Turbogenerator power control system and method

Assignee: Capstone Green Energy Corp
•
Filing: 1999-07-23
•
Granted: 2001-08-28
•
Expires: 2019-07-23
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The power meter, required in most utility grid connectged applications to measure load consumption, is utilized to provide a feedback to an associated turbogenerator power controller, providing a control system for peak shaving, load following, reactive power control, reverse flow protection and load analysis for scheduled turbogenerator operation. This control system operates with simple discrete signals for peak shaving operation, to more complex pulse signals for load following, to load profile analysis and scheduled operation based on a microprocessor based serial input from a digital power meter.

Inventors

  • 👤 Edward C. Edelman
  • 👤 Mark G. Gilbreth
  • 👤 Joel B. Wacknov

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 08:37
CPC Classifications
H; H02; H02J; H02J3/00; H02J3/28; H02J3/001; H02J3/0014; H02J3/18; H02J3/1885; Y; Y02; Y02E; Y02E20/00; Y02E20/14; Y02E40/00; Y02E40/30

Claims Analysis

Total Claims: 4
Claim 1
Independent Claim 87 words
A power control system connected to an electric utility grid and a load, said system comprising: a power meter connected to said electric utility grid; at least one turbogenerator connected to said electric utility grid, said power meter, and said load, each of said at least one turbogenerator including a controller for said power meter to provide a plurality of analog pulse input signals including a real power feedback signal and a reactive power feedback signal to the controller of each of said at least one turbogenerator.
Claim 2
Dependent Claim 87 words
A power control system connected to an electric utility grid and a load, said system comprising: a power meter connected to said electric utility grid; at least one turbogenerator connected to said electric utility grid, said power meter, and said load, each of said at least one turbogenerator including a controller for said power meter to provide a plurality of analog pulse input signals including a real power feedback signal and a reactive power feedback signal to the controller of each of said at least one turbogenerator.
Claim 3
Dependent Claim 45 words
The power control system of claim 1 , further comprising: a first comparator to compare said real power feedback signal with a utility load real demand signal; and a second comparator to compare said reactive power feedback signal with a utility load reactive demand signal.
Claim 4
Dependent Claim 45 words
The power control system of claim 2 , further comprising: means operably associated with said first comparator to time average said compared signal from said first comparator; and means operably associated with said second comparator to time average said compared signal from said second comparator.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2004-08-27 2005-02-26 2005-08-28 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2008-08-27 2009-02-26 2009-08-28 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2012-08-27 2013-02-26 2013-08-28 $7700.00 Window Closed / Lapsed