Patent US2805142A successfully refreshed from Google Patents.
← Back to Patent Explorer
US2805142A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for the production of pure iron, and iron carbon alloys including carbon and alloy steel

Assignee: JAMES E BRASSERT
•
Filing: 1954-02-09
•
Granted: 1957-09-03
•
Expires: 1974-02-09
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Arata Vincenzo Stefano

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 09:03
CPC Classifications
C; C21; C21B; C21B13/00; C21B13/12; C21B13/14

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 168 words
THE METHOD OF OPERATING A PLANT FOR THE PRODUCTION OF MOLTEN PURE IRON AND IRON CARBON ALLOYS FROM ORES, SAID PLANT BEING OF THE TYPE INCLUDING ONE OR MORE PLANT UNITS, EACH UNIT COMPRISING TWO OR MORE ELECTRIC FURNACES CONNECTED WITH EACH OTHER IN PARRALLEL WITH RESPECT TO THE IN-FLOW OF SOLID CHARGE MATERIAL AND THE OUT-FLOW OF EVOLVED GAS AND ONE OR MORE PREHEATING CHAMBERS CONNECTED IN SERIES WITH SAID FURNACES WITH RESPECT TO SAID FLOWS, IN WHICH THE CYCLE OF EACH INDIVIDUAL FURNACE INCLUDES A REDUCTION PERIOD DURING WHICH THE FLOW OF EVOLCED GASES FROM SAID FURNACE IS CONNECTED SO AS TO PREHEAT SOLID CHARGE MATERIALS CONTINOUSLY ENTERING SAID FURNACE FROM ONE OR MORE OF THE PREHEATING CHAMBERS BY CONTERCURRENT FLOW IN SUCH CHAMBER, A BATCH REFINING PERIOD DURING WHICH SAID FURNACE IS DISCONNECTED FROM THE REST OF THE UNIT WITH RESPECT TO THE FLOWS OF SOLID CHARGE MATERIALS AND EVOLVED GAS, AND A REPAIR PERIOD DURING WHICH SAID FURNACE IS CONDITIONED FOR THE SUCCEEDING CYCLE.
Claim 2
Independent Claim 168 words
THE METHOD OF OPERATING A PLANT FOR THE PRODUCTION OF MOLTEN PURE IRON AND IRON CARBON ALLOYS FROM ORES, SAID PLANT BEING OF THE TYPE INCLUDING ONE OR MORE PLANT UNITS, EACH UNIT COMPRISING TWO OR MORE ELECTRIC FURNACES CONNECTED WITH EACH OTHER IN PARRALLEL WITH RESPECT TO THE IN-FLOW OF SOLID CHARGE MATERIAL AND THE OUT-FLOW OF EVOLVED GAS AND ONE OR MORE PREHEATING CHAMBERS CONNECTED IN SERIES WITH SAID FURNACES WITH RESPECT TO SAID FLOWS, IN WHICH THE CYCLE OF EACH INDIVIDUAL FURNACE INCLUDES A REDUCTION PERIOD DURING WHICH THE FLOW OF EVOLCED GASES FROM SAID FURNACE IS CONNECTED SO AS TO PREHEAT SOLID CHARGE MATERIALS CONTINOUSLY ENTERING SAID FURNACE FROM ONE OR MORE OF THE PREHEATING CHAMBERS BY CONTERCURRENT FLOW IN SUCH CHAMBER, A BATCH REFINING PERIOD DURING WHICH SAID FURNACE IS DISCONNECTED FROM THE REST OF THE UNIT WITH RESPECT TO THE FLOWS OF SOLID CHARGE MATERIALS AND EVOLVED GAS, AND A REPAIR PERIOD DURING WHICH SAID FURNACE IS CONDITIONED FOR THE SUCCEEDING CYCLE.

References Cited (Backward Citations)

GB191122236A Cited
GB309458A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1960-09-02 1961-03-04 1961-09-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1964-09-02 1965-03-04 1965-09-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1968-09-02 1969-03-04 1969-09-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag