← Back to Patent Explorer
US5605099A Expired / Lapsed US ⏱️ 0.0 years remaining

Maintenance vehicle and method for measuring and maintaining the level of a railroad track

Assignee: Harsco Technologies LLC
•
Filing: 1994-12-22
•
Granted: 1997-02-25
•
Expires: 2014-12-22
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A maintenance vehicle and associated method for measuring and correcting the level of a railroad track in a single pass. An instrument carriage, or frog, is towed by and in fixed relationship to the maintenance vehicle. The frog carries at least one inclinometer to measure at least one of longitudinal level and crossfall. As the vehicle periodically stops to work the track e.g. tamping or stoneblowing), the inclinometers are provided with the settling time necessary for accurate readings. In an additionally disclosed method, the track is measured and modeled prior to working using a primary measurement system and is then measured and modeled a second time while the track is worked using the frog.

Inventors

  • 👤 Dennis A. Sroka
  • 👤 William E. Perry
  • 👤 Bruce W. Bradshaw
  • 👤 David M. Johnson

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 10:05
CPC Classifications
E; E01; E01B; E01B35/00; E01B35/06; E01B35/08

Claims Analysis

Total Claims: 19
Claim 1
Independent Claim 114 words
A method for measuring and maintaining the level of the rails of a railroad track, comprising the steps of: (a) measuring data indicative of the profile of the railroad track using a primary measuring system; (b) measuring data indicative of the profile of the railroad track using a secondary measuring system during a maintenance pass over the rails; (c) comparing the data collected by the secondary measuring system with the data collected by the primary measuring system to evaluate the accuracy of the data collected by the primary measuring system; and (d) resolving any significant deviation between the data collected by the primary measuring system and the data collected by the secondary measuring system.
Claim 2
Independent Claim 114 words
A method for measuring and maintaining the level of the rails of a railroad track, comprising the steps of: (a) measuring data indicative of the profile of the railroad track using a primary measuring system; (b) measuring data indicative of the profile of the railroad track using a secondary measuring system during a maintenance pass over the rails; (c) comparing the data collected by the secondary measuring system with the data collected by the primary measuring system to evaluate the accuracy of the data collected by the primary measuring system; and (d) resolving any significant deviation between the data collected by the primary measuring system and the data collected by the secondary measuring system.
Claim 3
Independent Claim 132 words
A method for measuring and maintaining the level of the rails of a railroad track, comprising the steps of: (a) measuring data indicative of the rise and fall and crossfall of the rails at periodic locations along the length of the railroad track using a first measuring system; (b) generating a first track profile from the measurements taken by the first measuring system; (c) measuring data indicative of the rise and fall and crossfall of the rails at periodic locations along the length of the railroad track using a second measuring system during a maintenance pass over the rails; (d) comparing the data from the second measuring system with the first track profile; and (e) resolving any substantial deviation between the first track profile and the data from the second measuring system.
Claim 4
Independent Claim 132 words
A method for measuring and maintaining the level of the rails of a railroad track, comprising the steps of: (a) measuring data indicative of the rise and fall and crossfall of the rails at periodic locations along the length of the railroad track using a first measuring system; (b) generating a first track profile from the measurements taken by the first measuring system; (c) measuring data indicative of the rise and fall and crossfall of the rails at periodic locations along the length of the railroad track using a second measuring system during a maintenance pass over the rails; (d) comparing the data from the second measuring system with the first track profile; and (e) resolving any substantial deviation between the first track profile and the data from the second measuring system.
Claim 5
Dependent Claim 16 words
The method of claim 2, wherein the second measuring system is a frog type measuring system.
Claim 6
Dependent Claim 16 words
The method of claim 3, wherein the first measuring system is a chord type measuring system.
Claim 7
Dependent Claim 20 words
The method of claim 4, further comprising the step of generating a second track profile prior to the comparing step.
Claim 8
Dependent Claim 90 words
The method of claim 5, wherein step (c) further comprises the steps of: (a) measuring data indicative of the rise and fall of one of the railroad track rails and the crossfall of the rails at each location where the maintenance vehicle stops to perform maintenance; (b) for each location where a measurement is taken, waiting a sufficient period of time for the inclinometers to settle prior to taking any measurements; and (c) measuring the distance travelled along the railroad track rails between each location where a measurement is taken.
Claim 9
Independent Claim 165 words
A method for maintaining railroad track having a plurality of ties comprising: measuring at least one of longitudinal level and crossfall of a track using a primary measuring system; moving a vehicle along the track to be leveled; stopping the vehicle as a function of the locations of the ties; linking an instrument cart with the vehicle, whereby the cart moves and stops with the vehicle; positioning at least one inclinometer on the cart to read at least one of longitudinal level and crossfall; working the track while the vehicle is stopped; reading the inclinometer while the vehicle and, consequently, the cart are stopped; comparing at least one of longitudinal level and crossfall measured by the primary measuring system with at least one of longitudinal level and crossfall measured by the inclinometer; and resolving any significant deviation between at least one of longitudinal level and crossfall measured by the primary measuring system and at least one of longitudinal level and crossfall measured by the inclinometer.
Claim 10
Independent Claim 165 words
A method for maintaining railroad track having a plurality of ties comprising: measuring at least one of longitudinal level and crossfall of a track using a primary measuring system; moving a vehicle along the track to be leveled; stopping the vehicle as a function of the locations of the ties; linking an instrument cart with the vehicle, whereby the cart moves and stops with the vehicle; positioning at least one inclinometer on the cart to read at least one of longitudinal level and crossfall; working the track while the vehicle is stopped; reading the inclinometer while the vehicle and, consequently, the cart are stopped; comparing at least one of longitudinal level and crossfall measured by the primary measuring system with at least one of longitudinal level and crossfall measured by the inclinometer; and resolving any significant deviation between at least one of longitudinal level and crossfall measured by the primary measuring system and at least one of longitudinal level and crossfall measured by the inclinometer.
Claim 11
Dependent Claim 21 words
A method as defined in claim 7 further comprising placing a load on the cart at least during said reading step.
Claim 12
Independent Claim 133 words
A method for measuring and maintaining the level of the rails of a railroad track, comprising the steps of: (a) measuring data indicative of the profile of the railroad track using a secondary measuring system during a maintenance pass over the rails; (b) generating a secondary track profile from the data collected by the secondary measuring system; (c) maintaining the track as a function of the secondary track profile; (d) measuring data indicative of the profile of the railroad track using a primary measuring system; and (e) generating a primary track profile from the data collected by the primary measuring system; wherein step (c) includes comparing the primary and secondary track profiles to ensure the validity of the primary track profile, and resolving any significant deviation between the primary and secondary track profiles.
Claim 13
Independent Claim 133 words
A method for measuring and maintaining the level of the rails of a railroad track, comprising the steps of: (a) measuring data indicative of the profile of the railroad track using a secondary measuring system during a maintenance pass over the rails; (b) generating a secondary track profile from the data collected by the secondary measuring system; (c) maintaining the track as a function of the secondary track profile; (d) measuring data indicative of the profile of the railroad track using a primary measuring system; and (e) generating a primary track profile from the data collected by the primary measuring system; wherein step (c) includes comparing the primary and secondary track profiles to ensure the validity of the primary track profile, and resolving any significant deviation between the primary and secondary track profiles.
Claim 14
Dependent Claim 19 words
The method of claim 9, wherein the primary measuring system and the secondary measuring system are different measuring systems.
Claim 15
Dependent Claim 24 words
The method of claim 10, wherein step (d) is further defined as measuring the rise and fall of each of the railroad track rails.
Claim 16
Dependent Claim 34 words
The method of claim 11 wherein step (a) is further defined as measuring the rise and fall of one of the railroad track rails and measuring the crossfall of the two railroad track rails.
Claim 17
Dependent Claim 16 words
The method of claim 12, wherein the secondary measuring system is a frog type measuring system.
Claim 18
Dependent Claim 16 words
The method of claim 13, wherein the primary measuring system is a chord type measuring system.
Claim 19
Dependent Claim 77 words
The method of claim 14, wherein step (c) further comprises the steps of: (a) measuring the profile of the railroad track rails at each location where the maintenance vehicle stops to perform maintenance; (b) for each location where a measurement is taken, waiting a sufficient period of time for the inclinometers to settle prior to taking any measurements; and (c) measuring the distance travelled along the railroad track rails between each location where a measurement is taken.

References Cited (Backward Citations)

US3594912A Cited
US3821853A Cited
US4155176A Cited
US4173073A Cited
GB2085825A Cited
US4442709A Cited
US4497255A Cited
US4574704A Cited
US4673854A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 2000-02-25 2000-08-26 2001-02-25 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2004-02-25 2004-08-26 2005-02-25 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2008-02-25 2008-08-26 2009-02-25 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag