← Back to Patent Explorer
US5576700A Expired / Lapsed US ⏱️ 0.0 years remaining

Apparatus and method for controlling an electrical load and monitoring control operations and the electrical load

Assignee: Comverge Inc
•
Filing: 1992-08-26
•
Granted: 1996-11-19
•
Expires: 2012-08-26
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A method and apparatus for controlling an electrical load in an electrical load management system and monitoring the load control operations and the energy supplied to the electrical load. The apparatus includes a controller for controlling an electrical load in an electrical distribution network in response to command signals transmitted by a command center remotely located from the electrical load. A first monitor generates electrical load data in response to detecting the distribution or interruption of energy to the electrical load. Furthermore, a second monitor generates electrical load reduction data in response to detecting the control operation of the controller. The apparatus also includes a communicator means for transmitting the electrical load data and the electrical load control data to a data processing center remotely located from the electrical load. The data processing center processes the electrical load data and the electrical load control data to determine the effectiveness of the electrical load management system.

Inventors

  • 👤 Glenn A. Davis
  • 👤 James M. Massara

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-05 02:12
CPC Classifications
H; H02; H02J; H02J13/00; H02J13/13; H02J13/1337; H02J13/12; H02J13/1331; Y; Y02; Y02E; Y02E60/00; Y04; Y04S; Y04S10/00; Y04S10/30; Y04S40/00; Y04S40/12; Y04S40/126

Claims Analysis

Total Claims: 71
Claim 1
Independent Claim 209 words
In an electrical load management system, said system including a plurality of an improved load control switching and monitoring apparatus, each of said improved apparatus located proximate to an electrical load to be controlled, and a data processing center remotely located and separated from said electrical load, for causing electrical load reductions in an electrical distribution network and monitoring each of said electrical load reductions and energy supplied to said electrical load, said apparatus comprising: control means for controlling said electrical load in said electrical distribution network in response to command signals transmitted by a command center, said command center remotely located from said electrical load; first monitoring means for generating electrical load data in response to detecting the distribution and interruption of said energy to said electrical load; second monitoring means for generating electrical load control data in response to detecting the control operation of said control means; and data collection means for collecting said electrical load data and said electrical load control data and communicating said electrical load data and said electrical load control data to said data processing center, said data processing center operative to process said electrical load data and said electrical load control data to determine the effectiveness of said electrical load management system.
Claim 2
Dependent Claim 209 words
In an electrical load management system, said system including a plurality of an improved load control switching and monitoring apparatus, each of said improved apparatus located proximate to an electrical load to be controlled, and a data processing center remotely located and separated from said electrical load, for causing electrical load reductions in an electrical distribution network and monitoring each of said electrical load reductions and energy supplied to said electrical load, said apparatus comprising: control means for controlling said electrical load in said electrical distribution network in response to command signals transmitted by a command center, said command center remotely located from said electrical load; first monitoring means for generating electrical load data in response to detecting the distribution and interruption of said energy to said electrical load; second monitoring means for generating electrical load control data in response to detecting the control operation of said control means; and data collection means for collecting said electrical load data and said electrical load control data and communicating said electrical load data and said electrical load control data to said data processing center, said data processing center operative to process said electrical load data and said electrical load control data to determine the effectiveness of said electrical load management system.
Claim 3
Dependent Claim 75 words
The apparatus of claim 1 wherein said data collection means comprises: recording means for recording said electrical load control data and said electrical load data during a plurality of predetermined time intervals to produce a plurality of electrical load control data packets and a plurality of electrical load data packets; and communicating means for transmitting said plurality of electrical load-control data packets and said plurality of electrical load data packets to said data processing center.
Claim 4
Dependent Claim 35 words
The apparatus of claim 2, wherein each of said plurality of said electrical load control data packets contains information relating to the operating status of said control means during one of said predetermined time intervals.
Claim 5
Dependent Claim 35 words
The apparatus of claim 3, wherein each of said plurality of said electrical load control data packets include timing data indicating the relative time for the start of said one of said predetermined time intervals.
Claim 6
Dependent Claim 38 words
The apparatus of claim 2, wherein each of said plurality of said electrical load data packets contains information relating to whether said energy is interrupted and supplied to said electrical load during one of said predetermined time intervals.
