Patent US2581669A successfully refreshed from Google Patents.
← Back to Patent Explorer
US2581669A Expired / Lapsed US ⏱️ 0.0 years remaining

Gas turbine power plant with tank supplied by long conduit having volume over six times that of the intermittent combustion gas generator

Assignee: Individual
•
Filing: 1945-04-13
•
Granted: 1952-01-08
•
Expires: 1965-04-13
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Nina K Guercken

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-08 15:51
CPC Classifications
F; F02; F02B; F02B71/00; F02B71/04; F02B71/06

Claims Analysis

Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.

References Cited (Backward Citations)

GB176838A Cited
US1593571A Cited
FR626976A Cited
GB308595A Cited
GB424955A Cited
US2102559A Cited
US2113480A Cited
US2134285A Cited
US2123569A Cited
US2281585A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1955-01-07 1955-07-09 1956-01-08 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 1959-01-07 1959-07-09 1960-01-08 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 1963-01-07 1963-07-09 1964-01-08 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag