Patent EP0112287B1 successfully refreshed from Google Patents.
← Back to Patent Explorer
EP0112287B1 Expired / Lapsed EP ⏱️ 0.0 years remaining

Drainage channel

Assignee: Poly Bauelemente AG
•
Filing: 1983-11-22
•
Granted: 1985-08-07
•
Expires: 2003-11-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

No abstract record available.

Inventors

  • 👤 Roland Thomann
  • 👤 Markus Amann
  • 👤 Heinz-Dieter Brink
  • 👤 Heinz Witschi

Bibliographic Details

Application Number —
Jurisdiction EP
Data Source google_patents
Last Synchronized 2026-11-08 03:49
CPC Classifications
E; E01; E01C; E01C11/00; E01C11/22; E01C11/224; E01C11/227; Y; Y10; Y10T; Y10T137/00; Y10T137/6851; Y10T137/6966; Y10T137/6991; Y10T137/6995; Y10T137/7021

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 90 words
Drainage gully with a rather long U-shaped body (1), of which the side walls (11) are formed with a step to receive a grating (3) set into the gully body, such that the side walls (11) of the gully body (1) have recesses to receive a bar (45) which holds the grating (3) fixed and which bar can itself be fixed by turning and tensioning with a threaded element (42), characterized in that to receive the locking ends of the bar (45) holding boxes (44) are cast into the recesses.
Claim 2
Dependent Claim 90 words
Drainage gully with a rather long U-shaped body (1), of which the side walls (11) are formed with a step to receive a grating (3) set into the gully body, such that the side walls (11) of the gully body (1) have recesses to receive a bar (45) which holds the grating (3) fixed and which bar can itself be fixed by turning and tensioning with a threaded element (42), characterized in that to receive the locking ends of the bar (45) holding boxes (44) are cast into the recesses.
Claim 3
Dependent Claim 18 words
Drainage gully in accordance with Claim 1, characterized in that the gully body is made of polyester concrete.
Claim 4
Dependent Claim 33 words
Drainage gully in accordance with Claim 1 or 2, characterized in that the boxes (44) to hold the bar are formed so as to have at least approximately an H-form in horizontal section.
Claim 5
Dependent Claim 28 words
Drainage gully in accordance with Claim 3, characterized in that the boxes (44) to hold the bar are formed in two parts with a vertical separating wall (75).
Claim 6
Dependent Claim 54 words
Drainage gully in accordance with Claim 4, characterized in that the inner part of the boxes (44) to hold the bar are formed with a striking side-wall (80) perpendicular to the separating wall (75), and that the side wall (79) lying opposite to this striking side-wall makes an obtuse angle with the separating wall.
Claim 7
Dependent Claim 34 words
Drainage gully in accordance with one of the Claims 1 to 5 characterized in that means (73, 74) are present to anchor in the side walls (11) the boxes (44) which hold the bar.

References Cited (Backward Citations)

No citation records indexed.

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag