A COMBUSTION FRONT IN SAID RESERVOIR BEHIND SAIDWATER BANK BY INITIATING COMBUSTION OF CRUDE OIL IN THE IMMEDIATE VICINITY OF SAID INJECTION WELL, INJECTING A COMBUSTION-SUPPORTING GAS INTO SAID RESERVOIR THROUGH SAID INJECTION WELL TO ADVANCE SAID COMBUSTION FRONT AND WATER BANK TOWARD A PRODUCTION WELL PENETRATING SAID RESERVOIR AND SECURE STEAM DISTILLATION OF CRUDE OIL IN ADVANCE OF SAID WATER BANK, AND RECOVERING OIL, GAS AND WATER FROM SAID RESERVOIR THROUGH SAID PRODUCTION WELL.
Claim 2
Dependent Claim 112 words
AN IMPROVED OIL RECOVERY PROCESS WHICH CONSISTS ESSENTIALLY OF INJECTING FROM ABOUT0.05 TO ABOUT 0.55 PORE VOLUME OF WATER INTO AN UNDERGROUNG OIL-BEARING RESERVOIR TO FORM A WATER BANK ABOUT AN INJECTION WELL PENETRATING SAID RESERVOIR, ESTABLISHING A COMBUSTION FRONT IN SAID RESERVOIR BEHIND SAIDWATER BANK BY INITIATING COMBUSTION OF CRUDE OIL IN THE IMMEDIATE VICINITY OF SAID INJECTION WELL, INJECTING A COMBUSTION-SUPPORTING GAS INTO SAID RESERVOIR THROUGH SAID INJECTION WELL TO ADVANCE SAID COMBUSTION FRONT AND WATER BANK TOWARD A PRODUCTION WELL PENETRATING SAID RESERVOIR AND SECURE STEAM DISTILLATION OF CRUDE OIL IN ADVANCE OF SAID WATER BANK, AND RECOVERING OIL, GAS AND WATER FROM SAID RESERVOIR THROUGH SAID PRODUCTION WELL.

References Cited (Backward Citations)

US2390770A Cited
US2584606A Cited
US2642943A Cited
GB696524A Cited
US2780449A Cited
US2796132A Cited
US2839141A Cited
US2917296A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1965-03-12 1965-09-11 1966-03-13 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1969-03-12 1969-09-11 1970-03-13 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1973-03-12 1973-09-11 1974-03-13 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag