Method for server farm configuration optimization

Assignee: Unisys Corp
•
Filing: 1999-12-29
•
Granted: 2003-05-27
•
Expires: 2019-12-29
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method and an estimator program for estimating the optimum Server Farm size and the availability of the Server Farm for a given Redundancy Factor and a given particular number of clients.

Inventors

  • 👤 Lev Smorodinsky

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-29 23:23
CPC Classifications
G; G06; G06F; G06F11/00; G06F11/008; H; H04; H04L; H04L9/00; H04L9/40; H04L67/00; H04L67/01; H04L67/10; H04L67/1001; H04L67/10015

Claims Analysis

Total Claims: 19
Claim 1
Independent Claim 183 words
An estimator program that performs method steps for estimating the optimum operating Server Farm designed to serve a particular number of clients “n” comprising the steps of: (a) inputting a group of parameters involving at least one parameter involving at least one parameter for Single Server Farm cost evaluation and at least one parameter for downtime cost evaluation; wherein said step (a) of inputting said group of parameters includes the steps of: (a1) selecting for input said particular number of clients “n” for utilizing said Server Farm; (a2) selecting for input one parameter for said single Server Farm cost evaluation; (a3) selecting for input one parameter for said downtime cost evaluation; (b) selecting at least one Server Farm optimization parameter and its domain which indicates the values that the Server Farm optimization parameter may assume; (c) selecting a Server Farm optimization criterion that is a function of at least three arguments: (i) said Single Server Farm cost evaluation; (ii) said downtime cost evaluation; (iii) said Server Farm optimization parameter; (d) using an optimization technique to find the optimum value of the optimization parameter.
Claim 2
Dependent Claim 183 words
An estimator program that performs method steps for estimating the optimum operating Server Farm designed to serve a particular number of clients “n” comprising the steps of: (a) inputting a group of parameters involving at least one parameter involving at least one parameter for Single Server Farm cost evaluation and at least one parameter for downtime cost evaluation; wherein said step (a) of inputting said group of parameters includes the steps of: (a1) selecting for input said particular number of clients “n” for utilizing said Server Farm; (a2) selecting for input one parameter for said single Server Farm cost evaluation; (a3) selecting for input one parameter for said downtime cost evaluation; (b) selecting at least one Server Farm optimization parameter and its domain which indicates the values that the Server Farm optimization parameter may assume; (c) selecting a Server Farm optimization criterion that is a function of at least three arguments: (i) said Single Server Farm cost evaluation; (ii) said downtime cost evaluation; (iii) said Server Farm optimization parameter; (d) using an optimization technique to find the optimum value of the optimization parameter.
Claim 3
Dependent Claim 15 words
The method of claim 1 wherein step (a2) involves the Single Server Farm (SSF) cost.
Claim 4
Dependent Claim 16 words
The method of claim 1 wherein step (a3) involves the client-license cost per client per server.
Claim 5
Dependent Claim 16 words
The method of claim 1 wherein step (a3) involves the downtime cost per client, per hour.
Claim 6
Dependent Claim 14 words
The method of claim 1 wherein step (a3) involves the downtime cost per server.
Claim 7
Dependent Claim 52 words
The method of claim 1 wherein step (a) further includes the steps of: (2a4) selecting for input a maximum single server workload of users; (2a5) selecting for input a Mean Time To Repair (MTTF) for a single server; (2a6) selecting for input a Mean Time To Failure (MTTF) for a single server.
Claim 8
Dependent Claim 31 words
The method of claim 1 wherein step (b) for selecting an optimization parameter includes: (b1) selecting a Redundancy Factor having a domain which is an interval between 0 and 100 percent.
Claim 9
Dependent Claim 28 words
The method of claim 1 wherein step (b) for selecting an optimization parameter includes: (b2) selecting a Server Farm size which is any natural integer number of servers.
Claim 10
Dependent Claim 39 words
The method of claim 1 wherein step (b) for selecting an optimization parameter includes: (b3) selecting a normal single server workload of users having a domain which is any number between one (1) and the maximum single server workload.
Claim 11
Dependent Claim 52 words
The method of claim 1 wherein step (c) for selecting said optimization criteria of three arguments includes: (c1) selecting an optimization function which is the sum of the entire Server Farm cost and the downtime losses calculated as based on said Single Server Farm (SSF) cost evaluation and said downtime cost evaluation.
Claim 12
Dependent Claim 50 words
The method of claim 1 wherein step (c) for selecting said optimization criteria includes: (c2) selecting an optimization function which is a linear or concave function (up everywhere on the function's domain or down everywhere on the function's domain) of said Server Farm cost evaluation and said downtime losses evaluation.
Claim 13
Dependent Claim 63 words
The method of claim 1 wherein step (d) for using said optimization procedure includes the steps of: (d1) selecting a value of said optimization parameter from said domain; (d2) calculating said Single Server Farm cost; (d3) calculating said downtime cost; (d4) calculating a value of said optimization criterion; (d5) making an evaluation decision about the end or the continuation of said optimization procedure.
Claim 14
Dependent Claim 13 words
The method of claim 12 wherein step (d2) involves the single server cost.
Claim 15
Dependent Claim 16 words
The method of claim 12 wherein step (d2) involves the client-license cost per client, per server.
Claim 16
Dependent Claim 16 words
The method of claim 12 wherein step (d3) involves the downtime cost per server, per hour.
Claim 17
Dependent Claim 16 words
The method of claim 12 wherein step (d3) involves the downtime cost per client, per hour.
Claim 18
Dependent Claim 27 words
The method of claim 12 wherein step (d5) involves the decision to stop the procedure if the optimum number of servers in the configured farm is determined.
Claim 19
Dependent Claim 46 words
The method of claim 12 wherein step (d5) includes the step of: (d5a) continuing the optimization procedure if the optimum number for Server Farm size is not yet determined, by repeating said steps (d2) through (d5) with another value of said optimization parameter from said domain.

References Cited (Backward Citations)

US6496948B1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2006-05-26 2006-11-25 2007-05-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2010-05-26 2010-11-25 2011-05-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2014-05-26 2014-11-25 2015-05-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag