Patent US2877101A successfully refreshed from Google Patents.
← Back to Patent Explorer
US2877101A Expired / Lapsed US ⏱️ 0.0 years remaining

Fluid-liquid contacting system

Assignee: Phillips Petroleum Co
•
Filing: 1956-08-13
•
Granted: 1959-03-10
•
Expires: 1976-08-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Walter T Rector

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 06:02
CPC Classifications
B; B01; B01D; B01D47/00; B01D11/00; B01D11/04; B01D11/0426; B01D11/0488

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 176 words
A CONTINOUS MULTI-STAGE FLUID-LIQUID CONTACTING OPERATION COMPRISING WITHDRAWING A PREVIOUSLY USED CONTACTING LIQUID FROM A FIRST RUN STORAGE ZONE IN THE ABSENCE OF INTRODUCTION OF CONTACTING LIQUID INTO SAID FIRST RUN STORAGE ZONE, INTRODUCING A FLUID, AND A PORTION OF A SECOND QUANTITY OF SAID CONTACTING LIQUID FROM A SECOND RUN STORAGE ZONE DIRECTLY INTO A FIRST CONTACTING ZONE, PASSING FLUID FROM SAID FIRST CONTACTING ZONE, AND ANOTHER PORTION OF CONTACTING LIQUID DIRECTLY FROM ASID SECOND STORAGE ZONE INTO A SECOND CONTACTING ZONE, REMOVING FLUID FROM THIS LATTER CONTACTING ZONE AS THE PRODUCT OF THE OPERATION, PASSING SAID CONTACTING LIQUID FROM SAID FRIST AND SAID SECOND CONTACTING ZONES INTO SAID SECOND RUN STORAGE ZONE, UPON SUBSTANTIAL COMPLETION OF WITHDRAWAL OF CONTACTING LIQUID FROM SAID FIRST STORAGE ZONE PASSING SAID CONTACTING LIQUID FROM SAID FIRST CONTACTING ZONE INTO SAID FIRST STORAGE ZONE UNTIL SAID SECOND STORAGE ZONE IS SUBSTANTIALLY DEPLETED OF CONTACTING LIQUID THEN PASSING CONTACTING LIQUID FROM SAID FIRST STORAGE ZONE TO SAIC FIRST CONTACTING ZONE AND INTRODUCING FRESH CONTACTING LIQUID INTO SAID SECOND CONTACTING ZONE.
Claim 2
Dependent Claim 176 words
A CONTINOUS MULTI-STAGE FLUID-LIQUID CONTACTING OPERATION COMPRISING WITHDRAWING A PREVIOUSLY USED CONTACTING LIQUID FROM A FIRST RUN STORAGE ZONE IN THE ABSENCE OF INTRODUCTION OF CONTACTING LIQUID INTO SAID FIRST RUN STORAGE ZONE, INTRODUCING A FLUID, AND A PORTION OF A SECOND QUANTITY OF SAID CONTACTING LIQUID FROM A SECOND RUN STORAGE ZONE DIRECTLY INTO A FIRST CONTACTING ZONE, PASSING FLUID FROM SAID FIRST CONTACTING ZONE, AND ANOTHER PORTION OF CONTACTING LIQUID DIRECTLY FROM ASID SECOND STORAGE ZONE INTO A SECOND CONTACTING ZONE, REMOVING FLUID FROM THIS LATTER CONTACTING ZONE AS THE PRODUCT OF THE OPERATION, PASSING SAID CONTACTING LIQUID FROM SAID FRIST AND SAID SECOND CONTACTING ZONES INTO SAID SECOND RUN STORAGE ZONE, UPON SUBSTANTIAL COMPLETION OF WITHDRAWAL OF CONTACTING LIQUID FROM SAID FIRST STORAGE ZONE PASSING SAID CONTACTING LIQUID FROM SAID FIRST CONTACTING ZONE INTO SAID FIRST STORAGE ZONE UNTIL SAID SECOND STORAGE ZONE IS SUBSTANTIALLY DEPLETED OF CONTACTING LIQUID THEN PASSING CONTACTING LIQUID FROM SAID FIRST STORAGE ZONE TO SAIC FIRST CONTACTING ZONE AND INTRODUCING FRESH CONTACTING LIQUID INTO SAID SECOND CONTACTING ZONE.

References Cited (Backward Citations)

FR970110A Cited
GB727379A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1962-03-09 1962-09-08 1963-03-10 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1966-03-09 1966-09-08 1967-03-10 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1970-03-09 1970-09-08 1971-03-10 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag