A manufacturing planning system, comprising: data input/output means (12) having a data input/output display function and an arithmetic function; lead time estimating means (1) for estimating a lead time on the basis of a production capacity and a work demand; MRP executing means (2) for performing calculation of amounts of materials as required; work demand calculating means (3) for calculating said work demand in response to a command issued by said MRP executing means (2); problem analyzing means (7) for analyzing a problem on the basis of output of said MRP executing means (2) in response to a command issued by said data input/output means (12); capacity adjusting means (4) for commanding outputting of the result of calculation from said MRP executing means (2) in response to a command issued by said data input/output means (12); and data storage means (11); wherein the result of adjustment of a production schedule made by calculating the lead time in consideration of said work demand and said capacity is outputted.
Claim 2
Dependent Claim
153 words
A manufacturing planning system according to claim 1, further comprising: MPS generating means (9) for generating a master production schedule on the basis of product specifications, appointed date of delivery and production process states; initial plan data generating means (8) for issuing sequentially a command for generation of said master production schedule, a command for estimation of a work demand, a command for estimation of a lead time and a command for execution of calculation to said MRP executing means; and work demand estimating means (3) for estimating the amount of work in response to a command issued by said initial plan data generating means (8); wherein a production schedule is created on the basis of said product specifications, said appointed date of delivery and said production process states and wherein result of production schedule adjustment made by calculating the lead time in consideration of said work demand and said capacity is outputted.
Claim 3
Dependent Claim
52 words
A manufacturing planning system according to claim 2, further comprising: product completion date adjusting means (5) responsive to a command of said data input/output means (12) for adjusting the product completion date at which the product is scheduled to be completed, and outputting the result of adjustment of said product completion date.
Claim 4
Dependent Claim
43 words
A manufacturing planning system according to claim 3, further comprising: alternative shop designating means (6) for designating an alternative shop in response to a command of said data input/output means (12) to output said designated alternative shop to said MRP execution means (2).
Claim 5
Dependent Claim
46 words
A manufacturing planning system according to claim 1, further comprising: display means for displaying a shop to which a part providing a cause for delay is related and pointing out a problem by displaying simultaneously load and capacity states of said shop on a time-interval basis.
Claim 6
Dependent Claim
46 words
A manufacturing planning system according to claim 2, further comprising: display means for displaying a shop to which a part providing a cause for delay is related and pointing out a problem by displaying simultaneously load and capacity states of said shop on a time-interval basis.
Claim 7
Dependent Claim
46 words
A manufacturing planning system according to claim 3, further comprising: display means for displaying a shop to which a part providing a cause for delay is related and pointing out a problems by displaying simultaneously loads and capacity states of said shop on a time-interval basis.
Claim 8
Dependent Claim
46 words
A manufacturing planning system according to claim 4, further comprising: display means for displaying a shop to which a part providing a cause for delay is related and pointing out a problem by displaying simultaneously loads and capacity states of said shop on a time-interval basis.
Claim 9
Dependent Claim
45 words
A manufacturing planning system according to claim 1, further comprising: display means for displaying on an on-line basis alteration of production capacity resulting from the adjustment performed by said capacity adjusting means (4) together with alteration of production process accompanying said alteration of the capacity.
Claim 10
Dependent Claim
50 words
A manufacturing planning system according to claim 3, further comprising: display means for displaying on an on-line basis alteration of said product completion date resulting from the adjustment by said product completion date adjusting means (5) together with alteration of production process accompanying said alteration of the product completion date.
Claim 11
Dependent Claim
45 words
A manufacturing planning system according to claim 4, further comprising: display means for displaying on an on-line basis alteration of the shop states resulting from the adjustment by said alternative shop designating means (6) together with alteration of the production process accompanying said shop alteration.