Abstract

Abstract A method of continued grinding of cement is disclosed in order to obtain cement with a high specific surface and/or a steep grain size distribution curve. The grinding is performed in a mill with agitated grinding medium from a specific surface of 300-400 m 2 /kg (Blaine) to a specific surface of up to 1,200 m 2 /kg (Blaine) and with a particle size distribution such that about 80% of the particles pass a sieve opening with a size up to about 25 microns, using grinding bodies with an average size within the interval of 2 to 15 mm.

Inventors

  • 👤 Lars Lidstrom

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 08:08
CPC Classifications
C; C04; C04B; C04B7/00; C04B7/36; C04B7/48; C04B7/52; B; B02; B02C; B02C17/00; B02C17/16; Y; Y02; Y02P; Y02P40/00; Y02P40/10

Claims Analysis

Total Claims: 11
Claim 1
Independent Claim 106 words
Method of grinding cement, comprising the steps of: providing a grinding medium comprising grinding bodies with an average size within the interval of 2 to 15 mm into an agitating mill, and grinding the cement in said agitating mill with said grinding medium to provide ground cement particles, wherein the cement is ground from a specific surface of 300-400 m 2 /kg (Blaine) to a specific surface of up to 1 200 m 2 /kg (Blaine), and wherein the ground cement particles have a particle size distribution such that about 80% of the particles pass a sieve opening with a size up to about 25 μm.
Claim 2
Dependent Claim 106 words
Method of grinding cement, comprising the steps of: providing a grinding medium comprising grinding bodies with an average size within the interval of 2 to 15 mm into an agitating mill, and grinding the cement in said agitating mill with said grinding medium to provide ground cement particles, wherein the cement is ground from a specific surface of 300-400 m 2 /kg (Blaine) to a specific surface of up to 1 200 m 2 /kg (Blaine), and wherein the ground cement particles have a particle size distribution such that about 80% of the particles pass a sieve opening with a size up to about 25 μm.
Claim 3
Dependent Claim 36 words
Method according to claim 1, characterized in that the grinding is performed to a particle size distribution such that 80% of the particles pass a sieve opening having a size of up to about 15 μm.
Claim 4
Dependent Claim 36 words
Method according to claim 1, characterized in that the grinding is performed to a particle size distribution such that 80% of the particles pass a sieve opening having a size of up to about 10 μm.
Claim 5
Dependent Claim 36 words
Method according to claim 1, characterized in that the grinding is performed to a particle size distribution such that 80% of the particles pass a sieve opening having a size of up to about 4-8 μm.
Claim 6
Dependent Claim 16 words
Method according to claim 1, characterized in that the grinding is performed in a dry environment.
Claim 7
Dependent Claim 16 words
Method according to claim 1, characterized in that the grinding is performed in a wet environment.
Claim 8
Dependent Claim 29 words
Method according to claims 1, characterized in that grinding additives in the form of dispersion agents are added for obtaining of specific surfaces exceeding 300-350 m 2 /kg (Blaine).
Claim 9
Dependent Claim 13 words
The method of claim 7, wherein the grinding additive is glycol or ethanolamine.
Claim 10
Dependent Claim 28 words
Method according to claim 1, characterized in that the continued grinding is performed in direct connection with use in order to maintain the reactivity obtained in the grinding.
Claim 11
Dependent Claim 21 words
Method according to claim 1, characterized in that the ground cement is classified subsequent to the grinding in a classification equipment.

References Cited (Backward Citations)

GB1160569A Cited
EP0267170A1 Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2000-07-28 2001-01-27 2001-07-29 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2004-07-28 2005-01-27 2005-07-29 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2008-07-28 2009-01-27 2009-07-29 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag