Patent US2992892A successfully refreshed from Google Patents.
← Back to Patent Explorer
US2992892A Expired / Lapsed US ⏱️ 0.0 years remaining

Process for precipitating a vanadium oxide product

Assignee: KERR MC GEE OIL IND Inc
•
Filing: 1957-05-31
•
Granted: 1961-07-18
•
Expires: 1977-05-31
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Mayer B Goren

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 08:36
CPC Classifications
C; C01; C01G; C01G31/00; C01G31/02; C01P; C01P2006/00; C01P2006/80

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 118 words
A CONTINUOUS PROCESS FOR THE PRECIPITATION OF A VANADIUM OXIDE PRODUCT COMPRISING PASSING A LIQUOR CONTAINING VANADIUM VALUES IN SOLUTION THROUGH A SERIES OF AT LEAST THREE PRIMARY REACTORS, THE LIQUOR HAVING A TEMPERATURE BETWEEN ABOUT 80*C. ATND THE BOILING POINT AND A PH OF ABOUT 0.5-1.7, THE VANADIUM CONTENT OF THE LIQUOR BEING SUBSTANTIALLY ALL IN THE PLUS 5 OXIDATION STATE WHILE WITHIN THE PRIMARY REACTORS, THE RESIDENCE TIME OF THE LIQUOR WITHIN EACH OF THE PRIMARY REACTORS BEING BETWEEN ABOUT THIRTY SECONDS AND THREE MINUTES WITH THE TOTAL RESIDENCE TIME OF THE LIQUOR WITHIN THE PRIMARY REACTORS BEING AT LEAST SIX MINUTES, AND PRECIPITATING VANADIUM OXIDE PRODUCT FROM THE LIQUOR WHILE PASSING THROUGH THE PRIMARY REACTORS.
Claim 2
Dependent Claim 118 words
A CONTINUOUS PROCESS FOR THE PRECIPITATION OF A VANADIUM OXIDE PRODUCT COMPRISING PASSING A LIQUOR CONTAINING VANADIUM VALUES IN SOLUTION THROUGH A SERIES OF AT LEAST THREE PRIMARY REACTORS, THE LIQUOR HAVING A TEMPERATURE BETWEEN ABOUT 80*C. ATND THE BOILING POINT AND A PH OF ABOUT 0.5-1.7, THE VANADIUM CONTENT OF THE LIQUOR BEING SUBSTANTIALLY ALL IN THE PLUS 5 OXIDATION STATE WHILE WITHIN THE PRIMARY REACTORS, THE RESIDENCE TIME OF THE LIQUOR WITHIN EACH OF THE PRIMARY REACTORS BEING BETWEEN ABOUT THIRTY SECONDS AND THREE MINUTES WITH THE TOTAL RESIDENCE TIME OF THE LIQUOR WITHIN THE PRIMARY REACTORS BEING AT LEAST SIX MINUTES, AND PRECIPITATING VANADIUM OXIDE PRODUCT FROM THE LIQUOR WHILE PASSING THROUGH THE PRIMARY REACTORS.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1964-07-17 1965-01-16 1965-07-18 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1968-07-17 1969-01-16 1969-07-18 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1972-07-17 1973-01-16 1973-07-18 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag