Patent JPS6350608A successfully refreshed from Google Patents.
← Back to Patent Explorer
JPS6350608A Expired / Lapsed JP ⏱️ 0.0 years remaining

Control process for non-interference flow inside turbine

Assignee: Hitachi Ltd
•
Filing: 1986-08-20
•
Granted: —
•
Expires: 2006-08-20
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract PURPOSE:To force condensed water flow control to make follow-up control with the same responsiveness as that in extracted steam flow control by providing an inside non-interference operational unit in a operational variable calculation routine. CONSTITUTION:An optimum operational point (extracted steam quantity condensed water quantity) is calculated, in the turbine load distributing calculation 1, from various characteristics, regulating conditions and evaluation function of a boiler, a turbine, etc. The deviation from the present operational point is obtained in a control deviation calculation 2 and flow operational variable is calculated by means of PID operation 3, and inside non-interface operation 4, and it is converted to pulse operational variable in a pulse operational variable calculation 5. Thereby, the non-interference flow control of the turbine can be carried out.

Inventors

  • 👤 Takao Okada
  • 👤 岡田 恭男

Bibliographic Details

Application Number —
Jurisdiction JP
Data Source google_patents
Last Synchronized 2026-11-09 00:58
CPC Classifications
—

Claims Analysis

Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag