Abstract

Abstract The construction element is designed as a wall element (1, 1a). Formed in the wall element (1, 1a) are pressure-water passages (5), the discharge openings of which are located at the tip (7) to be advanced of the wall element (1). The tip (7) is located at the tapering base-side section (2) of the wall element (1, 1a). In a manner known per se, the wall element (1, 1a) is provided with a reinforcement (26) which can be attached to a support (25) extending over the length of the wall element (1, 1a). To install the wall element (1, 1a), pressure water is fed to the pressure-water passages (5) via a pressure-water delivery device so that the earth is flushed up in the area of the tip (7), and the wall element (1, 1a) penetrates into the earth on account of its dead weight. <IMAGE>

Inventors

  • 👤 Günther 2000 Hamburg Spranger

Bibliographic Details

Application Number —
Jurisdiction DE
Data Source google_patents
Last Synchronized 2026-11-01 08:49
CPC Classifications
E; E02; E02D; E02D5/00; E02D5/20; E02D17/00; E02D17/20; E02D17/207; E02D7/00; E02D7/24; E02D7/26

Claims Analysis

Total Claims: 0
No claims parsed yet. Click Sync Now above to re-index claims from Google Patents.

References Cited (Backward Citations)

DE446471C Cited
US1024822A Cited
DE2057548A1 Cited
DE2913433A1 Cited

USPTO Annuity & Maintenance Windows

Maintenance schedule is calculated for granted US utility patents.

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag