← Back to Patent Explorer
US6081148A Expired / Lapsed US ⏱️ 0.0 years remaining

Apparatus for minimizing a clock skew occurring in a semiconductor device

Assignee: Abov Semiconductor Co Ltd
•
Filing: 1998-06-26
•
Granted: 2000-06-27
•
Expires: 2018-06-26
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A clock circuit is used in a semiconductor device having a control block and a macroblock in order to provide synchronous clocks. The clock circuit contains a clock source for generating the clocks; a clock tree, coupled between the clock source and the control block and the macroblock, for relaying the clocks to the control block and the macrobock; and programmable delays coupled between the clock source and the clock tree and between the clock tree and the control block and the macroblock in order to reduce overall clock skew.

Inventors

  • 👤 Yoon Seok Song

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-26 08:33
CPC Classifications
G; G06; G06F; G06F1/00; G06F1/04; G06F1/10; H; H03; H03K; H03K5/00; H03K5/13; H03K5/133; H03K5/15; H03K5/15013

Claims Analysis

Total Claims: 16
Claim 1
Independent Claim 96 words
A clock circuit, for use in a semiconductor device having a control block and a macroblock, for providing clocks to the control block and the macroblock, wherein the control block has a number of latches and the macroblock has a plurality of macros, comprising: a clock source for generating the clocks; a clock tree, coupled between the clock source and the control block and the macroblock, for relaying the clocks to the control block and the macrobock; and programmable delays coupled between the clock source and the clock tree in order to reduce overall clock skew.
Claim 2
Dependent Claim 96 words
A clock circuit, for use in a semiconductor device having a control block and a macroblock, for providing clocks to the control block and the macroblock, wherein the control block has a number of latches and the macroblock has a plurality of macros, comprising: a clock source for generating the clocks; a clock tree, coupled between the clock source and the control block and the macroblock, for relaying the clocks to the control block and the macrobock; and programmable delays coupled between the clock source and the clock tree in order to reduce overall clock skew.
Claim 3
Dependent Claim 39 words
The clock circuit as recited in claim 1, wherein the clock tree includes: a first clock tree coupled between the clock source and the control block; and a second clock tree coupled between the clock source and the macroblock.
Claim 4
Dependent Claim 101 words
The clock circuit as recited in claim 2, wherein the programmable delay includes: a first programmable delay, coupled between the clock source and the first clock tree, for correcting a clock skew occurring in the control block in view of the overall clock skew; a second programmable delay, coupled between the clock source and the second clock tree, for correcting a clock skew occurring in the macroblock in view of the overall clock skew; and a third programmable delay, coupled between the second clock tree and the macroblock, for correcting a delay occurring in the second clock tree and the macroblock.
Claim 5
Dependent Claim 29 words
The clock circuit as recited in claim 3, the third programmable delay includes a plurality of programmable delays, each coupled between the second clock tree and a corresponding macro.
Claim 6
Dependent Claim 31 words
The clock circuit as recited in claim 4, wherein each of the programmable delays includes a multiplicity of buffers coupled in a series fashion, wherein each buffer has a unit delay.
Claim 7
Dependent Claim 215 words
The clock circuit as recited in claim 5, wherein, when a greatest clock delay of the control block is greater than a greatest clock delay of the macroblock, a delay of the first programmable delay is "0" and a delay of the second programmable delay is N times of the unit delay, wherein N is an integer and is determined by satisfying the condition that a maximum delay of the clock circuit is greater than or identical to a delay obtained by adding N times of the unit delay to the greatest delay of the macroblock and is smaller than a delay obtained by adding (N+1) times of the unit delay to the greatest delay of the macroblock; and a delay of the third programmable delay is Ni times of the unit delay, wherein Ni is an integer and is determined by satisfying the condition that the maximum delay of the clock circuit is greater than or identical to a delay obtained by adding Ni times of the unit delay and a delay of the second programmable delay to an internal delay of the macro and is smaller than a delay obtained by adding (Ni+1) times of the unit delay and the delay of the second programmable delay to the internal delay of the macro.
Claim 8
Dependent Claim 227 words
The clock circuit as recited in claim 5, wherein, when a greatest clock delay of the control block is smaller than a greatest clock delay of the macroblock, a delay of the first programmable delay is N times of the unit delay, wherein N is an integer and is determined by satisfying the condition that the greatest clock delay of the macroblock is greater than a delay obtained by adding (N-1) times of the unit delay to the greatest delay of the control block and is smaller than or identical to a delay obtained by adding N times of the unit delay to the greatest delay of the control block; a maximum delay of the clock circuit is a delay obtained by adding N times of the unit delay to the greatest delay of the control block; a delay of the second programmable delay is "0"; and a delay of the third programmable delay is Ni times of the unit delay, wherein Ni is an integer and is determined by satisfying the condition that the maximum delay of the clock circuit is greater than or identical to a delay obtained by adding Ni times of the unit delay to an internal delay of the macro and is smaller than a delay obtained by adding (Ni+1) times of the unit delay to the internal delay of the macro.
Claim 9
Dependent Claim 92 words
a semiconductor device having a control block and a macroblock, wherein the control block has a number of latches and the macroblock has a plurality of macros, comprising: a clock source for generating the clocks; a clock tree, coupled between the clock source and the control block and the macroblock, for relaying the clocks to the control block and the macrobock; and programmable delays coupled between the clock source and the clock tree and between the clock tree and the control block and the macroblock in order to reduce overall clock skew.
Claim 10
Dependent Claim 92 words
a semiconductor device having a control block and a macroblock, wherein the control block has a number of latches and the macroblock has a plurality of macros, comprising: a clock source for generating the clocks; a clock tree, coupled between the clock source and the control block and the macroblock, for relaying the clocks to the control block and the macrobock; and programmable delays coupled between the clock source and the clock tree and between the clock tree and the control block and the macroblock in order to reduce overall clock skew.
Claim 11
Dependent Claim 39 words
The semiconductor device as recited in claim 8, wherein the clock tree includes: a first clock tree coupled between the clock source and the control block; and a second clock tree coupled between the clock source and the macroblock.
Claim 12
Dependent Claim 101 words
The semiconductor device as recited in claim 9, wherein the programmable delay includes: a first programmable delay, coupled between the clock source and the first clock tree, for correcting a clock skew occurring in the control block in view of the overall clock skew; a second programmable delay, coupled between the clock source and the second clock tree, for correcting a clock skew occurring in the macroblock in view of the overall clock skew; and a third programmable delay, coupled between the second clock tree and the macroblock, for correcting a delay occurring in the second clock tree and the macroblock.
Claim 13
Dependent Claim 29 words
The semiconductor device as recited in claim 10, the third programmable delay includes a plurality of programmable delays, each coupled between the second clock tree and a corresponding macro.
Claim 14
Dependent Claim 31 words
The semiconductor device as recited in claim 11, wherein each of the programmable delay includes a multiplicity of buffers coupled in a series fashion, wherein each buffer has a unit delay.
Claim 15
Dependent Claim 215 words
The semiconductor device as recited in claim 12, wherein, when a greatest clock delay of the control block is greater than a greatest clock delay of the microblock, a delay of the first programmable delay is "0" and a delay of the second programmable delay is N times of the unit delay, wherein N is an integer and is determined by satisfying the condition that a maximum delay of the clock circuit is greater than or identical to a delay obtained by adding N times of the unit delay to the greatest delay of the macroblock and is smaller than a delay obtained by adding (N+1) times of the unit delay to the greatest delay of the macroblock; and a delay of the third programmable delay is Ni times of the unit delay, wherein Ni is an integer and is determined by satisfying the condition that the maximum delay of the clock circuit is greater than or identical to a delay obtained by adding Ni times of the unit delay and a delay of the second programmable delay to an internal delay of the macro and is smaller than a delay obtained by adding (Ni+1) times of the unit delay and the delay of the second programmable delay to the internal delay of the macro.
Claim 16
Dependent Claim 227 words
The semiconductor device as recited in claim 12, wherein, when a greatest clock delay of the control block is smaller than a greatest clock delay of the macroblock, a delay of the first programmable delay is N times of the unit delay, wherein N is an integer and is determined by satisfying the condition that the greatest clock delay of the macroblock is greater than a delay obtained by adding (N-1) times of the unit delay to the greatest delay of the control block and is smaller than or identical to a delay obtained by adding N times of the unit delay to the greatest delay of the control block; a maximum delay of the clock circuit is a delay obtained by adding N times of the unit delay to the greatest delay of the control block; a delay of the second programmable delay is "0"; and a delay of the third programmable delay is Ni times of the unit delay, wherein Ni is an integer and is determined by satisfying the condition that the maximum delay of the clock circuit is greater than or identical to a delay obtained by adding Ni times of the unit delay to an internal delay of the macro and is smaller than a delay obtained by adding (Ni+1) times of the unit delay to the internal delay of the macro.

References Cited (Backward Citations)

JPS59105123A Cited
US5369640A Cited
US5686845A Cited
US5784600A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2003-06-27 2003-12-27 2004-06-27 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2007-06-27 2007-12-27 2008-06-27 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2011-06-27 2011-12-27 2012-06-27 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag