Patent US2839142A successfully refreshed from Google Patents.
US2839142A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Permanent well completion method
Assignee: ExxonMobil Technology and Engineering Co
•
Filing: 1954-05-05
•
Granted: 1958-06-17
•
Expires: 1974-05-05
Abstract
No abstract record available.
Inventors
- 👤 Theodore A Huber
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-04 15:49
CPC Classifications
E; E21; E21B; E21B33/00; E21B33/10; E21B33/12; E21B33/127; E21B33/1275; E21B33/129; E21B33/1295; E21B43/00; E21B43/14
Claims Analysis
Total Claims: 2
Claim 1
Independent Claim
255 words
A METHOD FOR COMPLETING AND SERVICING A CASED WELL IN WHICH A TUBING STRING IS PERMANENTLY ARRANGED IN A CASING WITH ITS LOWER OPEN END AT A LEVEL ABOVE THE HIGHEST OF A PLURALITY OF HYDROCARBON PRODUCTIVE STRATA WITHOUT KILLING THE WELL WHICH COMPRISES OBTAINING PRODUCTION OF HYDROCARBONS FROM A FIRST INTERVAL IN SAID CASING UNTIL PRODUCTION OF SAID HYDROCARBONS DECLINES, LOWERING A MOVABLE BARRIER THROUGH SAID TUBING, PLACING SAID BARRIER AT A LEVEL IN SAID CASING ABOVE SAID FIRST INTERVAL BUT BELOW A SECOND HYDROCARBON PRODUCTIVE INTERVAL, OBTSTRUCTING SAID CASING WITH SAID BARRIER TO TERMINATE PRODUCTION FROM SAID FIRST INTERVAL, LOWERING A PERFORATOR THROUGH SAID TUBING TO A LEVEL ADJACENT SAID SECOND INTERVAL, PERFORATING SAID CASING IN SAID SECOND INTERVAL WITH SAID PERFORATOR AND OBTAINING PRODUCTION OF HYDROCARBONS FROM SAID SECOND INTERVAL, MOVING SAID BARRIER FROM SAID LEVEL ABOVE SAID FIRST INTERVAL, PLACING SAID BARRIER AT A LEVEL ABOVE SAID SECOND INTERVAL BUT BELOW A THIRD HYDROCARBON PRODUCTIVE INTERVAL OBSTRUCTING SAID CASING WITH SAID BARRIER TO TERMINATE PRODUCTION FROM SAID SECOND INTERVAL, LOWERING SAID PERFORATOR THROUGH SAID TUBING TO A LEVEL ADJACENT SAID THIRD INTERVAL, AND THEN PERFORATING SAID CASING IN SAID THIRD INTERVAL AND OBTAINING PRODUCTION OF HYDROCARBONS FROM SAID THIRD INTERVAL, THE PERFORATIONS IN ALL OF SAID INTERVALS REMAINING OPEN INTO THE WELL SAID MOVABLE BARRIER OBSTRUCTING FLOW FROM THE FIRST INTERVAL WHILE PRODUCTION IS BEING OBTAINED FROM THE SECOND INTERVAL AND SAID MOVABLE BARRIER OBSTRUCTING FLOW FROM THE FIRST AND SECOND INTERVALS WHILE PRODUCTION IS BEING OBTAINED FROM THE THIRD INTERVAL.
Claim 2
Independent Claim
255 words
A METHOD FOR COMPLETING AND SERVICING A CASED WELL IN WHICH A TUBING STRING IS PERMANENTLY ARRANGED IN A CASING WITH ITS LOWER OPEN END AT A LEVEL ABOVE THE HIGHEST OF A PLURALITY OF HYDROCARBON PRODUCTIVE STRATA WITHOUT KILLING THE WELL WHICH COMPRISES OBTAINING PRODUCTION OF HYDROCARBONS FROM A FIRST INTERVAL IN SAID CASING UNTIL PRODUCTION OF SAID HYDROCARBONS DECLINES, LOWERING A MOVABLE BARRIER THROUGH SAID TUBING, PLACING SAID BARRIER AT A LEVEL IN SAID CASING ABOVE SAID FIRST INTERVAL BUT BELOW A SECOND HYDROCARBON PRODUCTIVE INTERVAL, OBTSTRUCTING SAID CASING WITH SAID BARRIER TO TERMINATE PRODUCTION FROM SAID FIRST INTERVAL, LOWERING A PERFORATOR THROUGH SAID TUBING TO A LEVEL ADJACENT SAID SECOND INTERVAL, PERFORATING SAID CASING IN SAID SECOND INTERVAL WITH SAID PERFORATOR AND OBTAINING PRODUCTION OF HYDROCARBONS FROM SAID SECOND INTERVAL, MOVING SAID BARRIER FROM SAID LEVEL ABOVE SAID FIRST INTERVAL, PLACING SAID BARRIER AT A LEVEL ABOVE SAID SECOND INTERVAL BUT BELOW A THIRD HYDROCARBON PRODUCTIVE INTERVAL OBSTRUCTING SAID CASING WITH SAID BARRIER TO TERMINATE PRODUCTION FROM SAID SECOND INTERVAL, LOWERING SAID PERFORATOR THROUGH SAID TUBING TO A LEVEL ADJACENT SAID THIRD INTERVAL, AND THEN PERFORATING SAID CASING IN SAID THIRD INTERVAL AND OBTAINING PRODUCTION OF HYDROCARBONS FROM SAID THIRD INTERVAL, THE PERFORATIONS IN ALL OF SAID INTERVALS REMAINING OPEN INTO THE WELL SAID MOVABLE BARRIER OBSTRUCTING FLOW FROM THE FIRST INTERVAL WHILE PRODUCTION IS BEING OBTAINED FROM THE SECOND INTERVAL AND SAID MOVABLE BARRIER OBSTRUCTING FLOW FROM THE FIRST AND SECOND INTERVALS WHILE PRODUCTION IS BEING OBTAINED FROM THE THIRD INTERVAL.
References Cited (Backward Citations)
US2016919A
Cited
US2029491A
Cited
US2168116A
Cited
US2159640A
Cited
US2187487A
Cited
US2262117A
Cited
US2189703A
Cited
US2368428A
Cited
US2374922A
Cited
US2543814A
Cited
US2714931A
Cited
US2749989A
Cited
US2781852A
Cited
US2781853A
Cited
US2760578A
Cited
US2776013A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1961-06-16 | 1961-12-16 | 1962-06-17 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1965-06-16 | 1965-12-16 | 1966-06-17 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1969-06-16 | 1969-12-16 | 1970-06-17 | $7700.00 | Window Closed / Lapsed |