Patent US2583205A successfully refreshed from Google Patents.
Patent US2800183A successfully refreshed from Google Patents.
← Back to Patent Explorer
US2800183A Expired / Lapsed US ⏱️ 0.0 years remaining

Determination of the location of the flame front in a subterranean formation

Assignee: ExxonMobil Oil Corp
•
Filing: 1953-11-09
•
Granted: 1957-07-23
•
Expires: 1973-11-09
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Jenkins Rodman

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 18:49
CPC Classifications
E; E21; E21B; E21B43/00; E21B43/16; E21B43/24; E21B43/243

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 183 words
IN THE PROCESS FOR THE RECOVERY OF HYDROCARBON MATERIALS FROM A SUBTERRANEAN FORMATION CONTAINING HYDROCARBOSN AND HAVING AN IMPUT WELL LEADING THERETO AND AT LEAST ONR OUTPUT WELL LEADING THEREFROM BY COMBUSTION WITHIN SAID SUBTERRANEAN FORMATION WHEREIN FLAME FRONT TRAVELS THROUGH SAID SUBTERRABEAB FORMATION FLAME FROM TRAVELS THROUGH SAID SUBTERRANEAN FORMATION FROM SAID INPUT WELL TO SAID OUTPUT WELL, THE STEPS COMAND SAID OUTPUT WELL AND THE THICKNESS OF SAID SUBTERRANEAN FORMATION, DETERMINING THE POROSITY OF SAID SUBTERRANEAN FORMATION, DETERMINING PRIOR TO INITIATION OF COMBUSTION WITHIN SAID SUBTERRANEAN FORMATION, PASSING GAS SATURATION OF SAID SUBTERRANEAN FORMATION, PASSING GAS PRIOR TO INITIATION OF COMBUSTION EITHIN SAID SUBTERRANEAN FORMATION THROUGH SAID SUBTERRANEAN FORMATION BETWEEN SAID INPUT WELL SAID AND AT A KNOWN GAS PRESSURE AT SAID INPUT WELL AND AT SAID OUTPUT WELL WHEREBY THE VALUE OF A FIRST DIMENSIONLESS TIME FACTOR O RELATED TO THE PRESSURE AT WHICH GAS REACHES SAID OUTPUT WELL AND THE PRESSURE AT WHICH GAS REACHES SAID OUTPUT WELL MAY BE TAKEN FROM THE ACCOMPNYING FIGURE, INITIATING COMBUSTION WITHIN SAID SUBTERRANEAN FORMATION, SUPPLYING COMBUSTION SUPPORTING GAS TO SAID SUBTERRANEAN FORMA-
Claim 2
Dependent Claim 183 words
IN THE PROCESS FOR THE RECOVERY OF HYDROCARBON MATERIALS FROM A SUBTERRANEAN FORMATION CONTAINING HYDROCARBOSN AND HAVING AN IMPUT WELL LEADING THERETO AND AT LEAST ONR OUTPUT WELL LEADING THEREFROM BY COMBUSTION WITHIN SAID SUBTERRANEAN FORMATION WHEREIN FLAME FRONT TRAVELS THROUGH SAID SUBTERRABEAB FORMATION FLAME FROM TRAVELS THROUGH SAID SUBTERRANEAN FORMATION FROM SAID INPUT WELL TO SAID OUTPUT WELL, THE STEPS COMAND SAID OUTPUT WELL AND THE THICKNESS OF SAID SUBTERRANEAN FORMATION, DETERMINING THE POROSITY OF SAID SUBTERRANEAN FORMATION, DETERMINING PRIOR TO INITIATION OF COMBUSTION WITHIN SAID SUBTERRANEAN FORMATION, PASSING GAS SATURATION OF SAID SUBTERRANEAN FORMATION, PASSING GAS PRIOR TO INITIATION OF COMBUSTION EITHIN SAID SUBTERRANEAN FORMATION THROUGH SAID SUBTERRANEAN FORMATION BETWEEN SAID INPUT WELL SAID AND AT A KNOWN GAS PRESSURE AT SAID INPUT WELL AND AT SAID OUTPUT WELL WHEREBY THE VALUE OF A FIRST DIMENSIONLESS TIME FACTOR O RELATED TO THE PRESSURE AT WHICH GAS REACHES SAID OUTPUT WELL AND THE PRESSURE AT WHICH GAS REACHES SAID OUTPUT WELL MAY BE TAKEN FROM THE ACCOMPNYING FIGURE, INITIATING COMBUSTION WITHIN SAID SUBTERRANEAN FORMATION, SUPPLYING COMBUSTION SUPPORTING GAS TO SAID SUBTERRANEAN FORMA-
Claim 3
Dependent Claim 3 words
339QT $= $HL2(P+P)S
Claim 4
Dependent Claim 3 words
339QT $= $HL2(P+P)S

References Cited (Backward Citations)

US2390770A Cited
US2578500A Cited
US2642943A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1960-07-22 1961-01-21 1961-07-23 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1964-07-22 1965-01-21 1965-07-23 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1968-07-22 1969-01-21 1969-07-23 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag