Claims Analysis
Total Claims: 8
Claim 1
Independent Claim
216 words
A train integrity detection system for sensing faults in a brake pipe traversing the length of a train, comprising: a locomotive cab unit positioned at the head-end of a train, said locomotive cab unit comprising a first transceiver and a first brake pipe pressure sensor for sensing a brake application, said locomotive cab unit including a timer which is started when said first brake pipe pressure sensor senses a brake application, said timer defining a predetermined time duration; an end-of-train unit for monitoring brake pipe pressure at a rear-end of the train, said end-of-train unit comprising a second transceiver in radio communication with said first transceiver and a second brake pipe pressure sensor for sensing a reduction in pressure due to a brake application, said end-of-train unit transmitting a radio signal to said locomotive cab unit when a reduction in brake pipe pressure is sensed by said second brake pipe pressure sensor to communicate a brake pipe pressure change; reset means at said locomotive cab unit for resetting said timer upon receipt of said radio signal transmitted by said end-of-train unit; and alarm means at said locomotive cab unit for notifying an engineer that said timer has timed out without being reset during said predetermined time duration thereby indicating that a failure in the train integrity.
Claim 2
Dependent Claim
216 words
A train integrity detection system for sensing faults in a brake pipe traversing the length of a train, comprising: a locomotive cab unit positioned at the head-end of a train, said locomotive cab unit comprising a first transceiver and a first brake pipe pressure sensor for sensing a brake application, said locomotive cab unit including a timer which is started when said first brake pipe pressure sensor senses a brake application, said timer defining a predetermined time duration; an end-of-train unit for monitoring brake pipe pressure at a rear-end of the train, said end-of-train unit comprising a second transceiver in radio communication with said first transceiver and a second brake pipe pressure sensor for sensing a reduction in pressure due to a brake application, said end-of-train unit transmitting a radio signal to said locomotive cab unit when a reduction in brake pipe pressure is sensed by said second brake pipe pressure sensor to communicate a brake pipe pressure change; reset means at said locomotive cab unit for resetting said timer upon receipt of said radio signal transmitted by said end-of-train unit; and alarm means at said locomotive cab unit for notifying an engineer that said timer has timed out without being reset during said predetermined time duration thereby indicating that a failure in the train integrity.
Claim 3
Dependent Claim
101 words
The train integrity detection system recited in claim 1 wherein said alarm means comprises: means for causing said locomotive cab unit to interrogate said end-of-train unit if said end-of-train unit fails to transmit said radio signal communicating a brake pipe pressure change in response to a brake application within said predetermined time duration defined by said timer; a communications fault alarm connected to said locomotive cab unit which is activated if said end-of-train unit fails to reply when interrogated; and a brake pipe integrity alarm connected to said locomotive cab unit which is activated if said end-of-train unit replies when interrogated.
Claim 4
Dependent Claim
50 words
The train integrity detection system recited in claim 2 further comprising: means for inputting to the locomotive cab unit a length of the train to calculate a pressure propagation time; and means for establishing the predetermined time duration defined by said timer as a function of said pressure propagation time.
Claim 5
Independent Claim
128 words
A method sensing faults in a brake pipe traversing a length of a train comprising the steps of: sensing at a head of the train an application of brakes as a reduction of pressure of the brake pipe; starting a timer upon sensing an application of brakes, said timer defining a predetermined time duration; monitoring brake pipe pressure at an end of the train; transmitting a radio signal from the end of the train to the head of the train when a change in monitored brake pipe pressure is detected; resetting said timer upon receipt of said radio signal; and actuating an alarm to notify an engineer the timer has timed out without being reset during said predetermined time duration thereby indicating a failure in the train integrity.
Claim 6
Independent Claim
128 words
A method sensing faults in a brake pipe traversing a length of a train comprising the steps of: sensing at a head of the train an application of brakes as a reduction of pressure of the brake pipe; starting a timer upon sensing an application of brakes, said timer defining a predetermined time duration; monitoring brake pipe pressure at an end of the train; transmitting a radio signal from the end of the train to the head of the train when a change in monitored brake pipe pressure is detected; resetting said timer upon receipt of said radio signal; and actuating an alarm to notify an engineer the timer has timed out without being reset during said predetermined time duration thereby indicating a failure in the train integrity.
Claim 7
Dependent Claim
70 words
The method recited in claim 4 wherein the step of actuating an alarm comprises the steps of: interrogating the end of the train if the timer is not reset within the predetermined time duration defined by said timer; activating a communications fault alarm if the end of the train fails to reply when interrogated; and activating a brake pipe integrity alarm if said end of the train replies when interrogated.
Claim 8
Dependent Claim
46 words
The method recited in claim 5 further comprising the steps of: inputting to the locomotive cab unit a length of the train to calculate a pressure propagation time; and establishing the predetermined time duration defined by said timer as a function of said pressure propagation time.