← Back to Patent Explorer
US5504753A Expired / Lapsed US ⏱️ 0.0 years remaining

Control method for a testing system

Assignee: Siemens AG
•
Filing: 1993-07-21
•
Granted: 1996-04-02
•
Expires: 2013-07-21
📄 Original PDF 🌐 Google Patents 🔄 Sync Now

Abstract

Abstract For control of a testing system, a test module control program module (TUC) arranged on a line trunk group (LTG) in a process-controlled telecommunications system (K) is connected to a unit under test (TA, TS, TL . . . ) via a testing unit (TU) subdivided into test modules (FTEM, LMEM, LVMM) and implements testing procedures. The line-oriented test module control program module (TUC) initiated by a central control program module (TLFI) controls the routines to be implemented at the testing system for seizing and releasing the testing unit (TU). The test module control program module (TUC) is entered into every device memory table (DPS) belonging to the testing unit (TU) and, when called in, respectively implements a specific test procedure. In the execution phase, the test module control program module (TUC) remains in a defined status. The test routines are implemented and monitored without active participation of the test module control program module (TUC). During the seizure and release phases, the test module control program module (TUC) passes through specific (intermediate) statuses, whereby the DPS status entries of the respectively passive programs are updated at the end.

Inventors

  • 👤 Wolfgang Renger
  • 👤 Richard Waldhauser

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-11-01 18:11
CPC Classifications
H; H04; H04M; H04M3/00; H04M3/22; H04M3/26; H04M3/28; H04M3/30; H04Q; H04Q11/00; H04Q11/04; H04Q11/0407; H04Q11/0414

