Claims Analysis
Total Claims: 23
Claim 1
Independent Claim
268 words
A system for searching for and tracking construction projects comprising: a mass data storage having a project information database of project information related to each of a plurality of construction projects, the project information containing a plurality of key words associated with at least one of a type of work to be done and a type of building material to be used; a document information database having construction document information in the form of at least one of a project description, blueprint plans, specifications, addenda, bid forms, contracts and miscellaneous information related to the construction projects in the project information database; a member terminal including; a computer connected to said mass data storage; an input device connected to said computer that allows a user of the system to access the project information database and said document information database; a display connected to said computer; said input device permitting a user to mark at least one of the construction projects for tracking by selecting at least one key word contained in related project information stored in said mass data storage and upon subsequently accessing said mass data storage, said computer automatically displays on said display each of the marked construction projects for which the related project information changed since the last time said mass data storage was accessed by the user; and wherein said computer responds to a user input at said input and displays on said display the construction document information related to each of the marked construction projects and the user can manipulate the displayed construction document information without altering the construction document information from said database.
Claim 2
Independent Claim
268 words
A system for searching for and tracking construction projects comprising: a mass data storage having a project information database of project information related to each of a plurality of construction projects, the project information containing a plurality of key words associated with at least one of a type of work to be done and a type of building material to be used; a document information database having construction document information in the form of at least one of a project description, blueprint plans, specifications, addenda, bid forms, contracts and miscellaneous information related to the construction projects in the project information database; a member terminal including; a computer connected to said mass data storage; an input device connected to said computer that allows a user of the system to access the project information database and said document information database; a display connected to said computer; said input device permitting a user to mark at least one of the construction projects for tracking by selecting at least one key word contained in related project information stored in said mass data storage and upon subsequently accessing said mass data storage, said computer automatically displays on said display each of the marked construction projects for which the related project information changed since the last time said mass data storage was accessed by the user; and wherein said computer responds to a user input at said input and displays on said display the construction document information related to each of the marked construction projects and the user can manipulate the displayed construction document information without altering the construction document information from said database.
Claim 3
Dependent Claim
50 words
The system according to claim 1, wherein the document information database includes a primary document file for storing primary documents related to a construction project, a secondary document file for storing secondary documents related to the primary documents and other files for storing other information related to the construction project.
Claim 4
Dependent Claim
52 words
The system according to claim 1, wherein said project information database is stored in a CD-ROM drive of said mass data storage and said document information database is stored in a computer database of said mass data storage, said computer being connected to said computer database by a telephone line and modems.
Claim 5
Dependent Claim
34 words
The system according to claim 3, including at least another member terminal for connection to the telephone line for communication with said computer database while said member terminal is communicating with said computer database.
Claim 6
Dependent Claim
39 words
The system according to claim 1, wherein said computer responds to a user input at said input device and automatically calculates a measurement related to a selected portion of one of the construction documents displayed on said display means.
Claim 7
Dependent Claim
54 words
The system of claim 1, wherein said computer responds to an input from said input device and automatically moves from a first one of the construction documents to a second one of the construction documents having a display that corresponds to information on the first document and displays the second document on said display.
Claim 8
Dependent Claim
35 words
The system of claim 1, wherein said computer updates said document information database such that each time a user manipulates the document information a resulting calculation is stored and subsequently automatically provided to the user.
Claim 9
Dependent Claim
104 words
The system according to claim 1, wherein said mass data storage is a computer database and including a server connected to said computer database, a main terminal connected to said server for periodically updating the project information and the document information stored in said computer database to reflect changes in such information, a main modem connected to said server for communicating via a communication link, and a member modem connected to said member terminal for communicating with the link whereby when said member modem and said main modem are connected to the link, a user can selectively connect said computer database to said computer.
Claim 10
Independent Claim
227 words
A method of searching for and tracking construction projects and manipulating information regarding the projects including the steps of: (A) storing a project information database of project information related to a plurality of construction projects, the project information containing a plurality of key words associated with at least one of a type of work to be done and a type of building material to be used and a plurality of construction documents associated with each project; (B) selecting at least one of the key words as a search parameter; (C) accessing the project information database, searching the project information in the project information database for the key word, and displaying an identification of each construction project having related information containing the key word; (D) selectively displaying at least one of the construction documents of at least a selected one of the projects from step (C); (E) manipulating the displayed document to generate additional document information without altering the displayed document; (F) marking at least one construction project from step (C) for tracking; (G) updating the project information stored in the project information database periodically to reflect changes in the project information; and (H) accessing the project information database after step (G) is performed and automatically displaying each marked construction project for which the related project information changed since the last time the project information database was accessed.
Claim 11
Independent Claim
227 words
A method of searching for and tracking construction projects and manipulating information regarding the projects including the steps of: (A) storing a project information database of project information related to a plurality of construction projects, the project information containing a plurality of key words associated with at least one of a type of work to be done and a type of building material to be used and a plurality of construction documents associated with each project; (B) selecting at least one of the key words as a search parameter; (C) accessing the project information database, searching the project information in the project information database for the key word, and displaying an identification of each construction project having related information containing the key word; (D) selectively displaying at least one of the construction documents of at least a selected one of the projects from step (C); (E) manipulating the displayed document to generate additional document information without altering the displayed document; (F) marking at least one construction project from step (C) for tracking; (G) updating the project information stored in the project information database periodically to reflect changes in the project information; and (H) accessing the project information database after step (G) is performed and automatically displaying each marked construction project for which the related project information changed since the last time the project information database was accessed.
Claim 12
Dependent Claim
32 words
The method according to claim 9, wherein the stored project information includes sort words and step (C) includes locating construction projects of interest by searching for selected ones of the sort words.
Claim 13
Dependent Claim
30 words
The method according to claim 9, including performing steps (A) and (G) on a main computer database and performing steps (C), (F), and (H) remotely from the main computer database.
Claim 14
Dependent Claim
36 words
The method according to claim 9, including performing steps (A) and (G) by storing the project information on a CD-ROM and performing steps (B) through (F) and (H) on the project information stored on the CD-ROM.
Claim 15
Dependent Claim
32 words
The method according to claim 9, including printing the project information related to selected ones of the construction projects displayed in steps (C) and printing the additional document information from step (E).
Claim 16
Dependent Claim
50 words
The method according to claim 9, wherein step (A) includes storing a document information database including construction document information in the form of at least one of a project description, blueprint plans, specifications, addenda, bid forms, contracts and miscellaneous information related to the construction projects in the project information database.
Claim 17
Dependent Claim
22 words
The method of claim 9, wherein step (E) includes calculating a measurement related to a selected portion of the displayed construction project.
Claim 18
Dependent Claim
34 words
The method of claim 9, wherein step (E) includes choosing a portion of a first displayed document and automatically displaying a second document containing information corresponding to the chosen portion of the first document.
Claim 19
Dependent Claim
22 words
The method of claim 9, further comprising updating the construction document information to include the additional document information generated in step (E).
Claim 20
Dependent Claim
18 words
The method of claim 17, wherein step (H) includes automatically including a display of the updated document information.
Claim 21
Dependent Claim
18 words
The method of claim 9, wherein step (A) includes storing the construction documents by scanning in blueprint drawings.
Claim 22
Dependent Claim
14 words
The method of claim 14, wherein step (A) includes scanning in the blueprint plans.
Claim 23
Dependent Claim
22 words
The system of claim 1, wherein the blueprint plans that are stored in the document information database are scanned in blueprint drawings.