Abstract

Abstract An Advanced Cheng Combined Cycle engine is a combination of the Cheng Cycle or the Advanced Cheng Cycle and a combined cycle, and serves to further enhance the power generation capability of either the Cheng Cycle, the Advanced Cheng Cycle, or the combined cycle alone. A gas turbine is provided, having a turbine generating power, a compressor receiving power from the turbine, and a combustion chamber to which is input compressed air from the compressor along with fuel and combustion products for producing energy to drive the turbine, the gas turbine producing a hot stream gas. A heat recovery steam generator receives hot stream gas produced by the gas turbine and generates high-pressure steam therefrom. A steam turbine receives and is driven by high-pressure steam generated by the heat recovery steam generator. The steam turbine bleeds intermediate-pressure steam for cooling the turbine and for injection back into the combustion chamber of the gas turbine. A control valve throttles down high-pressure steam generated by the heat recovery steam generator to a low-pressure steam for injection back into the combustion chamber of the gas turbine.

Inventors

  • 👤 Dah Yu Cheng

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-03 07:23
CPC Classifications
F; F02; F02C; F02C6/00; F02C6/18; F01; F01K; F01K21/00; F01K21/04; F01K21/042; F02C3/00; F02C3/20; F02C3/30; Y; Y02; Y02E; Y02E20/00; Y02E20/14; Y02E20/16

Claims Analysis

Total Claims: 2
Claim 1
Independent Claim 190 words
An Advanced Cheng Combined Cycle system, comprising: a gas turbine, having a turbine generating power, a compressor receiving power from the turbine, and a combustion chamber to which is input compressed air from the compressor along with fuel for producing energy to drive the turbine, the gas turbine producing a hot stream gas; a heat recovery steam generator receiving hot stream gas produced by the gas turbine and generating high-pressure steam therefrom; a steam turbine receiving and being driven by high-pressure steam generated by the heat recovery steam generator; a first conduit coupling the steam turbine and the gas turbine, said steam turbine bleeding steam through said first conduit for cooling the gas turbine; a second conduit coupling the heat recovery steam generator and the combustion chamber and gas turbine to supply steam cooling to the combustion chamber and the gas turbine; and a third conduit coupling the heat recovery steam generator and the combustion chamber and a control valve in said third conduit, throttling down high-pressure steam generated by the heat recovery steam generator to a low-pressure steam for injection back into the combustion chamber of the gas turbine.
Claim 2
Dependent Claim 190 words
An Advanced Cheng Combined Cycle system, comprising: a gas turbine, having a turbine generating power, a compressor receiving power from the turbine, and a combustion chamber to which is input compressed air from the compressor along with fuel for producing energy to drive the turbine, the gas turbine producing a hot stream gas; a heat recovery steam generator receiving hot stream gas produced by the gas turbine and generating high-pressure steam therefrom; a steam turbine receiving and being driven by high-pressure steam generated by the heat recovery steam generator; a first conduit coupling the steam turbine and the gas turbine, said steam turbine bleeding steam through said first conduit for cooling the gas turbine; a second conduit coupling the heat recovery steam generator and the combustion chamber and gas turbine to supply steam cooling to the combustion chamber and the gas turbine; and a third conduit coupling the heat recovery steam generator and the combustion chamber and a control valve in said third conduit, throttling down high-pressure steam generated by the heat recovery steam generator to a low-pressure steam for injection back into the combustion chamber of the gas turbine.

References Cited (Backward Citations)

US4069424A Cited
US4519207A Cited
US4907406A Cited
US5370772A Cited
US5613356A Cited
US6256978B1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2006-11-10 2007-05-12 2007-11-11 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2010-11-10 2011-05-12 2011-11-11 $3760.00 Window Closed / Lapsed