US2581669A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Gas turbine power plant with tank supplied by long conduit having volume over six times that of the intermittent combustion gas generator
Assignee: Individual
•
Filing: 1945-04-13
•
Granted: 1952-01-08
•
Expires: 1965-04-13
Abstract
No abstract record available.
Inventors
- 👤 Nina K Guercken
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-02 01:37
CPC Classifications
F; F02; F02B; F02B71/00; F02B71/04; F02B71/06
Claims Analysis
Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.
References Cited (Backward Citations)
GB176838A
Cited
US1593571A
Cited
FR626976A
Cited
GB308595A
Cited
GB424955A
Cited
US2102559A
Cited
US2113480A
Cited
US2134285A
Cited
US2123569A
Cited
US2281585A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1955-01-07 | 1955-07-09 | 1956-01-08 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 1959-01-07 | 1959-07-09 | 1960-01-08 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 1963-01-07 | 1963-07-09 | 1964-01-08 | $7700.00 | Window Closed / Lapsed |