Claim 7
Dependent Claim 34 words
The apparatus of claim 5, wherein each of said plurality of said electrical load data packets includes timing data indicating the relative time for the start of said one of said predetermined time intervals.
Claim 8
Dependent Claim 44 words
The apparatus of claim 6, wherein said communicating means transmits said plurality of said electrical load control data packets and said plurality of electrical load data packets to said data processing center in response to an instruction signal transmitted by said data processing center.
Claim 9
Dependent Claim 35 words
The apparatus of claim 7, wherein said data processing center processes said plurality of electrical load control data packets and said electrical load data packets to determine the effectiveness of said electrical load management system.
Claim 10
Dependent Claim 38 words
The apparatus of claim 1, wherein said data collection means transmits said electrical load control data and said electrical load data to said data processing center in response to an instruction signal transmitted by said data processing center.
Claim 11
Dependent Claim 33 words
The apparatus of claim 1, wherein said data collection means transmits said electrical load control data and said electrical load data to said data processing center in response to an internal preprogrammed instruction.
Claim 12
Dependent Claim 15 words
The apparatus of claim 1, wherein said data collection means includes a wireless communications system.
Claim 13
Dependent Claim 19 words
The apparatus of claim 1, wherein said data collection means includes a modem interface connected to a telephone system.
Claim 14
Dependent Claim 22 words
The apparatus of claim 1, wherein said command center transmits said command signals to said control means via a wireless communications system.
Claim 15
Dependent Claim 23 words
The apparatus of claim 1, wherein said command center transmits said command signals to said control means via a power line carrier system.
Claim 16
Dependent Claim 21 words
The apparatus of claim 1, wherein said command center transmits said command signals to said control means via a telephone system.
Claim 17
Dependent Claim 267 words
In an electrical load management system, said system including means for transmitting coded command signals for causing electrical load reductions from an electrical distribution network and an improved load control switching and monitoring apparatus located proximate to each of a plurality of electrical loads to be controlled, said improved apparatus comprising: control means responsive to said coded command signals to remove and insert a selected one of said plurality of said electrical loads in said electrical distribution network; first monitoring means for producing electrical load data in response to detecting the distribution or interruption of energy to said selected electrical load; second monitoring means for producing electrical load control data in response to detecting the operation of said control means to remove said selected electrical load from said electrical distribution network and to insert said selected electrical load from said electrical distribution network; recording means for recording said electrical load control data and said electrical load data during a plurality of predetermined time intervals to produce a plurality of stored electrical load control data packets and a plurality of stored electrical load data packets; and communicating means for communicating said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to a data processing center, said data processing center, responsive to receiving said electrical load control data packets and said electrical load data packets, for processing said electrical load data and said electrical load control data to determine the effectiveness of said electrical load management system, said data processing center remotely located and separated from said electrical loads.
Claim 18
Dependent Claim 267 words
In an electrical load management system, said system including means for transmitting coded command signals for causing electrical load reductions from an electrical distribution network and an improved load control switching and monitoring apparatus located proximate to each of a plurality of electrical loads to be controlled, said improved apparatus comprising: control means responsive to said coded command signals to remove and insert a selected one of said plurality of said electrical loads in said electrical distribution network; first monitoring means for producing electrical load data in response to detecting the distribution or interruption of energy to said selected electrical load; second monitoring means for producing electrical load control data in response to detecting the operation of said control means to remove said selected electrical load from said electrical distribution network and to insert said selected electrical load from said electrical distribution network; recording means for recording said electrical load control data and said electrical load data during a plurality of predetermined time intervals to produce a plurality of stored electrical load control data packets and a plurality of stored electrical load data packets; and communicating means for communicating said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to a data processing center, said data processing center, responsive to receiving said electrical load control data packets and said electrical load data packets, for processing said electrical load data and said electrical load control data to determine the effectiveness of said electrical load management system, said data processing center remotely located and separated from said electrical loads.
Claim 19
Dependent Claim 71 words
The apparatus of claim 16, wherein said control means comprises: a load management receiver for decoding said coded command signals to produce decoded command signals; and switching means for removing said selected electrical load from said electrical distribution network in response to a selected one of said decoded command signals and inserting said selected electrical load within said electrical distribution network in response to another one of said decoded command signals.
Claim 20
Dependent Claim 34 words
The improvement of claim 17, wherein each of said coded command signals comprises address data and command data, wherein said load management receiver is responsive to said command data only for predetermined address data.
Claim 21
Dependent Claim 87 words
The apparatus of claim 17, wherein said first monitoring means comprises: current detection means for generating a current distribution signal in response to sensing the distribution of current to said selected electrical load and a current interruption signal in response to sensing the interruption of current to said selected electrical load; and first signal generating means for generating a first signal having a first period in response to said current distribution signal and a second signal having a second period in response to said current interruption signal.
Claim 22
Dependent Claim 98 words
The apparatus of claim 19, wherein said second monitoring means comprises: control operation detection means for generating a load removal signal in response to said switching means operating to remove said selected electrical load from said electrical distribution network and a load insertion signal in response to said switching means operating to insert said selected electrical load in said electrical distribution network; and second signal generating means for generating a third signal having a third period in response to said load removal signal and a fourth signal having a fourth period in response to said load insertion signal.
Claim 23
Dependent Claim 88 words
The apparatus of claim 20, wherein said recording means comprises a first storage means and a second storage means, said first storage means for storing said first signal and said second signal during each of said plurality of said predetermined time intervals to produce said plurality of said stored electrical load data packets and said second storage means for storing said third signal and said fourth signal during each of said plurality of said predetermined time intervals to produce said plurality of said stored electrical load control packets.
Claim 24
Dependent Claim 46 words
The apparatus of claim 21, wherein each of said plurality of said stored electrical load control data packets and each of said plurality of said electrical load data packets includes timing data indicating the relative time for the start of each of said predetermined time intervals.
Claim 25
Dependent Claim 25 words
The apparatus of claim 22, wherein each of said first signal, said second signal, said third signal, and said fourth signal is a pulsed signal.
Claim 26
Dependent Claim 25 words
The apparatus of claim 23, wherein said first period is equal to said third period and said second period is equal to said fourth period.
Claim 27
Dependent Claim 61 words
The apparatus of claim 24, wherein said data processing center determines a "LOAD ON" time interval indicating the length of time that energy is supplied to said selected electrical load by said electrical distribution network within a selected predetermined time interval by multiplying the total pulse count of said first signal within said selected predetermined time interval by said first period.
Claim 28
Dependent Claim 64 words
The apparatus of claim 23, wherein said data processing center determines a "CONTROL OPERATION ON" time interval indicating the length of time that said selected electrical load is removed by said control means from said electrical distribution network within a selected predetermined time interval by multiplying the total pulse count of said third signal within said selected predetermined time interval by said third period.
Claim 29
Dependent Claim 14 words
The apparatus of claim 22, wherein said communicating means includes a wireless communications system.
Claim 30
Dependent Claim 18 words
The apparatus of claim 22, wherein said communicating means includes a modem interface connected to a telephone system.
Claim 31
Dependent Claim 58 words
The apparatus of claim 28, wherein said telephone system comprises an existing telephone line mounted proximate to said selected electrical load, said telephone line also utilized for other communication applications other than communicating said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to said data processing center.
Claim 32
Dependent Claim 30 words
The apparatus of claim 29, wherein said communicating means does not interrupt any of said other communication applications utilizing said existing telephone line to communicate with said data processing center.
Claim 33
Dependent Claim 42 words
The apparatus of claim 30, wherein said communicating means transmits said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to said data processing center in response to an internal preprogrammed instruction.
Claim 34
Dependent Claim 48 words
The apparatus of claim 30, wherein said communicating means transmits said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to said data processing center in response to a coded instruction signal transmitted by said data processing center.
Claim 35
Dependent Claim 35 words
The apparatus of claim 32, wherein each of said coded instruction signals comprises instruction address data and instruction command data, said communicating means being responsive to said instruction command data only for predetermined address data.
Claim 36
Dependent Claim 31 words
The apparatus of claim 16, comprising a computing means for processing said plurality of said stored electrical load reduction data packets and said plurality of said stored electrical load data packets.
Claim 37
Dependent Claim 61 words
The apparatus of claim 34, wherein said computing means is operative to calculate a LOAD ON/LOAD OFF ratio representing the ratio of a time interval that said energy is supplied to said selected electrical load within a selected predetermined time interval to a time interval that said energy is interrupted to said selected electrical load within said selected predetermined time interval.
Claim 38
Dependent Claim 65 words
The apparatus of claim 35, wherein said computing means is operative to calculate a CONTROL ON/CONTROL OFF ratio representing the ratio of a time interval that said selected electrical load is removed from said electrical distribution network within a selected predetermined time interval to a time interval that said selected electrical load is inserted within said electrical distribution network within said selected predetermined time interval.
Claim 39
Dependent Claim 37 words
The apparatus of claim 36, wherein said communicating means transmits said LOAD ON/LOAD OFF ratio and said CONTROL ON/CONTROL OFF ratio to said data processing center for each of a plurality of said selected predetermined time intervals.
Claim 40
Dependent Claim 386 words
In an electrical load management system, said system including means for transmitting coded command signals for causing electrical load reductions from an electrical distribution network and an improved load control switching and monitoring apparatus located proximate to a selected one of a plurality of electrical loads to be controlled, said improved apparatus comprising: a load management receiver for decoding said coded command signals to produce decoded command signals; switching means for removing said selected electrical load from said electrical distribution network in response to a selected one of said decoded command signals and inserting said selected electrical load within said electrical distribution network in response to another one of said decoded command signals; current detection means for generating a current supply signal in response to sensing the distribution of current to said selected electrical load and a current interruption signal in response to sensing the interruption of current to said selected electrical load; control operation means for generating a load removal signal in response to said switching means operating to remove said selected electrical load from said electrical distribution network and a load insertion signal in response to said switching means operating to insert said selected electrical load in said electrical distribution network; first signal generating means for generating a first signal having a first period in response to said current supply signal and a second signal having a second period in response to said current interruption signal; second signal generating means for generating a third signal having a third period in response to said load removal signal and a fourth signal having a fourth period in response to said load insertion signal; first storage means for storing said first signal and said second signal during each of a plurality of predetermined time intervals to produce a plurality of stored electrical load data packets; second storage means for storing said third signal and said fourth signal during each of said plurality of said predetermined time intervals to produce a plurality of stored electrical load control packets; and communicating means for communicating said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to a data processing center remotely located from said selected electrical load in response to a coded instruction signal transmitted by said data processing center.
Claim 41
Dependent Claim 386 words
In an electrical load management system, said system including means for transmitting coded command signals for causing electrical load reductions from an electrical distribution network and an improved load control switching and monitoring apparatus located proximate to a selected one of a plurality of electrical loads to be controlled, said improved apparatus comprising: a load management receiver for decoding said coded command signals to produce decoded command signals; switching means for removing said selected electrical load from said electrical distribution network in response to a selected one of said decoded command signals and inserting said selected electrical load within said electrical distribution network in response to another one of said decoded command signals; current detection means for generating a current supply signal in response to sensing the distribution of current to said selected electrical load and a current interruption signal in response to sensing the interruption of current to said selected electrical load; control operation means for generating a load removal signal in response to said switching means operating to remove said selected electrical load from said electrical distribution network and a load insertion signal in response to said switching means operating to insert said selected electrical load in said electrical distribution network; first signal generating means for generating a first signal having a first period in response to said current supply signal and a second signal having a second period in response to said current interruption signal; second signal generating means for generating a third signal having a third period in response to said load removal signal and a fourth signal having a fourth period in response to said load insertion signal; first storage means for storing said first signal and said second signal during each of a plurality of predetermined time intervals to produce a plurality of stored electrical load data packets; second storage means for storing said third signal and said fourth signal during each of said plurality of said predetermined time intervals to produce a plurality of stored electrical load control packets; and communicating means for communicating said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to a data processing center remotely located from said selected electrical load in response to a coded instruction signal transmitted by said data processing center.
Claim 42
Dependent Claim 46 words
The apparatus of claim 38, wherein each of said plurality of said stored electrical load control data packets and each of said plurality of stored electrical load data packets includes timing data indicating the relative time for the start of each of said predetermined time intervals.
Claim 43
Dependent Claim 18 words
The apparatus of claim 39, wherein said communicating means includes a modem interface connected to a telephone system.
Claim 44
Dependent Claim 58 words
The apparatus of claim 40, wherein said telephone system comprises an existing telephone line located proximate to said selected electrical load, said telephone line also utilized for other communication applications other than communicating said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to said data processing center.
Claim 45
Dependent Claim 37 words
The apparatus of claim 41, wherein said communicating means does not interrupt any of said other communication applications utilizing said existing telephone line to communicate with said data processing center in response to said coded instruction signal.
Claim 46
Dependent Claim 46 words
The apparatus of claim 42, wherein said data processing center processes said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets received from said communicating means to determine the effectiveness of said electrical load management system.
Claim 47
Dependent Claim 24 words
The apparatus claim 43, wherein each of said first signal, said second signal, said third signal, and said fourth signal is a pulsed signal.
Claim 48
Dependent Claim 25 words
The apparatus of claim 44, wherein said first period is equal to said third period and said second period is equal to said fourth period.
Claim 49
Dependent Claim 57 words
The apparatus of claim 44, wherein said data processing center determines a "LOAD ON" time interval indicating the length of time that energy is supplied to said selected electrical load by said electrical distribution network within a selected predetermined time interval by multiplying the total pulse count of said first signal within said selected predetermined time interval.
Claim 50
Dependent Claim 64 words
The apparatus of claim 46, wherein said data processing center determines a "CONTROL OPERATION ON" time interval indicating the length of time that said selected electrical load is removed by said switching means from said electrical distribution network within a selected predetermined time interval by multiplying the total pulse count of said third signal within said selected predetermined time interval by said third period.
Claim 51
Dependent Claim 32 words
The apparatus of claim 38 further comprising a computing means for processing said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets.
Claim 52
Dependent Claim 59 words
The apparatus of claim 48, wherein said computing means calculates a LOAD ON/LOAD OFF ratio representing the ratio of a time interval that said energy is supplied to said selected electrical load within a selected predetermined time interval to a time interval that said energy is not supplied to said selected electrical load within said selected predetermined time interval.
Claim 53
Dependent Claim 62 words
The apparatus of claim 49, wherein said computing means calculates a CONTROL ON/CONTROL OFF ratio representing the ratio of a time interval that said selected electrical load is removed from said electrical distribution network within a selected predetermined time interval to a time interval that said selected electrical load is inserted within said electrical distribution network within said selected predetermined time interval.
Claim 54
Dependent Claim 37 words
The apparatus of claim 50, wherein said communicating means transmits said LOAD ON/LOAD OFF ratio and said CONTROL ON/CONTROL OFF ratio to said data processing center for each of a plurality of said selected predetermined time intervals.
Claim 55
Dependent Claim 39 words
The apparatus of claim 51, wherein said data processing center processes said LOAD ON/LOAD OFF ratio and said CONTROL ON/CONTROL OFF ratio received from each of said communicating means to determine the effectiveness of said electrical load management system.
Claim 56
Dependent Claim 14 words
The apparatus of claim 38, wherein said communicating means comprises a wireless communications system.
Claim 57
Dependent Claim 23 words
The apparatus of claim 38, wherein said control operation detection means comprises a toroid surrounding a conductor connected to said selected electrical load.
Claim 58
Dependent Claim 213 words
In an electrical load management system, a method for controlling load reductions in an electrical distribution network, monitoring said load reductions and a selected one of said plurality of electrical loads to be controlled, comprising the steps: generating electrical load data in response to the distribution and interruption of energy supplied by said electrical distribution network to said selected electrical load; receiving a plurality of command signals from a command center remotely located from said selected electrical load; controlling said selected electrical load in response to a selected one of said plurality of said command signals; generating electrical load control data in response to controlling said selected electrical load; recording said electrical load data and said electrical load control data during a plurality of predetermined time intervals to produce a plurality of stored electrical load data packets and a plurality of stored electrical load control data packets; and communicating said plurality of said stored electrical load data packets and said plurality of said stored electrical load control data packets to a data processing center, said data processing center operative to process said electrical load data and said electrical load control data to determine the effectiveness of said electrical load management system, said data processing center remotely located and separated from said electrical loads.
Claim 59
Dependent Claim 213 words
In an electrical load management system, a method for controlling load reductions in an electrical distribution network, monitoring said load reductions and a selected one of said plurality of electrical loads to be controlled, comprising the steps: generating electrical load data in response to the distribution and interruption of energy supplied by said electrical distribution network to said selected electrical load; receiving a plurality of command signals from a command center remotely located from said selected electrical load; controlling said selected electrical load in response to a selected one of said plurality of said command signals; generating electrical load control data in response to controlling said selected electrical load; recording said electrical load data and said electrical load control data during a plurality of predetermined time intervals to produce a plurality of stored electrical load data packets and a plurality of stored electrical load control data packets; and communicating said plurality of said stored electrical load data packets and said plurality of said stored electrical load control data packets to a data processing center, said data processing center operative to process said electrical load data and said electrical load control data to determine the effectiveness of said electrical load management system, said data processing center remotely located and separated from said electrical loads.
Claim 60
Dependent Claim 46 words
The method of claim 55, wherein said communicating step comprises the step of transmitting said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets in response to an instruction signal transmitted by said data processing center.
Claim 61
Dependent Claim 41 words
The method of claim 56, wherein said data processing center accumulates said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets for a selected set of said plurality of electrical loads.
Claim 62
Dependent Claim 302 words
In an electrical load management system, a method for controlling load reductions in an electrical distribution network, monitoring said load reductions, and monitoring a selected one of a plurality of electrical loads to be controlled, comprising the steps: sensing the distribution or interruption of energy to said selected electrical load; generating a first signal having a first period in response to said sensing the distribution of energy to said selected electrical load; generating a second signal having a second period in response to sensing the interruption of energy to said selected electrical load; receiving a plurality of coded command signals from a command center remotely located from said selected electrical load; removing said selected electrical load in response to one of said plurality of said coded command signals or inserting said selected electrical load in response to another one of said plurality of said coded command signals; detecting the removal of said selected electrical load from said network or the insertion of said electrical load into said network; generating a third signal having a third period in response to detecting the removal of said selected electrical load from said network; generating a fourth signal having a fourth period in response to detecting the insertion of said selected electrical load from said network; recording said first signal and said second signal during each of a plurality of predetermined time intervals to produce a plurality of stored electrical load data packets and recording said third signal and said fourth signal during each of said plurality of predetermined time intervals to produce a plurality of stored electrical load control data packets; and communicating said plurality of said stored electrical load data packets and said plurality of said stored electrical load control data packets to a data processing center remotely located from said selected electrical load.
Claim 63
Dependent Claim 302 words
In an electrical load management system, a method for controlling load reductions in an electrical distribution network, monitoring said load reductions, and monitoring a selected one of a plurality of electrical loads to be controlled, comprising the steps: sensing the distribution or interruption of energy to said selected electrical load; generating a first signal having a first period in response to said sensing the distribution of energy to said selected electrical load; generating a second signal having a second period in response to sensing the interruption of energy to said selected electrical load; receiving a plurality of coded command signals from a command center remotely located from said selected electrical load; removing said selected electrical load in response to one of said plurality of said coded command signals or inserting said selected electrical load in response to another one of said plurality of said coded command signals; detecting the removal of said selected electrical load from said network or the insertion of said electrical load into said network; generating a third signal having a third period in response to detecting the removal of said selected electrical load from said network; generating a fourth signal having a fourth period in response to detecting the insertion of said selected electrical load from said network; recording said first signal and said second signal during each of a plurality of predetermined time intervals to produce a plurality of stored electrical load data packets and recording said third signal and said fourth signal during each of said plurality of predetermined time intervals to produce a plurality of stored electrical load control data packets; and communicating said plurality of said stored electrical load data packets and said plurality of said stored electrical load control data packets to a data processing center remotely located from said selected electrical load.
Claim 64
Dependent Claim 18 words
The method of claim 58, wherein said receiving step comprises the step of decoding said coded command signals.
Claim 65
Dependent Claim 46 words
The method of claim 59, wherein said communicating step comprises the step of transmitting said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets in response to an instruction signal transmitted by said data processing center.
Claim 66
Dependent Claim 41 words
The method of claim 60, wherein said data processing center accumulates said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets for a selected set of said plurality of electrical loads.
Claim 67
Dependent Claim 51 words
The method of claim 61, wherein said data processing center processes said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets for said selected set of said plurality of electrical loads to determine the effectiveness of said electrical load management system.
