US6438490B2
Expired / Lapsed
US
⏱️ 0.0 years remaining
Route searching device
Assignee: Faurecia Clarion Electronics Co Ltd
•
Filing: 1999-04-27
•
Granted: 2002-08-20
•
Expires: 2019-04-27
Abstract
Abstract A processor calculates an estimated travel time required to travel from a current point to a destination or a passing point on a route on the basis of a travel time represented by traffic-jam information for a traffic-jam place which is represented by the traffic-jam information received by a traffic information receiver, and on the basis of a traffic-jam time calculated on the basis of map data for the other places; accordingly, the travel time required can be calculated in consideration of traffic-jam conditions.
Inventors
- 👤 Kazutaka Ohta
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-26 15:46
CPC Classifications
G; G01; G01C; G01C21/00; G01C21/26; G01C21/34; G01C21/36; G01C21/3691; G01C21/3453; G01C21/3492; G01C21/3626; G01C21/38; G01C21/3863
Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
374 words
An apparatus for estimating a travel time needed to travel from a current position to a destination or a point on a recommendable route, comprising: storing means for storing map data representing a road map, said map data comprising link data pieces, each of which represents a link between nodes on a road on the road map and has a travel estimation time of the link; receiving means for receiving traffic jam information representing a traffic jam place and a travel estimation time of the traffic jam place by communication; travel time estimating means for estimating a travel time needed to travel from the current position to the destination or the point on the recommendable route; and display means for displaying the estimated travel time; wherein said travel time estimating means obtains link data pieces representing a route from the current position to the destination or the point on the recommendable route, obtains a traffic jam travel estimation time needed to pass through a section where traffic jam place is located on the route represented by said link data pieces thus obtained, obtains a non-traffic jam travel estimation time needed to pass through a section where traffic jam place is not located on the route represented by said link data pieces thus obtained, and calculates the sum of the traffic jam travel estimation time and the non-traffic jam travel estimation time as the travel time needed to travel from the current position to the destination or the point on the recommendable route, and wherein the non-traffic jam travel estimation time is obtained in such a manner that, as to each of the link data pieces thus obtained, a ratio of a length of a section where traffic jam place is located on a link represented by the link data piece to a length of the link is calculated, a first intermediate time obtained by multiplying a travel time of the link data piece by the ratio is calculated, a second intermediate time obtained by subtracting the first intermediate time from the travel time of the link data piece is calculated, and the sum of the second intermediate times of the link data pieces thus obtained is calculated as the non-traffic jam travel estimation time.
Claim 2
Independent Claim
374 words
An apparatus for estimating a travel time needed to travel from a current position to a destination or a point on a recommendable route, comprising: storing means for storing map data representing a road map, said map data comprising link data pieces, each of which represents a link between nodes on a road on the road map and has a travel estimation time of the link; receiving means for receiving traffic jam information representing a traffic jam place and a travel estimation time of the traffic jam place by communication; travel time estimating means for estimating a travel time needed to travel from the current position to the destination or the point on the recommendable route; and display means for displaying the estimated travel time; wherein said travel time estimating means obtains link data pieces representing a route from the current position to the destination or the point on the recommendable route, obtains a traffic jam travel estimation time needed to pass through a section where traffic jam place is located on the route represented by said link data pieces thus obtained, obtains a non-traffic jam travel estimation time needed to pass through a section where traffic jam place is not located on the route represented by said link data pieces thus obtained, and calculates the sum of the traffic jam travel estimation time and the non-traffic jam travel estimation time as the travel time needed to travel from the current position to the destination or the point on the recommendable route, and wherein the non-traffic jam travel estimation time is obtained in such a manner that, as to each of the link data pieces thus obtained, a ratio of a length of a section where traffic jam place is located on a link represented by the link data piece to a length of the link is calculated, a first intermediate time obtained by multiplying a travel time of the link data piece by the ratio is calculated, a second intermediate time obtained by subtracting the first intermediate time from the travel time of the link data piece is calculated, and the sum of the second intermediate times of the link data pieces thus obtained is calculated as the non-traffic jam travel estimation time.
Claim 3
Dependent Claim
78 words
The apparatus as claimed in claim 1 , wherein said travel time estimating means calculates a traffic jam rate of the traffic jam travel estimation time to the estimated travel time needed to travel from the current position to the destination or the point on the recommendable route, and said display means displays the traffic jam with the estimated travel time needed to travel from the current position to the destination or the point on the recommendable route.
Claim 4
Dependent Claim
58 words
The apparatus as claimed in claim 1 , wherein said link data piece has a road type, and the second intermediate time is obtained by subtracting the first intermediate time from the travel time of the link data piece and then multiplying the subtraction result by a weight according to a road type of the link data piece.
Claim 5
Independent Claim
333 words
A method for estimating a travel time needed to travel from a current position to a destination or a point on a recommendable route, comprising steps of: storing map data representing a road map, said map data comprising link data pieces, each of which represents a link between nodes on a road on the road map and has a travel estimation time of the link; receiving traffic jam information representing a traffic jam place and a travel estimation time of the traffic jam place by communication; obtaining link data pieces representing a route from the current position to the destination or the point on the recommendable route; obtaining a traffic jam travel estimation time needed to pass through a section where traffic jam place is located on the route represented by said link data pieces thus obtained; obtaining a non-traffic jam travel estimation time needed to pass through a section where traffic jam place is not located on the route represented by said link data pieces thus obtained; calculating the sum of the traffic jam travel estimation time and the non-traffic jam travel estimation time to obtain the travel time needed to travel from the current position to the destination or the point on the recommendable route; and displaying the calculated travel time; wherein the non-traffic jam travel estimation time is obtained in such a manner that, as to each of the link data pieces thus obtained, a ratio of a length of a section where traffic jam place is located on a link represented by the link data piece to a length of the link is calculated, a first intermediate time obtained by multiplying a travel time of the link data piece by the ratio is calculated, a second intermediate time obtained by subtracting the first time from the travel time of the link data piece is calculated, and the sum of the second intermediate times of the link data pieces thus obtained is calculated as the non-traffic jam travel estimation time.
