Claims Analysis
Total Claims: 7
Claim 1
Independent Claim
185 words
A line balance index method of maintaining optimum queued quantities of products at a manufacturing step and over an entire manufacturing line, said method comprising: a) assigning a daily standard move of product (Std Move) which should be produced in a manufacturing line, said manufacturing line comprised of n number of stages i; each stage having a theoretical cycle time CT; each said stage having a current WIP CWi; b) calculating a standard WIP StdWIP for each manufacturing stage i by multiplying said theoretical cycle time C/T of each stage by said daily standard move StdMove; (StdWIP=CT*StdMove) c) Calculating a difference Di between said current WIP CWi and standard WIP StdWIP at every stage i; (Di=CWi-SWi,) d) calculating a cumulative difference CDi between said current WIP Cwi and said standard WIP StdWIP of every stage i from stage i to stage n and assigning ##EQU5## e) Calculating an index of line balance BIi by dividing the sum of all positive CDi from stage i to stage n by the absolute value of the sum of all negative CDi for stage i to stage n; ##EQU6##
Claim 2
Dependent Claim
185 words
A line balance index method of maintaining optimum queued quantities of products at a manufacturing step and over an entire manufacturing line, said method comprising: a) assigning a daily standard move of product (Std Move) which should be produced in a manufacturing line, said manufacturing line comprised of n number of stages i; each stage having a theoretical cycle time CT; each said stage having a current WIP CWi; b) calculating a standard WIP StdWIP for each manufacturing stage i by multiplying said theoretical cycle time C/T of each stage by said daily standard move StdMove; (StdWIP=CT*StdMove) c) Calculating a difference Di between said current WIP CWi and standard WIP StdWIP at every stage i; (Di=CWi-SWi,) d) calculating a cumulative difference CDi between said current WIP Cwi and said standard WIP StdWIP of every stage i from stage i to stage n and assigning ##EQU5## e) Calculating an index of line balance BIi by dividing the sum of all positive CDi from stage i to stage n by the absolute value of the sum of all negative CDi for stage i to stage n; ##EQU6##
Claim 3
Dependent Claim
66 words
The method of claim 1 which further includes: plotting said index of line balance BIi for each stage i as a line chart for each stage i; and allocating additional production resources to the stages that have an index of line balance BIi greater than about 1.2 and reducing production resources to the stages that have an index of line balance BIi less than about 0.80.
Claim 4
Dependent Claim
66 words
The method of claim 1 which further includes: plotting said index of line balance BIi for each stage i as a line chart for each stage i; and allocating additional production resources to the stages that have an index of line balance BIi greater than about 1.0 and reducing production resources to the stages that have an index of line balance BIi less than about 1.0.
Claim 5
Dependent Claim
242 words
A line balance index method of maintaining optimum queued quantities of products at a manufacturing step and over an entire manufacturing line, said method comprising: a) assigning a daily standard move of product (StdMove) which should be produced in a manufacturing line, said manufacturing line comprised of n number of stages i; each stage having a theoretical cycle time CT; each said stage having a current WIP CWi; b) calculating a standard WIP StdWIP for each manufacturing stage i by multiplying said theoretical cycle time C/T of each stage by said daily standard move StdMove; (StdWIP=CT*StdMove) c) Calculating a difference Di between said current WIP CWi and standard WIP StdWIP at every stage i; (Di=CWi-SWi,) d) calculating a cumulative difference CDi between said current WIP Cwi and said standard WIP StdWIP of every stage i from stage i to stage n and assigning ##EQU7## e) Calculating an index of line balance BIi by dividing the sum of all positive CDi from stage i to stage n by the absolute value of the sum of all negative CDi for stage i to stage n; ##EQU8## f) plotting the index of line balance BIi for each stage i as a line chart for each stage i; and g) allocating additional resources to the stages that have an index of line balance BIi greater than about 1.0 and reducing resources to the stages that have an index of line balance BIi less than about 1.0.
Claim 6
Dependent Claim
242 words
A line balance index method of maintaining optimum queued quantities of products at a manufacturing step and over an entire manufacturing line, said method comprising: a) assigning a daily standard move of product (StdMove) which should be produced in a manufacturing line, said manufacturing line comprised of n number of stages i; each stage having a theoretical cycle time CT; each said stage having a current WIP CWi; b) calculating a standard WIP StdWIP for each manufacturing stage i by multiplying said theoretical cycle time C/T of each stage by said daily standard move StdMove; (StdWIP=CT*StdMove) c) Calculating a difference Di between said current WIP CWi and standard WIP StdWIP at every stage i; (Di=CWi-SWi,) d) calculating a cumulative difference CDi between said current WIP Cwi and said standard WIP StdWIP of every stage i from stage i to stage n and assigning ##EQU7## e) Calculating an index of line balance BIi by dividing the sum of all positive CDi from stage i to stage n by the absolute value of the sum of all negative CDi for stage i to stage n; ##EQU8## f) plotting the index of line balance BIi for each stage i as a line chart for each stage i; and g) allocating additional resources to the stages that have an index of line balance BIi greater than about 1.0 and reducing resources to the stages that have an index of line balance BIi less than about 1.0.
Claim 7
Dependent Claim
44 words
The method of claim 4 which further includes allocating additional resources to the stages that have an index of line balance BIi greater than about 1.2 and reducing resources to the stages that have an index of line balance BIi less than about 0.80.