← Back to Patent Explorer
US5735352A Expired / Lapsed US ⏱️ 0.0 years remaining

Method for updating a site database using a triangular irregular network

Assignee: Caterpillar Inc
•
Filing: 1996-12-17
•
Granted: 1998-04-07
•
Expires: 2016-12-17
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract The present invention provides a method for updating a site database. The site database models the elevation of a work site using a Triangular Irregular Network (TIN). The TIN is composed of a plurality of points. Each point has associated known X and Y coordinates and a known elevation and is associated with a set of other points in the network to form triangles. The work site is modified by a work machine. The method includes the steps of receiving a new set of points. The new set of points includes at least first and second points. The first and second points have associated X, Y, and Z coordinates. The method also includes the steps of comparing the new set of points with a previous set of points and updating the triangular irregular network with the new set of points if a minimum distance has been traversed by the work machine.

Inventors

  • 👤 Daniel E. Henderson
  • 👤 Craig L. Koehrsen
  • 👤 David A. Paul
  • 👤 William C. Sahm

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 19:46
CPC Classifications
E; E02; E02F; E02F3/00; E02F3/04; E02F3/76; E02F3/80; E02F3/84; E02F3/844; E02F3/847; E02F3/841; E02F3/842

Claims Analysis

Total Claims: 7
Claim 1
Independent Claim 129 words
A method for updating a site database, the site database modeling an elevation of a work site using a Triangular Irregular Network (TIN), the TIN being composed of a plurality of points, each point having associated known X and Y coordinates and a known elevation and being associated with a set of other points in the TIN to form triangles, including the steps of: receiving a new set of points, the new set of points including at least first and second points, the first and second points having associated X, Y, and Z coordinates; comparing said new set of points with a previous set of points; and updating the Triangular Irregular Network with the new set of points if a minimum distance has been traversed by a work machine.
Claim 2
Independent Claim 129 words
A method for updating a site database, the site database modeling an elevation of a work site using a Triangular Irregular Network (TIN), the TIN being composed of a plurality of points, each point having associated known X and Y coordinates and a known elevation and being associated with a set of other points in the TIN to form triangles, including the steps of: receiving a new set of points, the new set of points including at least first and second points, the first and second points having associated X, Y, and Z coordinates; comparing said new set of points with a previous set of points; and updating the Triangular Irregular Network with the new set of points if a minimum distance has been traversed by a work machine.
Claim 3
Dependent Claim 25 words
A method, as set forth in claim 1, wherein a work machine modifies the work site and the site database is updated in real time.
Claim 4
Dependent Claim 26 words
A method, as set forth in claim 2, wherein the work machine is a motor grader, the motor grader having a work implement with a blade.
Claim 5
Dependent Claim 59 words
A method, as set forth in claim 3, wherein the new set of points includes first, second, and third points, the first, second, and third points corresponding to a left blade tip point, a mid blade point, and a right blade tip point, respectively, and including the step of determining the positions of the first, second, and third points.
Claim 6
Dependent Claim 41 words
A method, as set forth in claim 1, wherein the site database represents an original ground layer and wherein only the points in the new set of points which are not covered by an existing TIN are incorporated into the TIN.
Claim 7
Dependent Claim 32 words
A method, as set forth in claim 1, wherein the site database represents a current site surface and wherein all points in the new set of points are incorporated into the TIN.

References Cited (Backward Citations)

US5078215A Cited
US5100229A Cited
US5631658A Cited
US5404661A Cited
US5607205A Cited
US5612864A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2001-04-06 2001-10-06 2002-04-07 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2005-04-06 2005-10-06 2006-04-07 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2009-04-06 2009-10-06 2010-04-07 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag