Optimizing control method and optimizing control system for power plant

Assignee: Mitsubishi Chemical Corp
•
Filing: 1999-08-31
•
Granted: 2004-01-20
•
Expires: 2019-08-31
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract In a power plant including a plurality of parallel-operated generating elements supplying electricity and steam, boilers and turbines are controlled in an optimum condition depending on the successive changes of the demand for steam and electricity by: estimating parameters of characteristics and state of the generating elements, which cannot be directly measured, among parameters of the generating elements needed for calculation of the optimum load distribution for each of the generating elements, based on a physical model of each of the generating elements and an input process state quantity; and controlling each of the generating elements by determining an optimum load distribution for the each of the generating elements while using the estimated parameters of the each of the generating elements, to minimize a total cost of the power plant depending on the successive changes of the demand for steam and electricity.

Inventors

  • 👤 Kaoru Fujita
  • 👤 Genichi Emoto
  • 👤 Seiji Nakagawa
  • 👤 Toshihiko Takeshita

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 22:27
CPC Classifications
G; G05; G05B; G05B13/00; G05B13/02; G05B13/04; G05B13/042; H; H02; H02J; H02J3/00; H02J3/38; H02J2103/00; H02J2103/30; Y; Y02; Y02E; Y02E40/00; Y02E40/70; Y02E60/00; Y04; Y04S; Y04S10/00; Y04S10/50; Y04S40/00; Y04S40/20

Claims Analysis

Total Claims: 13
Claim 1
Independent Claim 158 words
An optimizing control method, for use in a power plant including a plurality of parallel-operated generating elements supplying electricity and steam, to control the generating elements by using an optimum load distribution while satisfying a balance between demand and supply of the electricity and the steam, said method comprising the steps of: estimating parameters of characteristics and state of the generating elements, which cannot be directly measured, among parameters of the generating elements needed for calculation of the optimum load distribution for each of the generating elements, based on a physical model of each of the generating elements and an input process state quantity; and controlling each of the generating elements by determining an optimum load distribution for the each of the generating elements while using the estimated parameters of the each of the generating elements, to minimize a total cost of the power plant, wherein the physical model includes steam enthalpies of steam inlet and steam outlet.
Claim 2
Dependent Claim 158 words
An optimizing control method, for use in a power plant including a plurality of parallel-operated generating elements supplying electricity and steam, to control the generating elements by using an optimum load distribution while satisfying a balance between demand and supply of the electricity and the steam, said method comprising the steps of: estimating parameters of characteristics and state of the generating elements, which cannot be directly measured, among parameters of the generating elements needed for calculation of the optimum load distribution for each of the generating elements, based on a physical model of each of the generating elements and an input process state quantity; and controlling each of the generating elements by determining an optimum load distribution for the each of the generating elements while using the estimated parameters of the each of the generating elements, to minimize a total cost of the power plant, wherein the physical model includes steam enthalpies of steam inlet and steam outlet.
Claim 3
Dependent Claim 115 words
The optimizing control method for a power plant as defined in claim 1 , wherein schedule control data indicating the parameters of the each of the generating elements and factors of fluctuations of running cost of the power plant in specified period are input, a schedule calculation is executed for obtaining a schedule to operate the power plant while minimizing cost in the specified period based on the input schedule control data and a model for the power plant, and the optimum load distribution of the each of the generating elements is calculated depending on the parameters of the each of the generating elements and the input process state quantity based on the obtained schedule.
Claim 4
Dependent Claim 47 words
The optimizing control method for a power plant as defined in claim 1 , wherein said controlling step of each of the generating elements based on the optimum load distribution and the input process state quantity includes obtaining a control quantity based on a multi-variable model calculation.
Claim 5
Dependent Claim 29 words
The optimizing control method for a power plant as defined in claim 1 , wherein the parallel-operated generating elements include a plurality of boilers and a plurality of turbines.
Claim 6
Dependent Claim 44 words
The optimizing control method for a power plant as defined in claim 4 , wherein the physical model of the turbines is a physical model in consideration of pressure loss characteristics which depend on a steam flow rate through a turbine steam control valve.
Claim 7
Dependent Claim 179 words
An optimizing control system, for use in a power plant including a plurality of parallel-operated generating elements supplying electricity and steam, for controlling the generating elements by using an optimum load distribution while satisfying a balance between demand and supply of the electricity and the steam, said optimizing control system comprising: an optimizing system for estimating parameters of characteristics and state of the generating elements, which cannot be directly measured, among parameters of the generating elements needed for calculation of the optimum load distribution for each of the generating elements, based on a physical model of each of the generating elements and an input process state quantity, to determine an optimum load distribution of each of the generating elements which minimizes total cost of the power plant; and a multi-variable control system for obtaining and setting a control quantity of each of the generating elements based on a multi-variable model predictive control using the optimum load distribution determined by said optimizing system and input process quantity, wherein the physical model includes steam enthalpies of steam inlet and steam outlet.
Claim 8
Dependent Claim 179 words
An optimizing control system, for use in a power plant including a plurality of parallel-operated generating elements supplying electricity and steam, for controlling the generating elements by using an optimum load distribution while satisfying a balance between demand and supply of the electricity and the steam, said optimizing control system comprising: an optimizing system for estimating parameters of characteristics and state of the generating elements, which cannot be directly measured, among parameters of the generating elements needed for calculation of the optimum load distribution for each of the generating elements, based on a physical model of each of the generating elements and an input process state quantity, to determine an optimum load distribution of each of the generating elements which minimizes total cost of the power plant; and a multi-variable control system for obtaining and setting a control quantity of each of the generating elements based on a multi-variable model predictive control using the optimum load distribution determined by said optimizing system and input process quantity, wherein the physical model includes steam enthalpies of steam inlet and steam outlet.
Claim 9
Dependent Claim 124 words
The optimizing control system for a power plant as defined in claim 6 , wherein said optimizing system includes a scheduling system for inputting schedule control data indicating information of fluctuating factors of running cost of the power plant in a specified period, and executing a schedule calculation for obtaining a schedule to operate the power plant while minimizing the running cost in the specified period based on the input schedule control data and the model for the power plant, and an optimizing operation system for calculating the optimum load distribution of the each of the generating elements depending on the parameters of the each of the generating elements and the input process state quantity based on the schedule obtained by the schedule calculation.
Claim 10
Dependent Claim 29 words
The optimizing control system for a power plant as defined in claim 6 , wherein said parallel-operated generating elements include a plurality of boilers and a plurality of turbines.
Claim 11
Dependent Claim 40 words
The optimizing control system as defined in claim 8 , wherein the physical model of the turbines is a physical model in consideration of pressure loss characteristics which depend on a steam flow rate through a turbine steam control valve.
Claim 12
Dependent Claim 38 words
The optimizing control method for a power plant as defined in claim 1 , wherein the steam enthalpies comprise steam enthalpies at steam inlet and outlet of a steam control valve in the each of the generating elements.
Claim 13
Dependent Claim 38 words
The optimizing control system for a power plant as defined in claim 6 , wherein the steam enthalpies comprise steam enthalpies at steam inlet and outlet of a steam control valve in the each of the generating elements.

References Cited (Backward Citations)

JPS6087633A Cited
US4745758A Cited
US4888953A Cited
JPH01310111A Cited
US5347466A Cited
JPH0565807A Cited
US5517424A Cited
US5886895A Cited
US5873251A Cited
US6021402A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2007-01-19 2007-07-21 2008-01-20 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2011-01-19 2011-07-21 2012-01-20 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2015-01-19 2015-07-21 2016-01-20 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag