← Back to Patent Explorer
US5838660A Expired / Lapsed US ⏱️ 0.0 years remaining

Dynamic restoration process

Assignee: Verizon Patent and Licensing Inc
•
Filing: 1996-11-14
•
Granted: 1998-11-17
•
Expires: 2016-11-14
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method and apparatus is provided for dynamically generating routes within a diverse interconnected network which may be in a state of flux. This routing process will utilize node source/target sets and route intersection sets to reduce route generation time. In addition, the routing process makes route costing an integral part of the process rather than a completely predefined portion of the data fed to the process, thus eliminating the need to rebuild the data fed to the process if costs need to be dynamically adjusted. Data defining connectivity within a network is gathered from an existing database of network interconnections (referred to here as the topology). An existing route within this topology is deemed to be non-viable due to some failure within the network. The invention will locate, if available, the optimal route around the network failure point utilizing short/long routing and route intersection sets.

Inventors

  • 👤 William D. Croslin

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-31 23:17
CPC Classifications
H; H04; H04L; H04L45/00; H04L45/28

Claims Analysis

Total Claims: 10
Claim 1
Independent Claim 117 words
A process for generating an optimal restoral route for a telecommunications network having a diverse interconnected set of nodes arranged in a dynamically changing topology updated in a database, the network impacted at a failure point between source and target nodes, the process comprising the steps: identifying all possible short routes, which are those that accumulate less than a specified maximum threshold of cost, and include either a left-hand route from the source node to the target node, or a right-hand route from the target node to the source node; and if no short route is found that connects the source and target nodes, then identifying long routes by identifying an intersection of right-hand and left-hand routes.
Claim 2
Dependent Claim 117 words
A process for generating an optimal restoral route for a telecommunications network having a diverse interconnected set of nodes arranged in a dynamically changing topology updated in a database, the network impacted at a failure point between source and target nodes, the process comprising the steps: identifying all possible short routes, which are those that accumulate less than a specified maximum threshold of cost, and include either a left-hand route from the source node to the target node, or a right-hand route from the target node to the source node; and if no short route is found that connects the source and target nodes, then identifying long routes by identifying an intersection of right-hand and left-hand routes.
Claim 3
Dependent Claim 104 words
A process for generating an optimal restoral route for a telecommunications network having a diverse interconnected set of nodes arranged in a dynamically changing topology updated in a database, the network impacted at a failure point between source and target nodes, the process comprising the steps: (a) defining the source and target nodes separated by the failure point; (b) finding a left hand short route between the source and target nodes; (c) assessing operational costs along the route; (d) determining, from the costs, whether the route is optimal; (e) exiting the process if the route is optimal and identifying the left hand short route.
Claim 4
Dependent Claim 104 words
A process for generating an optimal restoral route for a telecommunications network having a diverse interconnected set of nodes arranged in a dynamically changing topology updated in a database, the network impacted at a failure point between source and target nodes, the process comprising the steps: (a) defining the source and target nodes separated by the failure point; (b) finding a left hand short route between the source and target nodes; (c) assessing operational costs along the route; (d) determining, from the costs, whether the route is optimal; (e) exiting the process if the route is optimal and identifying the left hand short route.
Claim 5
Dependent Claim 62 words
The process set forth in claim 2 further comprising the steps: (f) continuing as follows with the process if the route is not optimal; (g) finding a right hand route between the source and the target nodes; (h) finding a long route between the source and target nodes; and (i) determining whether the long route is superior to the left hand route.
Claim 6
Dependent Claim 51 words
The process set forth in claim 3 further comprising the steps: (j) exiting the process if the long route is superior, and identifying the long route as an optimal route; or (k) exiting the process if the long route is not superior, and identifying the short route as an optimal route.
Claim 7
Dependent Claim 99 words
The process of claim 2 wherein steps (b) and (g) respectively comprise the subprocess steps: finding a next node set between the source and target nodes to be evaluated; exiting the subprocess if there is no next node set; continuing with the subprocess if there is a next node set; finding a best route for the current node set; comparing a current route to a previous optimal route; returning to the step of finding a next node set if the comparison is unfavorable; and identifying the current route as an optimal route in the event the comparison is favorable.
Claim 8
Dependent Claim 189 words
The process of claim 5 wherein the step of finding a next node set comprises the subprocess steps: determining if an instant node set is for a left hand route; if the determination is positive, continuing as follows-- processing the next source node from the instant node set; determining whether there is a next source node; exiting the subprocess if the determination is negative; if the determination is affirmative, processing the next viable target node; determining if there is a next target node; exiting the subprocess if there is a next target node, or returning to processing a further next source node if there is not; if the determination is negative, continuing as follows-- processing the next target node as a source node; determining whether there is a next target node; exiting the subprocess if the determination is negative; if the determination is affirmative, processing the source node as the next target node; determining if there is a next source node; exiting the subprocess if there is a next source node, or returning to processing a new next target node as the next source node if there is not.
Claim 9
Dependent Claim 187 words
The process of claim 5 wherein the step of finding a best route for a current node set comprises the subprocess steps: beginning the subprocess at a source node; determining a route to a next node; determining whether the next node already exists in a current route and if it does determining the operational cost for a new route segment from the database; accumulating the cost over the route, including the next node; recording the cost over the route; comparing the accumulated cost to a preselected threshold; if the accumulated cost exceeds the threshold, continuing as follows-- eliminating the next node from routing consideration; and returning to the step of determining a route to the next node; if the accumulated cost does not exceed the threshold, continuing as follows-- determining whether the accumulated cost exceeds the best current route cost; if the determination is affirmative, eliminating the next node from routing consideration and reiterating the subprocess to select a new route to a new next node; and if the determination is negative, identifying the new route as the best route between the source and the current node.
Claim 10
Dependent Claim 225 words
The process of claim 7 further comprising the subprocess steps: recording intersection information, from the database, between the new best route and other routes connecting the source an current node; determining whether the route is a left hand route or a right hand route; if it is a right hand route, continuing with the following-- determining whether the current node is an intersection node and routing to the next node if it is not; or if it is, alternatively determining if the route is optimal; exiting the subprocess if the route is optimal; or if it is not, alternatively determining if the route is better than the best current route; routing to a next node if the route is not better; or if it better, alternatively recording the route as a best current route; if it is a left hand route, continuing with the following-- determining whether the current node is a target node and routing to the next node if it is not; or if it is, alternatively determining if the route is optimal; exiting the subprocess if the route is optimal; or if it is not, alternatively determining if the route is better than the best current route; and routing to a next node if the route is not better; or if it better, alternatively recording the route as a best current route.

References Cited (Backward Citations)

US5163042A Cited
US5235599A Cited
US4999829A Cited
US5016243A Cited
US5218601A Cited
US5173689A Cited
US5182744A Cited
US5278977A Cited
US5341364A Cited
US5596719A Cited
US5608721A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2001-11-16 2002-05-18 2002-11-17 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2005-11-16 2006-05-18 2006-11-17 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2009-11-16 2010-05-18 2010-11-17 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag