← Back to Patent Explorer
US6035261A Expired / Lapsed US ⏱️ 0.0 years remaining

Fault reporting in a redundant power converter

Assignee: International Business Machines Corp
•
Filing: 1998-10-28
•
Granted: 2000-03-07
•
Expires: 2018-10-28
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract Aspects for reporting faults in a redundant power converter are described. An exemplary method aspect includes monitoring at least one node within the redundant power converter. The method further includes tracking values of the at least one node during a predetermined time period, and predicting when a specification of the redundant power converter will be exceeded based on the tracked values.

Inventors

  • 👤 Brian A. Carpenter
  • 👤 Darryl C. Newell
  • 👤 Kevin M. Silk
  • 👤 Girish C. Johari

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-28 21:06
CPC Classifications
H; H02; H02J; H02J1/00; H02J1/10; H02J1/001

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 60 words
A method for reporting faults in a redundant power converter, the method comprising the steps of: (a) monitoring at least one node within the redundant power converter; (b) tracking values of the at least one node during a predetermined time period; and (c) predicting when a specification of the redundant power converter will be exceeded based on the tracked values.
Claim 2
Independent Claim 60 words
A method for reporting faults in a redundant power converter, the method comprising the steps of: (a) monitoring at least one node within the redundant power converter; (b) tracking values of the at least one node during a predetermined time period; and (c) predicting when a specification of the redundant power converter will be exceeded based on the tracked values.
Claim 3
Dependent Claim 20 words
The method of claim 1 further comprising performing the steps (a), (b), and (c) within a system management interface controller.
Claim 4
Dependent Claim 17 words
The method of claim 2 wherein the performing within the system management interface controller occurs via microprogramming.
Claim 5
Dependent Claim 25 words
The method of claim 1 wherein the step (c) of predicting further comprises predicting when a fault due to long term thermal drift will occur.
Claim 6
Dependent Claim 28 words
The method of claim 1 wherein the step (c) of predicting further comprises predicting when a fault due to component wearout within the redundant power converter will occur.
Claim 7
Independent Claim 71 words
A system for reporting faults in a redundant power converter, the system comprising: at least two redundant power converters coupled in parallel to a sensitive load; and a system manager interface controller coupled to the at least two redundant power converters for reporting a status of the at least two redundant power converters for prediction of when one or more of the at least two redundant power converters will exceed specification.
Claim 8
Independent Claim 71 words
A system for reporting faults in a redundant power converter, the system comprising: at least two redundant power converters coupled in parallel to a sensitive load; and a system manager interface controller coupled to the at least two redundant power converters for reporting a status of the at least two redundant power converters for prediction of when one or more of the at least two redundant power converters will exceed specification.
Claim 9
Dependent Claim 36 words
The system of claim 6 wherein the system management interface controller further monitors at least one node within the redundant power converter, and tracks values of the at least one node during a predetermined time period.
Claim 10
Dependent Claim 24 words
The system of claim 7 wherein the system management interface controller monitors and tracks the at least two redundant power converters via microcontroller programming.
Claim 11
Dependent Claim 15 words
The system of claim 6 wherein the sensitive load further comprises a central processing unit.
Claim 12
Dependent Claim 63 words
A computer readable medium containing program instructions for reporting faults in a redundant power converter, the program instructions comprising: (a) monitoring at least one node within the redundant power converter; (b) tracking values of the at least one node during a predetermined time period; and (c) predicting when a specification of the redundant power converter will be exceeded based on the tracked values.
Claim 13
Dependent Claim 63 words
A computer readable medium containing program instructions for reporting faults in a redundant power converter, the program instructions comprising: (a) monitoring at least one node within the redundant power converter; (b) tracking values of the at least one node during a predetermined time period; and (c) predicting when a specification of the redundant power converter will be exceeded based on the tracked values.
Claim 14
Dependent Claim 26 words
The program instructions of claim 10 wherein the step (c) of predicting further comprises predicting when a fault due to long term thermal drift will occur.
Claim 15
Dependent Claim 29 words
The program instructions of claim 10 wherein the step (c) of predicting further comprises predicting when a fault due to component wearout within the redundant power converter will occur.

References Cited (Backward Citations)

US5786641A Cited
US5808902A Cited
US5839093A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2003-03-07 2003-09-06 2004-03-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2007-03-07 2007-09-06 2008-03-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2011-03-07 2011-09-06 2012-03-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag