← Back to Patent Explorer
US5724254A Expired / Lapsed US ⏱️ 0.0 years remaining

Apparatus and method for analyzing power plant water chemistry

Assignee: Electric Power Research Institute
•
Filing: 1996-01-18
•
Granted: 1998-03-03
•
Expires: 2016-01-18
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A power plant water chemistry analysis apparatus and method relies upon water chemistry sensors to obtain power plant water chemistry data characterizing the chemical activity of a power plant water system. An analytical model processor is used to generate model predictions for the power plant water system. A statistical data fitting processor selects screened data from the power plant water chemistry data that corresponds to the model predictions. The screened data is processed by an artificial intelligence processor to derive power plant water chemistry diagnostic information. The artificial intelligence processor includes an expert system, rule base, plant water chemistry system simulator, and pattern recognition module.

Inventors

  • 👤 Peter J. Millett
  • 👤 Gary D. Burns
  • 👤 Gary E. Brobst

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-06 15:02
CPC Classifications
G; G01; G01N; G01N33/00; G01N33/18; G06; G06F; G06F18/00; G06F18/20; G06F18/24; G06F18/24765; G06F2219/00

Claims Analysis

Total Claims: 19
Claim 1
Independent Claim 96 words
A power plant water chemistry analysis apparatus, comprising: water chemistry sensors to obtain power plant water chemistry data characterizing the chemical activity of a power plant water system; an analytical model processor to generate model predictions for said power plant water system; and an artificial intelligence processor to process said power plant water chemistry data and said model predictions, which in combination constitute over specified system data with more known power plant water chemistry data than unknown model predictions, said artificial intelligence processor generating power plant water chemistry diagnostic information from said over specified system data.
Claim 2
Dependent Claim 96 words
A power plant water chemistry analysis apparatus, comprising: water chemistry sensors to obtain power plant water chemistry data characterizing the chemical activity of a power plant water system; an analytical model processor to generate model predictions for said power plant water system; and an artificial intelligence processor to process said power plant water chemistry data and said model predictions, which in combination constitute over specified system data with more known power plant water chemistry data than unknown model predictions, said artificial intelligence processor generating power plant water chemistry diagnostic information from said over specified system data.
Claim 3
Dependent Claim 25 words
The apparatus of claim 1 wherein said artificial intelligence processor includes a power plant water chemistry system simulator to process said over specified system data.
Claim 4
Dependent Claim 22 words
The apparatus of claim 1 further comprising: a statistical data fitting processor to select screened data from said over specified system data.
Claim 5
Dependent Claim 32 words
The apparatus of claim 3 wherein said statistical data fitting processor determines the statistical best fit of said power plant water chemistry data that satisfy the constraints given by said model predictions.
Claim 6
Dependent Claim 21 words
The apparatus of claim 1 wherein said artificial intelligence processor includes a rule base to process said over specified system data.
Claim 7
Dependent Claim 23 words
The apparatus of claim 1 wherein said artificial intelligence processor further includes a pattern recognition module to process said over specified system data.
Claim 8
Dependent Claim 96 words
A computer readable memory to direct a computer to function in a specified manner, comprising: power plant water chemistry data characterizing the chemical activity of a power plant water system; model predictions for said power plant water system; and executable instructions stored in said memory, said executable instructions including instructions to process said power plant water chemistry data and said model predictions, which in combination constitute over specified system data with more known power plant water chemistry data than unknown model predictions, to generate power plant water chemistry diagnostic information from said over specified system data.
Claim 9
Dependent Claim 96 words
A computer readable memory to direct a computer to function in a specified manner, comprising: power plant water chemistry data characterizing the chemical activity of a power plant water system; model predictions for said power plant water system; and executable instructions stored in said memory, said executable instructions including instructions to process said power plant water chemistry data and said model predictions, which in combination constitute over specified system data with more known power plant water chemistry data than unknown model predictions, to generate power plant water chemistry diagnostic information from said over specified system data.
Claim 10
Dependent Claim 26 words
The apparatus of claim 7 wherein said executable instructions include instructions defining a power plant water chemistry system simulator to process said over specified system data.
Claim 11
Dependent Claim 27 words
The apparatus of claim 7 wherein said executable instructions include instructions defining a statistical data fitting processor to select screened data from said over specified system data.
Claim 12
Dependent Claim 22 words
The apparatus of claim 7 wherein said executable instructions include instructions defining a rule base to process said over specified system data.
Claim 13
Dependent Claim 23 words
The apparatus of claim 7 wherein said executable instructions include instructions defining a pattern recognition module to process said over specified system data.
Claim 14
Independent Claim 78 words
A method of analyzing power plant water chemistry, said method comprising the steps of: accumulating power plant water chemistry data characterizing the chemical activity of a power plant water system; generating model predictions for said power plant water system; and deriving power plant water chemistry diagnostic information from said power plant water chemistry data and said model predictions, which in combination constitute over specified system data with more known power plant water chemistry data than unknown model predictions.
Claim 15
Independent Claim 78 words
A method of analyzing power plant water chemistry, said method comprising the steps of: accumulating power plant water chemistry data characterizing the chemical activity of a power plant water system; generating model predictions for said power plant water system; and deriving power plant water chemistry diagnostic information from said power plant water chemistry data and said model predictions, which in combination constitute over specified system data with more known power plant water chemistry data than unknown model predictions.
Claim 16
Dependent Claim 19 words
The method of claim 12 further comprising the step of selecting screened data from said over specified system data.
Claim 17
Dependent Claim 23 words
The method of claim 12 wherein said deriving step includes the step of processing said over specified system data with a rule base.
Claim 18
Dependent Claim 27 words
The method of claim 12 wherein said deriving step includes the step of processing said over specified system data with a power plant water chemistry system simulator.
Claim 19
Dependent Claim 24 words
The method of claim 12 wherein said deriving step includes the step of processing said over specified system data with a pattern recognition module.

References Cited (Backward Citations)

US4943161A Cited
US4886590A Cited
US4943929A Cited
US5203984A Cited
US5239483A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2001-03-02 2001-09-01 2002-03-03 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2005-03-02 2005-09-01 2006-03-03 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2009-03-02 2009-09-01 2010-03-03 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag