← Back to Patent Explorer
US6144901A Expired / Lapsed US ⏱️ 0.0 years remaining

Method of optimizing train operation and training

Assignee: New York Air Brake LLC
•
Filing: 1998-09-11
•
Granted: 2000-11-07
•
Expires: 2018-09-11
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method of optimizing train operation includes determining conditions of location, track profile and train forces of the train. Next, a set of preliminary train restraint operating parameters are determined from the determined conditions. Also, at least one of a set of preliminary train optimizable operating parameters to minimize train forces, to maximize fuel efficiency and to minimize time to destination is determined. The determined set of preliminary train operating parameters are weighted and combined. Optimized train operating parameters are determined from the weighted and combined preliminary train operating parameters. Engineering train and access is also performed.

Inventors

  • 👤 Stephen K. Nickles
  • 👤 Michael J. Hawthorne
  • 👤 John E. Haley
  • 👤 Bryan M. McLaughlin
  • 👤 Marshall G. Beck

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 07:33
CPC Classifications
B; B60; B60T; B60T17/00; B60T17/18; B60T17/22; B60T17/228; B60T13/00; B60T13/10; B60T13/66; B60T13/665; G; G05; G05B; G05B13/00; G05B13/02; G05B13/0205; G05B13/024

Claims Analysis

Total Claims: 39
Claim 1
Independent Claim 87 words
A method of optimizing train operation comprising: determining conditions of location, track profile and train forces; determining, from the determined conditions, a set of preliminary train restraint operating parameters to be within operational restraints and at least one of a set of preliminary train optimizable operating parameters to minimize train forces, to maximize fuel efficiency and to minimize time to destination; weighting and combining the determined set of preliminary train operating parameters; and determining optimized train operating parameters from the weighted and combined preliminary train operating parameters.
Claim 2
Independent Claim 87 words
A method of optimizing train operation comprising: determining conditions of location, track profile and train forces; determining, from the determined conditions, a set of preliminary train restraint operating parameters to be within operational restraints and at least one of a set of preliminary train optimizable operating parameters to minimize train forces, to maximize fuel efficiency and to minimize time to destination; weighting and combining the determined set of preliminary train operating parameters; and determining optimized train operating parameters from the weighted and combined preliminary train operating parameters.
Claim 3
Dependent Claim 19 words
The method according to claim 1, including determining from train location and track profile if optimization should be performed.
Claim 4
Dependent Claim 32 words
The method according to claim 2, wherein determining if optimization should be performed includes determining location of the train with respect to one or more of hill, valley, curve, signal and siding.
Claim 5
Dependent Claim 17 words
The method according to claim 1, wherein determining optimized operating parameters includes determining dynamic and fluid braking.
Claim 6
Dependent Claim 28 words
The method according to claim 4, wherein determining fluid braking includes determining fluid braking individually for each locomotive and car in the train which can be individually controlled.
Claim 7
Dependent Claim 22 words
The method according to claim 4, wherein determining dynamic and fluid braking includes determining dynamic and fluid braking individually for each locomotive.
Claim 8
Dependent Claim 36 words
The method according to claim 1, including determining dynamic and fluid braking as preliminary train optimizable operating parameters, weighting and combining each the dynamic and fluid braking with the determined sets of preliminary train operating parameters.
Claim 9
Dependent Claim 21 words
The method according to claim 7, wherein weighing the dynamic and fluid braking as a function of location and track profile.
Claim 10
Dependent Claim 28 words
The method according to claim 1, wherein the train operating parameters include one or more of train fluid braking, locomotive fluid braking, locomotive dynamic braking and locomotive propulsion.
Claim 11
Dependent Claim 12 words
The method according to claim 1, including displaying the optimized operating parameters.
Claim 12
Dependent Claim 16 words
The method according to claim 1, including controlling the train to the determined optimized operating parameters.
Claim 13
Dependent Claim 33 words
The method according to claim 1, wherein the train includes more than one locomotive and one of the train optimized operating parameters includes shutting down or restarting the propulsion system of individual locomotives.
Claim 14
Dependent Claim 41 words
The method according to claim 1, wherein determining the preliminary train restraint operating parameters in one or more of speed limits, slow orders, speed restriction zones, meets and passes, track occupancy permits, general operating bulletins, drawbar limits and slack action limits.
Claim 15
Dependent Claim 19 words
The method according to claim 1, wherein the preliminary train optimizable operating parameters are determined using the operational restraints.
Claim 16
Dependent Claim 35 words
The method according to claim 1, including determining train characteristics which includes, for each car, one or more of length, weight, position in the train, braking equipment description, types of bearings and wind drag areas.
Claim 17
Dependent Claim 40 words
The method according to claim 1, including train characteristics which includes, for each locomotive, one or more of length, weight, position in the train, traction performance, dynamic braking performance, fuel consumption as related to power control settings and locomotive speeds.
Claim 18
Dependent Claim 24 words
The method according to claim 1, wherein determining train forces includes determining forces experienced by and through out the train for ensuing track profile.
Claim 19
Dependent Claim 27 words
The method according to claim 1, wherein determining preliminary train restraint operating parameters includes determining preliminary train operating parameters to maintain coupler forces below a set limit.
Claim 20
Dependent Claim 20 words
The method according to claim 1, wherein determining forces includes determining coupler forces and slack action through out the train.
Claim 21
Dependent Claim 30 words
The method according to claim 19, wherein determining optimized train operating parameters if slack action has been determined includes determining train operating parameters which achieve zero acceleration within the train.
Claim 22
Dependent Claim 32 words
The method according to claim 1, wherein determining forces includes determining at least one of steady state draft and buff, transient draft and buff, slack action and lateral over vertical force ratio.
Claim 23
Dependent Claim 22 words
The method according to claim 1, wherein determining forces includes determining forces exerted by grade and rolling resistance over the ensuring track.
Claim 24
Dependent Claim 27 words
The method according to claim 22, including determining preliminary train optimizable operating parameters to maintain grade from the determined rolling resistance force and force exerted by grade.
Claim 25
Dependent Claim 30 words
The method according to claim 22, including determining preliminary train optimizable operating parameters to stop in a minimum distance from the determined rolling resistance force and force exerted by grade.
Claim 26
Dependent Claim 20 words
The method according to claim 1, including determining preliminary train optimizable operating parameters to a stop in a minimum distance.
Claim 27
Dependent Claim 16 words
The method according to claim 25, wherein the method is repeated until the train is stopped.
Claim 28
Dependent Claim 20 words
The method according to claim 1, including determining train restraint and optimizable operating parameters to adhere to posted speed restriction.
Claim 29
Independent Claim 45 words
A method of optimizing train operation comprising: determining conditions of location, train characteristics and track profile; determining, from the determined conditions, forces exerted by grade and rolling resistance through out the train for ensuing track profile; and determining optimized train operating parameters to maintain grade.
Claim 30
Independent Claim 45 words
A method of optimizing train operation comprising: determining conditions of location, train characteristics and track profile; determining, from the determined conditions, forces exerted by grade and rolling resistance through out the train for ensuing track profile; and determining optimized train operating parameters to maintain grade.
Claim 31
Independent Claim 49 words
A method of optimizing train operation comprising: determining conditions of location, train characteristics and track profile; determining, from the determined conditions, forces exerted by grade and rolling resistance through out the train for ensuing track profile; and determining optimized train operating parameters to a stop in a minimum distance.
Claim 32
Independent Claim 49 words
A method of optimizing train operation comprising: determining conditions of location, train characteristics and track profile; determining, from the determined conditions, forces exerted by grade and rolling resistance through out the train for ensuing track profile; and determining optimized train operating parameters to a stop in a minimum distance.
Claim 33
Dependent Claim 16 words
The method according to claim 29, wherein the method is repeated until the train is stopped.
Claim 34
Independent Claim 52 words
A method of optimizing train operation comprising: determining conditions of location, train characteristics and track profile; determining, from the determined conditions, coupler forces and slack action through out the train for ensuing track; and determining optimized train operating parameters to minimize slack action and to maintain coupler forces below a set limit.
Claim 35
Independent Claim 52 words
A method of optimizing train operation comprising: determining conditions of location, train characteristics and track profile; determining, from the determined conditions, coupler forces and slack action through out the train for ensuing track; and determining optimized train operating parameters to minimize slack action and to maintain coupler forces below a set limit.
Claim 36
Dependent Claim 27 words
The method according to claim 31, including determining at least one of steady state draft and buff, transient draft and buff and lateral over vertical force ratio.
Claim 37
Dependent Claim 30 words
The method according to claim 31, wherein determining optimized train operating parameters if slack action has been determined includes determining train operating parameters which achieve zero acceleration within the train.
Claim 38
Dependent Claim 27 words
The method according to claim 31, including determining if the slack action and coupler forces exceed predetermined limits and notifying an operator if either exceed the limits.
Claim 39
Dependent Claim 26 words
The method according to claim 34, including determining if the operator took appropriate action and if not controlling the train to the determined optimized operating parameters.

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2003-11-07 2004-05-08 2004-11-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2007-11-07 2008-05-08 2008-11-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2011-11-07 2012-05-08 2012-11-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag