← Back to Patent Explorer
US6867249B2 Expired / Lapsed US ⏱️ 0.0 years remaining

Lightweight and porous construction materials containing rubber

Assignee: Individual
•
Filing: 2002-12-12
•
Granted: 2005-03-15
•
Expires: 2022-12-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The present invention relates to a process for manufacturing a construction material by mixing a cementitious material, rubber bits and water. It also extends to a construction material comprising cured cementitious material and rubber bits in which the rubber bits are bonded together in a porous and permeable matrix by the cementitious material. An elastic binding material improves the physical properties of the construction material. The construction material can be cast in place or formed into blocks for transport to a construction site.

Inventors

  • 👤 Kin Man Amazon Lee

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-24 17:54
CPC Classifications
E; E01; E01C; E01C3/00; E01C3/003; C; C04; C04B; C04B18/00; C04B18/04; C04B18/18; C04B18/20; C04B18/22; C04B28/00; C04B28/02; E01C5/00; E01C5/06; E01C5/065; E01C7/00; E01C7/08; E01C7/10; E01C7/14; E01C7/142; E02; E02D; E02D17/00; E02D17/18; E02D17/20; C04B2111/00; C04B2111/40; E02D2300/00; E02D2300/0001; E02D2300/0004; E02D2300/0018; E02D2300/0051; E02D2300/0054; E02D2300/006; E02D2300/0062; E02D29/00; E02D29/02; Y; Y02; Y02W; Y02W30/00; Y02W30/50; Y02W30/91