Claim 68
Dependent Claim 431 words
In an electrical load management system, said system including means for transmitting coded command signals for causing electrical load reductions from an electrical distribution network and an improved load control switching and monitoring apparatus located proximate to each of a plurality of electrical loads to be controlled, said improved apparatus comprising: a load management receiver for decoding said coded command signals to produce decoded command signals; and switching means for removing a selected one of said electrical loads from said electrical distribution network in response to a selected one of said decoded command signals and inserting said selected electrical load within said electrical distribution network in response to another one of said decoded command signals; first monitoring means for producing electrical load data in response to detecting the distribution or interruption of energy to said selected electrical load, said first monitoring means comprising: current detection means for generating a current distribution signal in response to sensing the distribution of current to said selected electrical load and a current interruption signal in response to sensing the interruption of current to said selected electrical load, and first signal generating means for generating a first signal having a first period in response to said current distribution signal and a second signal having a second period in response to said current interruption signal; second monitoring means for producing electrical load control data in response to detecting the operation of said control means to remove said selected electrical load from said electrical distribution network and to insert said selected electrical load from said electrical distribution network, said second monitoring means comprising: control operation detection means for generating a load removal signal in response to said switching means operating to remove said selected electrical load from said electrical distribution network and a load insertion signal in response to said switching means operating to insert said selected electrical load in said electrical distribution network; and second signal generating means for generating a third signal having a third period in response to said load removal signal and a fourth signal having a fourth period in response to said load insertion signal, recording means for recording said electrical load control data and said electrical load data during a plurality of predetermined time intervals to produce a plurality of stored electrical load control data packets and a plurality of stored electrical load data packets; and communicating means for communicating said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to a data processing center remotely located from said selected electrical load.
Claim 69
Dependent Claim 431 words
In an electrical load management system, said system including means for transmitting coded command signals for causing electrical load reductions from an electrical distribution network and an improved load control switching and monitoring apparatus located proximate to each of a plurality of electrical loads to be controlled, said improved apparatus comprising: a load management receiver for decoding said coded command signals to produce decoded command signals; and switching means for removing a selected one of said electrical loads from said electrical distribution network in response to a selected one of said decoded command signals and inserting said selected electrical load within said electrical distribution network in response to another one of said decoded command signals; first monitoring means for producing electrical load data in response to detecting the distribution or interruption of energy to said selected electrical load, said first monitoring means comprising: current detection means for generating a current distribution signal in response to sensing the distribution of current to said selected electrical load and a current interruption signal in response to sensing the interruption of current to said selected electrical load, and first signal generating means for generating a first signal having a first period in response to said current distribution signal and a second signal having a second period in response to said current interruption signal; second monitoring means for producing electrical load control data in response to detecting the operation of said control means to remove said selected electrical load from said electrical distribution network and to insert said selected electrical load from said electrical distribution network, said second monitoring means comprising: control operation detection means for generating a load removal signal in response to said switching means operating to remove said selected electrical load from said electrical distribution network and a load insertion signal in response to said switching means operating to insert said selected electrical load in said electrical distribution network; and second signal generating means for generating a third signal having a third period in response to said load removal signal and a fourth signal having a fourth period in response to said load insertion signal, recording means for recording said electrical load control data and said electrical load data during a plurality of predetermined time intervals to produce a plurality of stored electrical load control data packets and a plurality of stored electrical load data packets; and communicating means for communicating said plurality of said stored electrical load control data packets and said plurality of said stored electrical load data packets to a data processing center remotely located from said selected electrical load.
Claim 70
Dependent Claim 88 words
The apparatus of claim 63, wherein said recording means comprises a first storage means and a second storage means, said first storage means for storing said first signal and said second signal during each of said plurality of said predetermined time intervals to produce said plurality of said stored electrical load data packets and said second storage means for storing said third signal and said fourth signal during each of said plurality of said predetermined time intervals to produce said plurality of said stored electrical load control packets.
Claim 71
Dependent Claim 46 words
The apparatus of claim 64, wherein each of said plurality of said stored electrical load control data packets and each of said plurality of said electrical load data packets includes timing data indicating the relative time for the start of each of said predetermined time intervals.

References Cited (Backward Citations)

US4086434A Cited
US4190800A Cited
US4419665A Cited
US4780910A Cited
US4749992A Cited
US4749992B1 Cited
US4855922A Cited
US4977515A Cited
US5107440A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1999-11-19 2000-05-20 2000-11-19 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2003-11-19 2004-05-20 2004-11-19 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2007-11-19 2008-05-20 2008-11-19 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag