US5584985A
Expired / Lapsed
US
⏱️ 0.0 years remaining
FCC separation method and apparatus with improved stripping
Assignee: Honeywell UOP LLC
•
Filing: 1994-12-27
•
Granted: 1996-12-17
•
Expires: 2014-12-27
Abstract
Abstract In this invention a cyclonic separation method and apparatus discharges particulate solids and gaseous fluids into a separation vessel from a discharge opening of a central conduit and withdraws separated gaseous fluids from the separation vessel that contacts the catalyst in the separation vessel with redistributed gases from outside the separation vessel. The invention increases the effective utilization of available stripping medium in an FCC process.
Inventors
- 👤 David A. Lomas
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-08 19:07
CPC Classifications
C; C10; C10G; C10G11/00; C10G11/14; C10G11/18
Claims Analysis
Total Claims: 5
Claim 1
Independent Claim
313 words
An FCC process for the fluidized catalytic cracking of a hydrocarbon feedstock comprising: passing a hydrocarbon feedstock and solid catalyst particles into a riser conversion zone comprising a conduit to produce a mixture of solid particles and gaseous fluids; passing said mixture of said catalyst particles and gaseous fluids into a separation vessel through said conduit wherein said conduit occupies a central portion of said separation vessel and said separation vessel is located within a reactor vessel; tangentially discharging said mixture from said conduit through a discharge opening into said separation vessel; passing catalyst particles into a first catalyst bed located in a lower portion of said separation vessel and contacting said catalyst particles with a first stripping gas in said first bed; passing said catalyst particles from said first bed into a second bed located in said separation vessel below said first catalyst bed, contacting said catalyst particles with a second stripping gas and passing said second stripping gas into said first catalyst bed to supply a portion of said first stripping gas; passing said catalyst particles from said second bed to a stripping zone, contacting said particles with a third stripping gas in said stripping zone and passing said third stripping gas into said second catalyst bed to supply at least a portion of said second stripping gas; passing a purge medium into an upper portion of said reactor vessel; passing at least a portion of said purge medium through a plurality of restricted openings arranged circumferentially around the outside said separation vessel at the bottom of said first catalyst bed to supply a portion of said first stripping gas; recovering stripped catalyst particles from said stripping zone; and, collecting gaseous fluids including said first stripping gas and catalyst particles from an upper portion of said separation vessel into an outlet and withdrawing gaseous fluids from said separation vessel for recovery.
Claim 2
Dependent Claim
313 words
An FCC process for the fluidized catalytic cracking of a hydrocarbon feedstock comprising: passing a hydrocarbon feedstock and solid catalyst particles into a riser conversion zone comprising a conduit to produce a mixture of solid particles and gaseous fluids; passing said mixture of said catalyst particles and gaseous fluids into a separation vessel through said conduit wherein said conduit occupies a central portion of said separation vessel and said separation vessel is located within a reactor vessel; tangentially discharging said mixture from said conduit through a discharge opening into said separation vessel; passing catalyst particles into a first catalyst bed located in a lower portion of said separation vessel and contacting said catalyst particles with a first stripping gas in said first bed; passing said catalyst particles from said first bed into a second bed located in said separation vessel below said first catalyst bed, contacting said catalyst particles with a second stripping gas and passing said second stripping gas into said first catalyst bed to supply a portion of said first stripping gas; passing said catalyst particles from said second bed to a stripping zone, contacting said particles with a third stripping gas in said stripping zone and passing said third stripping gas into said second catalyst bed to supply at least a portion of said second stripping gas; passing a purge medium into an upper portion of said reactor vessel; passing at least a portion of said purge medium through a plurality of restricted openings arranged circumferentially around the outside said separation vessel at the bottom of said first catalyst bed to supply a portion of said first stripping gas; recovering stripped catalyst particles from said stripping zone; and, collecting gaseous fluids including said first stripping gas and catalyst particles from an upper portion of said separation vessel into an outlet and withdrawing gaseous fluids from said separation vessel for recovery.
Claim 3
Dependent Claim
21 words
The process of claim 1 wherein a portion of said purge medium passes into the bottom of said second catalyst bed.
Claim 4
Dependent Claim
18 words
The process of claim 1 wherein said restricted openings create a pressure drop of at least 0.25 psi.
Claim 5
Dependent Claim
41 words
The process of claim 1 wherein said gaseous fluids are separated in a cyclone separator, catalyst particles from said cyclone are passed to said stripping zone and hydrocarbons entrained with the catalyst from said cyclone separator pass through said restricted openings.
References Cited (Backward Citations)
US2535140A
Cited
US4670410A
Cited
US4397738A
Cited
US4482451A
Cited
US4581205A
Cited
US4738829A
Cited
US4792437A
Cited
US4701307A
Cited
US4689206A
Cited
US4963328A
Cited
US4988430A
Cited
US5262046A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1999-12-17 | 2000-06-17 | 2000-12-17 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2003-12-17 | 2004-06-17 | 2004-12-17 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2007-12-17 | 2008-06-17 | 2008-12-17 | $7700.00 | Window Closed / Lapsed |