Claims Analysis
Total Claims: 18
Claim 1
Independent Claim
91 words
A method comprising producing an aggregate plan for a set of job requests to be processed in a manufacturing environment given capacities for resources of the manufacturing environment, the capacities being represented by bins in multiple dimensions, some of which may be used by the jobs on an alternative basis, by selecting a subset of the job requests according to a procedure for packing the bins in which a selection is made from among ordered lists of the job requests grouped according to costs for one or more of the resources.
Claim 2
Independent Claim
91 words
A method comprising producing an aggregate plan for a set of job requests to be processed in a manufacturing environment given capacities for resources of the manufacturing environment, the capacities being represented by bins in multiple dimensions, some of which may be used by the jobs on an alternative basis, by selecting a subset of the job requests according to a procedure for packing the bins in which a selection is made from among ordered lists of the job requests grouped according to costs for one or more of the resources.
Claim 3
Dependent Claim
18 words
The method of claim 1 wherein the ordered lists of job requests are ordered in terms of value.
Claim 4
Dependent Claim
24 words
The method of claim 2 wherein at least some of the job requests have different values versus cost for different ones of the resources.
Claim 5
Dependent Claim
14 words
The method of claim 3 wherein the manufacturing environment comprises a print shop environment.
Claim 6
Dependent Claim
14 words
The method of claim 3 wherein each alternative is represented as a separate bin.
Claim 7
Dependent Claim
31 words
The method of claim 3 further comprising developing a detailed schedule from the aggregate plan, the detailed schedule differing from the aggregate plan by including a timeline for the selected jobs.
Claim 8
Dependent Claim
42 words
The method of claim 1 wherein the manufacturing environment is represented by a declarative model including a first number of state nodes and a second number of task nodes interconnected with the state nodes, the bins being associated with the task nodes.
Claim 9
Dependent Claim
23 words
The method of claim 1 wherein the manufacturing environment is represented by a model that includes the resources consumed by the job requests.
Claim 10
Independent Claim
122 words
A method of producing an aggregate plan for a number of job requests, comprising selecting from among a plurality of routes that define a manufacturing environment, one or more routes by which one or more products corresponding to the job requests are to be produced within the manufacturing environment, each of the plurality of routes including inventory items and resources that act on the inventory items, wherein the selecting procedure is accomplished using a bin packing process in which bins represent the resources that act on the inventory items and the bin packing process is optimized by grouping two or more of the job requests into one or more ordered lists of jobs having similar costs before the selecting procedure is initiated.
Claim 11
Independent Claim
122 words
A method of producing an aggregate plan for a number of job requests, comprising selecting from among a plurality of routes that define a manufacturing environment, one or more routes by which one or more products corresponding to the job requests are to be produced within the manufacturing environment, each of the plurality of routes including inventory items and resources that act on the inventory items, wherein the selecting procedure is accomplished using a bin packing process in which bins represent the resources that act on the inventory items and the bin packing process is optimized by grouping two or more of the job requests into one or more ordered lists of jobs having similar costs before the selecting procedure is initiated.
Claim 12
Dependent Claim
18 words
The method of claim 9 wherein the ordered lists of jobs are arranged in terms of job value.
Claim 13
Dependent Claim
36 words
The method of claim 10 wherein the bin packing process comprises selecting jobs from the one or more ordered lists of jobs until a cost threshold for a first resource of the manufacturing environment is reached.
Claim 14
Dependent Claim
60 words
The method of claim 11 wherein if, while selecting jobs from the one or more ordered lists of jobs, a cost threshold for a second resource is reached before the cost threshold of the first resource is reached, the second resource is designated as a bottleneck and the bin packing process is recommended so as to optimize for the bottleneck.
Claim 15
Dependent Claim
27 words
The method of claim 12 wherein multiple alternative ones of the routes are accounted for while selecting jobs from the one or more ordered lists of jobs.
Claim 16
Dependent Claim
27 words
The method of claim 11 wherein multiple alternative ones of the routes are accounted for while selecting jobs from the one or more ordered lists of jobs.
Claim 17
Dependent Claim
35 words
The method of claim 11 wherein selecting jobs from the one or more ordered lists of jobs is accomplished using a sweeping process wherein jobs from each of the ordered lists of jobs are selected.
Claim 18
Dependent Claim
29 words
The method of claim 15 wherein the jobs are clustered and/or split according to cost savings and/or extra costs to be incurred before being arranged into the ordered lists.