Patent EP0859752A1 successfully refreshed from Google Patents.
EP0859752A1
Expired / Lapsed
EP
⏱️ 0.0 years remaining
Integration of steam reforming unit and cogeneration power plant
Assignee: ExxonMobil Oil Corp
•
Filing: 1996-05-24
•
Granted: —
•
Expires: 2016-05-24
Abstract
Abstract A process for integration of a steam reforming unit and a cogeneration power plant in which the steam reforming unit comprises two communicating fluid beds. The first fluid bed comprises a reformer containing catalyst; the second fluid bed comprises a combustor/regenerator which receives spent catalyst and provide heat to heat the catalyst. The integration of the two units is brought about by drawing off a portion of compressed air from the power plant gas turbine equipped with an air compressor and introducing the drawn off compressed air to the combustor/regenerator.
Inventors
- 👤 Ronald Joseph Cimini
- 👤 David Owen Marler
- 👤 Reuel Shinnar
- 👤 Gerald Joseph Teitman
Bibliographic Details
Application Number
—
Jurisdiction
EP
Data Source
google_patents
Last Synchronized
2026-10-25 04:52
CPC Classifications
C; C01; C01B; C01B3/00; C01B3/02; C01B3/32; C01B3/34; C01B3/38; C01B3/42; Y; Y02; Y02E; Y02E20/00; Y02E20/16; Y02P; Y02P20/00; Y02P20/50; Y02P20/584
Claims Analysis
Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.
References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
Maintenance schedule is calculated for granted US utility patents.