Claims Analysis

Total Claims: 15
Claim 1
Independent Claim 164 words
A control method for a testing system in a processor-controlled telecommunications system, comprising the steps of: arranging at least one central control program module in a group processor of a line trunk group and connecting via a testing unit, subdivided into test modules, to a unit under test; providing device memory tables in the line trunk group, the device memory tables being associated with the test modules; initiating a line-oriented test module control program module by the central control program module; entering the test module control program module into each of the device memory tables; storing data generated by the test modules in the device memory tables, said stored data in the device memory tables also being accessable by the group processor for executing switching-oriented and test-oriented procedures; and updating by means of the test module control program module in the initiating step a respective current program status in the device memory tables of the test modules after a conclusion of a testing routine.
Claim 2
Dependent Claim 164 words
A control method for a testing system in a processor-controlled telecommunications system, comprising the steps of: arranging at least one central control program module in a group processor of a line trunk group and connecting via a testing unit, subdivided into test modules, to a unit under test; providing device memory tables in the line trunk group, the device memory tables being associated with the test modules; initiating a line-oriented test module control program module by the central control program module; entering the test module control program module into each of the device memory tables; storing data generated by the test modules in the device memory tables, said stored data in the device memory tables also being accessable by the group processor for executing switching-oriented and test-oriented procedures; and updating by means of the test module control program module in the initiating step a respective current program status in the device memory tables of the test modules after a conclusion of a testing routine.
Claim 3
Dependent Claim 36 words
The control method according to claim 1, wherein the method further comprises the test module control program module communicating with the test modules arranged on the line trunk group, and initiating and implementing corresponding test procedures.
Claim 4
Dependent Claim 25 words
The control method according to claim 1, wherein the method further comprises time-monitoring the test module control program module by the central control program module.
Claim 5
Dependent Claim 22 words
The control method according to claim 1, wherein the method further comprises implementing individual test jobs that are controlled in state-event fashion.
Claim 6
Dependent Claim 20 words
The control method according to claim 1, wherein the device memory tables belonging to the testing unit are updatable memories.
Claim 7
Dependent Claim 188 words
A control method for a testing system in a processor-controlled telecommunications system, comprising the steps of: arranging at least one central control program module in a group processor of a line trunk group and connecting via a testing unit, subdivided into test modules, to a unit under test; providing device memory tables in the line trunk group, the device memory tables being associated with the test modules; initiating a line-oriented test module control program module by the central control program module, the test module control program module communicating with the test modules arranged on the line trunk group, and initiating and implementing corresponding test procedures; entering the test module control program module into each of the device memory tables; storing data generated by the test modules in the device memory tables, said stored data in the device memory tables also being accessable by the group processor for executing switching-oriented and test-oriented procedures; and updating by means of the test module control program module in the initiating step a respective current program status in the device memory tables of the test modules after a conclusion of a testing routine.
Claim 8
Dependent Claim 188 words
A control method for a testing system in a processor-controlled telecommunications system, comprising the steps of: arranging at least one central control program module in a group processor of a line trunk group and connecting via a testing unit, subdivided into test modules, to a unit under test; providing device memory tables in the line trunk group, the device memory tables being associated with the test modules; initiating a line-oriented test module control program module by the central control program module, the test module control program module communicating with the test modules arranged on the line trunk group, and initiating and implementing corresponding test procedures; entering the test module control program module into each of the device memory tables; storing data generated by the test modules in the device memory tables, said stored data in the device memory tables also being accessable by the group processor for executing switching-oriented and test-oriented procedures; and updating by means of the test module control program module in the initiating step a respective current program status in the device memory tables of the test modules after a conclusion of a testing routine.
Claim 9
Dependent Claim 25 words
The control method according to claim 6, wherein the method further comprises time-monitoring the test module control program module by the central control program module.
Claim 10
Dependent Claim 22 words
The control method according to claim 6, wherein the method further comprises implementing individual test jobs that are controlled in state-event fashion.
Claim 11
Dependent Claim 20 words
The control method according to claim 6, wherein the device memory tables belonging to the testing unit are updatable memories.
Claim 12
Dependent Claim 186 words
A control method for a testing system in a processor-controlled telecommunications system, comprising the steps of: arranging at least one central control program module in a group processor of a line trunk group and connecting via a testing unit, subdivided into test modules, to a unit under test; providing device memory tables in the line trunk group, the device memory tables being associated with the test modules; initiating a line-oriented test module control program module by the central control program module; entering the test module control program module into each of the device memory tables, the device memory tables being updatable memories; storing data generated by the test modules in the device memory tables, said stored data in the device memory tables also being accessable by the group processor for executing switching-oriented and test-oriented procedures; and updating by means of the test module control program module in the initiating step a respective current program status in the device memory tables of the test modules after a conclusion of a testing routine; wherein a plurality of individual test jobs are implemented and are controlled in state-event fashion.
Claim 13
Dependent Claim 186 words
A control method for a testing system in a processor-controlled telecommunications system, comprising the steps of: arranging at least one central control program module in a group processor of a line trunk group and connecting via a testing unit, subdivided into test modules, to a unit under test; providing device memory tables in the line trunk group, the device memory tables being associated with the test modules; initiating a line-oriented test module control program module by the central control program module; entering the test module control program module into each of the device memory tables, the device memory tables being updatable memories; storing data generated by the test modules in the device memory tables, said stored data in the device memory tables also being accessable by the group processor for executing switching-oriented and test-oriented procedures; and updating by means of the test module control program module in the initiating step a respective current program status in the device memory tables of the test modules after a conclusion of a testing routine; wherein a plurality of individual test jobs are implemented and are controlled in state-event fashion.
Claim 14
Dependent Claim 36 words
The control method according to claim 10, wherein the method further comprises the test module control program module communicating with the test modules arranged on the line trunk group, and initiating and implementing corresponding test procedures.
Claim 15
Dependent Claim 25 words
The control method according to claim 10, wherein the method further comprises time-monitoring the test module control program module by the central control program module.

References Cited (Backward Citations)

US4484030A Cited
US4581493A Cited
US4611320A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1999-04-02 1999-10-02 2000-04-02 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2003-04-02 2003-10-02 2004-04-02 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2007-04-02 2007-10-02 2008-04-02 $7700.00 Window Closed / Lapsed

Assigned Categories & Tags

No categories assigned to this patent yet.

Assign Category Tag