Claims Analysis

Total Claims: 26
Claim 1
Independent Claim 97 words
A method of manufacturing a construction material, said method comprising: mixing a cementitious material, uniformly graded rubber bits having a coefficient of uniformity C u of less than 6 or gap graded rubber bits having an aggregate distribution coefficient of curvature C c outside the range of 1.5 to 2.5 and water to form a slurry in which the rubber bits are coated with cementitious material; curing said slurry to form a porous matrix material with interconnected pore spaces that allow free drainage through the material, wherein the rubber bits are bonded together by the cementitious material.
Claim 2
Independent Claim 97 words
A method of manufacturing a construction material, said method comprising: mixing a cementitious material, uniformly graded rubber bits having a coefficient of uniformity C u of less than 6 or gap graded rubber bits having an aggregate distribution coefficient of curvature C c outside the range of 1.5 to 2.5 and water to form a slurry in which the rubber bits are coated with cementitious material; curing said slurry to form a porous matrix material with interconnected pore spaces that allow free drainage through the material, wherein the rubber bits are bonded together by the cementitious material.
Claim 3
Dependent Claim 11 words
The method of claim 1 , wherein said bits are granules.
Claim 4
Dependent Claim 34 words
The method of claim 1 , wherein said step of mixing comprises: combining one part of the cementitious material with from 0.7 to 2.5 parts, inclusive, of rubber bits, said proportions determined by weight.
Claim 5
Dependent Claim 33 words
The method of claim 1 , wherein the step of mixing comprises: combining one part of the cementitious material with from 0.3 to 0.8 parts, inclusive, of water, said proportions determined by weight.
Claim 6
Dependent Claim 25 words
The method of claim 1 , wherein the step of mixing comprises: adding a binding compound for improving the strain compatibility of the construction material.
Claim 7
Dependent Claim 13 words
The method of claim 5 , wherein the binding compound comprises rubber powder.
Claim 8
Dependent Claim 14 words
The method of claim 5 , wherein the binding compound comprises a polymer fiber.
Claim 9
Dependent Claim 15 words
The method of claim 5 , wherein the binding compound comprises an aqueous rubber latex.
Claim 10
Dependent Claim 14 words
The method of claim 5 , wherein the binding compound comprises an aqueous polyurethane.
Claim 11
Dependent Claim 24 words
The method of claim 5 , wherein the binding compound comprises a rubber solution prepared by dissolving vulcanized rubber in a chlorine-substituted hydrocarbon solvent.
Claim 12
Dependent Claim 34 words
The method of claim 5 , wherein the step of mixing comprises: combining one part of the cementitious material with from 0 to 2 parts of the binding compound, said proportions determined by volume.
Claim 13
Dependent Claim 30 words
The method of claim 1 , wherein the rubber bits are derived from sources selected from the group consisting of: scrap rubber, vulcanized rubber, synthetic rubber, and fresh natural rubber.
Claim 14
Dependent Claim 30 words
The method of claim 1 wherein the cementitious material comprises a material selected from the group consisting of: Portland cement, hydraulic cement, slag cement, fly ash and pulverized fly ash.
Claim 15
Dependent Claim 63 words
The method of claim 1 , wherein up to 90% of the rubber bits by weight are replaced with uniformly graded aggregates of sand and/or gravel having a coefficient of uniformity C u of less than 6 or gap graded aggregates of sand and/or gravel having an aggregate distribution with a coefficient of curvature C c outside the range of 1.5 to 2.5.
Claim 16
Dependent Claim 88 words
The method of claim 1 , wherein up to 90% of the rubber bits by weight are replaced with lightweight aggregate fillers selected from the group consisting of: sawdust, polystyrene pellets, cellulose fiber, expanded and dehydrated clay pellets, dehydrated and cemented bio-solid pellets, furnace bottom ash and furnace bottom ash pellets, the lightweight aggregate being either uniformly graded with a coefficient of uniformity C u of less than 6 or gap graded with an aggregate distribution coefficient of curvature C c outside the range of 1.5 to 2.5.
Claim 17
Dependent Claim 32 words
The method of claim 1 , further comprising the step of: casting said slurry in place on a construction site; and said curing step comprises allowing said slurry to cure in place.
Claim 18
Dependent Claim 18 words
The method of claim 1 , further comprising the step of: casting said slurry in block forming molds.
Claim 19
Dependent Claim 39 words
The method of claim 16 , wherein said step of casting comprises: controlling the density and porosity of the slurry by vibration during placement of the slurry to a void ratio e in the range of 0.05 to 2.0.
Claim 20
Dependent Claim 37 words
The method of claim 17 , wherein said step of casting comprises: controlling the density and porosity of the slurry by vibration and static compression to a void ratio e in the range of 0.05 to 2.0.
Claim 21
Dependent Claim 74 words
A construction material comprising: cured Portland cement based cementitious material and rubber bits, wherein the rubber bits are either uniformly graded with a coefficient of uniformity C u of less than 6 or gap graded with an aggregate distribution coefficient of curvature C c outside the range of 1.5 to 2.5 and the rubber bits are bonded together in a porous matrix having interconnected pore spaces by the cementitious material to allow free drainage.
Claim 22
Dependent Claim 74 words
A construction material comprising: cured Portland cement based cementitious material and rubber bits, wherein the rubber bits are either uniformly graded with a coefficient of uniformity C u of less than 6 or gap graded with an aggregate distribution coefficient of curvature C c outside the range of 1.5 to 2.5 and the rubber bits are bonded together in a porous matrix having interconnected pore spaces by the cementitious material to allow free drainage.
Claim 23
Dependent Claim 26 words
The construction material of claim 20 , wherein said construction material has a coefficient of permeability in the range of 10 1 to 10 −4 cm/sec.
Claim 24
Dependent Claim 43 words
The construction material of claim 20 , wherein said construction material further comprises a binding material selected from the group consisting of: rubber powder, aqueous latex, aqueous polyurethane, polymer fibers, and rubber solution prepared by dissolving vulcanized rubber in a chlorine-substituted hydrocarbon solvent.
Claim 25
Independent Claim 149 words
A method of manufacturing a construction material, said method comprising: mixing a cementitious material, uniformly graded rubber bits having a coefficient of uniformity C u of less than 6 or gap graded rubber bits having an aggregate distribution coefficient of curvature C c outside the range of 1.5 to 2.5 and water to form a slurry in which the rubber bits are coated with cementitious material; determining a slope of a compression curve C rs of the slurry; employing the slope of the compression curve C rs to calculate an energy ΔE to be applied to the slurry to produce a construction material having a predetermined void ratio e; applying the calculated quantity of energy ΔE to the slurry in the form of vibration and/or static compression; and allowing the slurry to cure; wherein the cured construction material has an interconnected pore structure allowing free drainage through the material.
Claim 26
Independent Claim 149 words
A method of manufacturing a construction material, said method comprising: mixing a cementitious material, uniformly graded rubber bits having a coefficient of uniformity C u of less than 6 or gap graded rubber bits having an aggregate distribution coefficient of curvature C c outside the range of 1.5 to 2.5 and water to form a slurry in which the rubber bits are coated with cementitious material; determining a slope of a compression curve C rs of the slurry; employing the slope of the compression curve C rs to calculate an energy ΔE to be applied to the slurry to produce a construction material having a predetermined void ratio e; applying the calculated quantity of energy ΔE to the slurry in the form of vibration and/or static compression; and allowing the slurry to cure; wherein the cured construction material has an interconnected pore structure allowing free drainage through the material.

References Cited (Backward Citations)

US5290356A Cited
US5456751A Cited
US6103783A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2008-03-14 2008-09-13 2009-03-15 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2012-03-14 2012-09-13 2013-03-15 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2016-03-14 2016-09-13 2017-03-15 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag