US5511038A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Process and device for detecting seismic signals in order to obtain vertical seismic profiles during bore drilling operations
Assignee: Agip SpA
•
Filing: 1994-02-03
•
Granted: 1996-04-23
•
Expires: 2014-02-03
Abstract
Abstract A process for preparing vertical seismic profiles (VSP) by bore drilling using, as the seismic source, the vibrations generated by the drilling bit. A cross-correlation between the bit signal and the signals collected by seismic geophone lines, is determined in which the bit signal is processed by arranging a plurality of several types of detectors on the bore drilling facility. A plurality of traces are recorded, in which the signal/noise components have different characteristics. These can be separated by means introducing filter functions by operating either on their Fourier Transforms or on the basis of their statistic distribution.
Inventors
- 👤 Giampiero Angeleri
- 👤 Sergio Persoglia
- 👤 Flavio Poletto
- 👤 Fabio Rocca
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-29 14:23
CPC Classifications
G; G01; G01V; G01V1/00; G01V1/40; G01V1/42; G01V2210/00; G01V2210/10; G01V2210/16; G01V2210/161
Claims Analysis
Total Claims: 4
Claim 1
Independent Claim
172 words
A process for determining seismic profiles of underground geologic formations by well bore drilling, wherein the vibrations of the drilling comprise a seismic source and having a plurality of receivers of various types arranged about the seismic source for receiving the vibrations and forming seismic lines with the seismic source, wherein the process comprises: a) generating a signal by the drilling; b) receiving and analyzing said signal along the seismic lines by the plurality of receivers of various types and thereby receiving a plurality of signal traces, wherein said signal traces of each type of receiver have different characteristics; and c) processing said plurality of different received signal traces by transforming the frequency domain of said received signal traces, aligning said received signal traces in time, and filtering said received signal traces by multiplying, frequency by frequency, the spectra of the received signal traces according to the expression: ##EQU5## wherein, Pj(w) represents a signal trace; and wherein the values Pj(w) are combined thereby determining the seismic profile of an underground geologic formation.
Claim 2
Dependent Claim
172 words
A process for determining seismic profiles of underground geologic formations by well bore drilling, wherein the vibrations of the drilling comprise a seismic source and having a plurality of receivers of various types arranged about the seismic source for receiving the vibrations and forming seismic lines with the seismic source, wherein the process comprises: a) generating a signal by the drilling; b) receiving and analyzing said signal along the seismic lines by the plurality of receivers of various types and thereby receiving a plurality of signal traces, wherein said signal traces of each type of receiver have different characteristics; and c) processing said plurality of different received signal traces by transforming the frequency domain of said received signal traces, aligning said received signal traces in time, and filtering said received signal traces by multiplying, frequency by frequency, the spectra of the received signal traces according to the expression: ##EQU5## wherein, Pj(w) represents a signal trace; and wherein the values Pj(w) are combined thereby determining the seismic profile of an underground geologic formation.
Claim 3
Dependent Claim
53 words
The process of claim 1, wherein received the signal traces P 1 , P 2 , . . . P n are treated as stochastic variables by applying coefficients thereto, thereby obtaining non-correlated combinations perpendicular to each other, and checking their statistical independence by decomposing the received signal traces into statistically independent events.
Claim 4
Dependent Claim
65 words
The process of claim 2 wherein each of said statistically independent events are separated into impulse events and uniform character events by using the fourth momentum divided by the square of the second momentum of the variable, thereby indicating the presence of isolated peaks, wherein each of said statistically independent events are separated by imposing maximalkurtosis or minimalkurtosis conditions thereby separating the received signal traces.
References Cited (Backward Citations)
US3860902A
Cited
US4849945A
Cited
US4964087A
Cited
US4926391A
Cited
US5191557A
Cited
US5148407A
Cited
US4862423A
Cited
US5050130A
Cited
US4954998A
Cited
US4965774A
Cited
US5012453A
Cited
US5151882A
Cited
US5109947A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1999-04-23 | 1999-10-23 | 2000-04-23 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2003-04-23 | 2003-10-23 | 2004-04-23 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2007-04-23 | 2007-10-23 | 2008-04-23 | $7700.00 | Window Closed / Lapsed |