Patent EP0595175B1 successfully refreshed from Google Patents.
EP0595175B1
Expired / Lapsed
EP
⏱️ 0.0 years remaining
Device for the supply of CVD-deposition-equipment
Assignee: Schott AG
•
Filing: 1993-10-20
•
Granted: 1996-02-14
•
Expires: 2013-10-20
Abstract
No abstract record available.
Inventors
- 👤 Hans-Joachim Bittner
- 👤 Hans-Jürgen Klein
- 👤 Thomas Küpper
- 👤 Ewald Mörsen
Bibliographic Details
Application Number
—
Jurisdiction
EP
Data Source
google_patents
Last Synchronized
2026-11-09 01:54
CPC Classifications
C; C23; C23C; C23C16/00; C23C16/44; C23C16/448
Claims Analysis
Total Claims: 11
Claim 1
Independent Claim
170 words
A device for the supply of at least one CVD coating device with coating gas, with at least one storage tank for the coating material and a pipeline system between storage tank and coating device, mass flow regulators and/or valves and an intermediate tank being arranged in the pipeline system, which tank serves for receiving the gaseous coating material, characterised in that the intermediate tank is an intermediate reservoir (9), the volume of which is adapted to a predetermined maximum pressure change in the intermediate reservoir (9) when the gaseous mass needed for a coating is drawn off, the intermediate reservoir (9) having a volume V z with 0.1V < V z < 10V, where V = M/P z . (Δp/p) z *) M = total mass flow of the coating gas in mbar . l/sec (Δp/p) z * = predetermined relative pressure change per sec in the intermediate reservoir p z = pressure in the intermediate reservoir in mbar with p z > process pressure in the coating device.
Claim 2
Dependent Claim
35 words
A device as claimed in claim 1, characterised in that the intermediate reservoir (9) has a pressure gauge (14) and a temperature sensor (15), the temperature sensor (15) being connected to a control device (21).
Claim 3
Dependent Claim
47 words
A device as claimed in claim 2, characterised in that the pressure gauge (14) is electrically connected by way of a control device (16) to a control valve or mass flow regulator (8) arranged in the pipeline (7) between storage tanks (1, 2) and intermediate reservoir (9).
Claim 4
Independent Claim
54 words
A device as claimed in claims 1 to 3, characterised in that the intermediate reservoir (9) has a level gauge (17), which is electrically connected by way of the control device (16) to a valve or mass flow regulator (8) arranged in the pipeline (7) between storage tanks (1, 2) and intermediate reservoir (9).
Claim 5
Independent Claim
53 words
A device as claimed in claims 2 or 3, characterised in that the pressure gauge (14) and the temperature sensor (15) are electrically connected to a control device (20), which is connected to the coating device (12, 13) and which controls the duration of coating or the mass flow of the coating gases.
Claim 6
Independent Claim
32 words
A device as claimed in one of claims 1 to 5 characterised in that at least two storage tanks (1, 2) for a coating material are connected to the intermediate reservoir (9).
Claim 7
Independent Claim
47 words
A device as claimed in claims 1 to 6, characterised in that each storage tank (1, 2) is connected by way of a valve (5, 6) to a main line (7) leading to the intermediate reservoir (9), in which line the mass flow regulator (8) is arranged.
Claim 8
Independent Claim
48 words
A device as claimed in one of claims 1 to 7, characterised in that each storage tank (1, 2) has level sensors (22, 23) for the liquid level and temperature sensors (24, 25), which are connected to a control device (26), which controls a temperature control device (18).
Claim 9
Independent Claim
26 words
A device as claimed in one of claims 1 to 8, characterised in that the intermediate reservoir (9) is connected to a gas recovery station (30).
Claim 10
Dependent Claim
49 words
A device as claimed in claim 9, characterised in that a valve (29), which is electrically connected by way of a control device (27) to the pressure gauge (14) of the intermediate reservoir (9), is arranged in the pipeline (31) between gas recovery station (30) and intermediate reservoir (9).
Claim 11
Independent Claim
43 words
A device as claimed in one of claims 1 to 8, characterised in that the pipeline (3, 4, 7) arranged between storage tanks (1, 2) and intermediate reservoir (9) is connected by way of a valve (33) to a gas recovery station (30).
References Cited (Backward Citations)
No citation records indexed.
USPTO Annuity & Maintenance Windows
Maintenance schedule is calculated for granted US utility patents.