Claim 6
Independent Claim
333 words
A method for estimating a travel time needed to travel from a current position to a destination or a point on a recommendable route, comprising steps of: storing map data representing a road map, said map data comprising link data pieces, each of which represents a link between nodes on a road on the road map and has a travel estimation time of the link; receiving traffic jam information representing a traffic jam place and a travel estimation time of the traffic jam place by communication; obtaining link data pieces representing a route from the current position to the destination or the point on the recommendable route; obtaining a traffic jam travel estimation time needed to pass through a section where traffic jam place is located on the route represented by said link data pieces thus obtained; obtaining a non-traffic jam travel estimation time needed to pass through a section where traffic jam place is not located on the route represented by said link data pieces thus obtained; calculating the sum of the traffic jam travel estimation time and the non-traffic jam travel estimation time to obtain the travel time needed to travel from the current position to the destination or the point on the recommendable route; and displaying the calculated travel time; wherein the non-traffic jam travel estimation time is obtained in such a manner that, as to each of the link data pieces thus obtained, a ratio of a length of a section where traffic jam place is located on a link represented by the link data piece to a length of the link is calculated, a first intermediate time obtained by multiplying a travel time of the link data piece by the ratio is calculated, a second intermediate time obtained by subtracting the first time from the travel time of the link data piece is calculated, and the sum of the second intermediate times of the link data pieces thus obtained is calculated as the non-traffic jam travel estimation time.
Claim 7
Independent Claim
330 words
A medium for storing a program which is read out and executed by a computer, wherein said program makes said computer execute steps of: storing map data representing a road map, said map data comprising link data pieces, each of which represents a link between nodes on a road on the road map and has a travel estimation time of the link; receiving traffic jam information representing a traffic jam place and a travel estimation time of the traffic jam place by communication; obtaining link data pieces representing a route from the current position to the destination or the point on the recommendable route; obtaining a traffic jam travel estimation time needed to pass through a section where traffic jam place is located on the route represented by said link data pieces thus obtained; obtaining a non-traffic jam travel estimation time needed to pass through a section where traffic jam place is not located on the route represented by said link data pieces thus obtained; calculating the sum of the traffic jam travel estimation time and the non-traffic jam travel estimation time to obtain the travel time needed to travel from the current position to the destination or the point on the recommendable route; and displaying the calculated travel time; wherein the non-traffic jam travel estimation time is obtained in such a manner that, as to each of the link data pieces thus obtained, a ratio of a length of a section where traffic jam place is located on a link represented by the link data piece to a length of the link is calculated, a first intermediate time obtained by multiplying a travel time of the link data piece by the ratio is calculated, a second intermediate time obtained by subtracting the first time from the travel time of the link data piece is calculated, and the sum of the second intermediate times of the link data pieces thus obtained is calculated as the non-traffic jam travel estimation time.
Claim 8
Independent Claim
330 words
A medium for storing a program which is read out and executed by a computer, wherein said program makes said computer execute steps of: storing map data representing a road map, said map data comprising link data pieces, each of which represents a link between nodes on a road on the road map and has a travel estimation time of the link; receiving traffic jam information representing a traffic jam place and a travel estimation time of the traffic jam place by communication; obtaining link data pieces representing a route from the current position to the destination or the point on the recommendable route; obtaining a traffic jam travel estimation time needed to pass through a section where traffic jam place is located on the route represented by said link data pieces thus obtained; obtaining a non-traffic jam travel estimation time needed to pass through a section where traffic jam place is not located on the route represented by said link data pieces thus obtained; calculating the sum of the traffic jam travel estimation time and the non-traffic jam travel estimation time to obtain the travel time needed to travel from the current position to the destination or the point on the recommendable route; and displaying the calculated travel time; wherein the non-traffic jam travel estimation time is obtained in such a manner that, as to each of the link data pieces thus obtained, a ratio of a length of a section where traffic jam place is located on a link represented by the link data piece to a length of the link is calculated, a first intermediate time obtained by multiplying a travel time of the link data piece by the ratio is calculated, a second intermediate time obtained by subtracting the first time from the travel time of the link data piece is calculated, and the sum of the second intermediate times of the link data pieces thus obtained is calculated as the non-traffic jam travel estimation time.
References Cited (Backward Citations)
US5406490A
Cited
US5371678A
Cited
US5845227A
Cited
US5272638A
Cited
US5369588A
Cited
US5428545A
Cited
EP0622611A1
Cited
US5568390B1
Cited
US5568390A
Cited
EP0660289A1
Cited
US5919246A
Cited
JPH08220246A
Cited
US5911773A
Cited
US5694122A
Cited
US5774827A
Cited
US5892463A
Cited
US5862509A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 2005-08-19 | 2006-02-18 | 2006-08-20 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2009-08-19 | 2010-02-18 | 2010-08-20 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2013-08-19 | 2014-02-18 | 2014-08-20 | $7700.00 | Window Closed / Lapsed |