Production progress control method

Assignee: NEC Electronics Corp
•
Filing: 1992-11-12
•
Granted: 1996-06-04
•
Expires: 2012-11-12
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract A production progress control method is for controlling priorities for the progress of production lots among those lots in progress. Each step has a standard working time and each production lot has a processing procedure and a target process period. An expected passage time is calculated for each production lot based on both the standard working time and the target process period and a processing delay process start time is calculated from the difference between the process start time of a current lot in process and the expected target passage time. The highest priority is given to the production lot having the longest processing delay.

Inventors

  • 👤 Masayoshi Inada

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-25 19:03
CPC Classifications
G; G06; G06Q; G06Q10/00; G06Q10/04; Y; Y02; Y02P; Y02P90/00; Y02P90/02

Claims Analysis

Total Claims: 3
Claim 1
Independent Claim 271 words
A method for controlling priorities for the progress of production lots among those lots which are in progress, the method comprising the steps of: forming a standard working time table (a) in which a standard working time for each production step is given; providing, for each of said lots, a sequential production step table (b) in which a plurality of sequential production steps are given, each of said sequential production steps covering a period from a process starting time to a product due-in time; providing, for each of said lots, a process passage-time schedule table which includes a target process period (d) set as a target from said process starting time to said product due-in time, a logical process period (e) which sums up said standard working time for each production step, and a total of marginal time (f) which is calculated by subtracting said logical process period (e) from said target process period, said total of marginal time (f) being divided by the number of the production steps and the resulting divided marginal time being inserted between respective production steps to obtain a target passage time (cc); forming a delay time table (g) in which a delay time is given for each of the lots calculated from a difference between an actual passage time of a current lot in process and said target passage time (cc); providing a priority sequence table (i) in which priorities are given in sequence of delays amount the lots, based on said delay time table; and using said sequence of delays as a factor for priority determination in controlling the progress of the production lots.
Claim 2
Independent Claim 271 words
A method for controlling priorities for the progress of production lots among those lots which are in progress, the method comprising the steps of: forming a standard working time table (a) in which a standard working time for each production step is given; providing, for each of said lots, a sequential production step table (b) in which a plurality of sequential production steps are given, each of said sequential production steps covering a period from a process starting time to a product due-in time; providing, for each of said lots, a process passage-time schedule table which includes a target process period (d) set as a target from said process starting time to said product due-in time, a logical process period (e) which sums up said standard working time for each production step, and a total of marginal time (f) which is calculated by subtracting said logical process period (e) from said target process period, said total of marginal time (f) being divided by the number of the production steps and the resulting divided marginal time being inserted between respective production steps to obtain a target passage time (cc); forming a delay time table (g) in which a delay time is given for each of the lots calculated from a difference between an actual passage time of a current lot in process and said target passage time (cc); providing a priority sequence table (i) in which priorities are given in sequence of delays amount the lots, based on said delay time table; and using said sequence of delays as a factor for priority determination in controlling the progress of the production lots.
Claim 3
Dependent Claim 31 words
A method according to claim 1, in which said marginal time in said process passage-time schedule table is calculated by taking into consideration change-over and stand-by times between respective production steps.

References Cited (Backward Citations)

US4958292A Cited
US5164905A Cited
US5255181A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1999-06-04 1999-12-04 2000-06-04 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2003-06-04 2003-12-04 2004-06-04 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2007-06-04 2007-12-04 2008-06-04 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag