Claim 1
Independent Claim
88 words
A method for predicting an endpoint time of a semiconductor process at which a thickness of a target layer of a wafer occurs, the method comprising the steps of: receiving an actual thickness sample of the layer calculated at a first sample time; determining whether or not the thickness sample is valid; updating a forecasted process rate using the thickness sample if the thickness sample is valid; predicting the endpoint time from the forecasted process rate; and controlling the process to generate the layer having the desired thickness.
Claim 2
Independent Claim
88 words
A method for predicting an endpoint time of a semiconductor process at which a thickness of a target layer of a wafer occurs, the method comprising the steps of: receiving an actual thickness sample of the layer calculated at a first sample time; determining whether or not the thickness sample is valid; updating a forecasted process rate using the thickness sample if the thickness sample is valid; predicting the endpoint time from the forecasted process rate; and controlling the process to generate the layer having the desired thickness.
Claim 3
Dependent Claim
59 words
The method of claim 1 wherein the step of determining comprises the steps of: receiving a figure of merit calculated at the first sample time; comparing the figure of merit to an acceptable figure of merit; determining that the thickness sample is valid if the figure of merit is less than or equal to the acceptable figure of merit.
Claim 4
Dependent Claim
142 words
The method of claim 1 wherein the step of determining comprises the steps of: calculating a predicted layer thickness at the first sample time from a prior forecasted process rate calculated at a prior sample time; generating a difference between the predicted layer thickness and the thickness sample; determining from the difference a moving average residual at the first sample time; calculating from the difference a moving absolute deviation at the first sample time; calculating a normalized residual from the difference, a prior moving average residual and a prior moving absolute deviation, wherein both the prior moving average residual and the prior moving absolute deviation are calculated for the prior sample time; comparing the normalized residual to a predetermined cutoff; and determining the thickness sample is within the predetermined range if the normalized residual is less than or equal to the cutoff.
Claim 5
Dependent Claim
54 words
The method of claim 1 wherein the step of determining comprises the steps of: calculating a raw process rate; comparing the raw process rate to minimum and maximum process rates; and determining that the thickness sample is within the predetermined range if the raw process rate is between the minimum and maximum process rates.
Claim 6
Dependent Claim
48 words
The method of claim 1 wherein the step of predicting further comprises the steps of: determining whether the endpoint time will occur within a predetermined interpolation time from the first sample time; and predicting the endpoint time if the endpoint time will occur within said predetermined interpolation time.
Claim 7
Independent Claim
98 words
A method for predicting an endpoint time of a semiconductor process at which a thickness of a target layer of a wafer occurs, the semiconductor process occurring in a chamber, the method comprising the steps of: receiving an actual thickness sample of the thickness of the layer and a figure of merit calculated for a first sample time; determining from the figure of merit whether the actual thickness sample is valid; updating a forecasted process rate using the actual thickness sample if the actual thickness sample is valid; and predicting the endpoint time from the forecasted process rate.
Claim 8
Independent Claim
98 words
A method for predicting an endpoint time of a semiconductor process at which a thickness of a target layer of a wafer occurs, the semiconductor process occurring in a chamber, the method comprising the steps of: receiving an actual thickness sample of the thickness of the layer and a figure of merit calculated for a first sample time; determining from the figure of merit whether the actual thickness sample is valid; updating a forecasted process rate using the actual thickness sample if the actual thickness sample is valid; and predicting the endpoint time from the forecasted process rate.
Claim 9
Dependent Claim
49 words
The method of claim 6 wherein the step of determining comprises the steps of: comparing the figure of merit to an acceptable figure of merit; determining that the actual thickness sample is valid if the figure of merit is less than or equal to the acceptable figure of merit.
Claim 10
Dependent Claim
191 words
The method of claim 6 wherein the step of determining comprises the steps of: comparing the figure of merit to an acceptable figure of merit; determining that the actual thickness sample is valid if the figure of merit is greater than the acceptable figure of merit; if the figure of merit is less than or equal to the acceptable figure of merit, calculating a predicted thickness sample of the layer at the first sample time from a prior forecasted process rate calculated at a prior sample time; calculating a difference between the predicted thickness sample and the actual thickness sample; calculating from the difference a moving average residual at the first sample time; calculating from the difference a moving absolute deviation at the first sample time; calculating a normalized residual from the difference, a prior moving average residual and a prior moving absolute deviation, wherein both the prior moving average residual and the prior moving absolute deviation are calculated for the prior sample time; comparing the normalized residual to a cutoff; and determining the actual thickness sample is valid if the normalized residual is less than or equal to the cutoff.
Claim 11
Dependent Claim
104 words
The method of claim 6 wherein the step of determining comprises the steps of: comparing the figure of merit to an acceptable figure of merit; determining that the actual thickness sample is invalid if the figure of merit is greater than the acceptable figure of merit; if the figure of merit is less than or equal to the acceptable figure of merit, calculating a raw process rate; comparing the raw process rate to a minimum process rate and a maximum process rate; and determining the actual thickness sample is valid if the raw process rate is between the minimum and the maximum process rates.
Claim 12
Dependent Claim
63 words
The method of claim 6 further comprising the steps of: receiving a prior figure of merit calculated for a prior sample time occurring before the process has started; comparing the prior figure of merit to an acceptable figure of merit; determining the wafer meets preprocessing tolerances if the prior figure of merit is less than or equal to the acceptable figure of merit.
Claim 13
Dependent Claim
66 words
The method of claim 6 further comprising the steps of: receiving a prior figure of merit calculated for a prior sample time occurring before the process has started; comparing the prior figure of merit to an acceptable figure of merit; determining the wafer is properly positioned in the chamber if the prior figure of merit is less than or equal to the acceptable figure of merit.
Claim 14
Independent Claim
100 words
A method for predicting an endpoint time at which a thickness of a target layer of a wafer under process occurs, comprising the steps of: receiving an actual layer thickness sample of the layer calculated for a first sample time; determining if the actual layer thickness sample is valid using Holt's method; updating a forecasted process rate with the actual layer thickness sample using a Holt filter if the actual layer thickness sample is valid; predicting the endpoint time from the forecasted process rate; and controlling the process, using the endpoint time, to produce the layer at the desired thickness.
Claim 15
Independent Claim
100 words
A method for predicting an endpoint time at which a thickness of a target layer of a wafer under process occurs, comprising the steps of: receiving an actual layer thickness sample of the layer calculated for a first sample time; determining if the actual layer thickness sample is valid using Holt's method; updating a forecasted process rate with the actual layer thickness sample using a Holt filter if the actual layer thickness sample is valid; predicting the endpoint time from the forecasted process rate; and controlling the process, using the endpoint time, to produce the layer at the desired thickness.
Claim 16
Dependent Claim
143 words
The method of claim 12 wherein the step of determining comprises the steps of: calculating a predicted layer thickness sample at the first sample time from a prior forecasted process rate calculated at a prior sample time; calculating a difference between the predicted layer thickness sample and the actual layer thickness sample; calculating a moving average residual, at the first sample time, from the difference; calculating a moving absolute deviation, at the first sample time, from the difference; calculating a normalized residual from the difference, a prior moving average residual and a prior moving absolute deviation, wherein both the prior moving average residual and the prior moving absolute deviation are calculated for the prior sample time; comparing the normalized residual to a cutoff; determining the actual layer thickness sample is valid if the normalized residual is less than or equal to the cutoff.
Claim 17
Dependent Claim
69 words
The method of claim 12 wherein the step of updating the forecasted process rate comprises the steps of: calculating a raw process rate; calculating a filtered process rate from the raw process rate and a prior forecasted process rate; calculating a process rate trend from the filtered process rate; and setting the forecasted process rate equal to a sum of the filtered process rate and the process rate trend.
Claim 18
Dependent Claim
25 words
The method of claim 12 further comprising the step of setting the filtered process rate equal to an initial process rate before the process begins.
Claim 19
Dependent Claim
131 words
The method of claim 12 wherein the steps of updating and predicting comprise the steps of: calculating a raw process rate; calculating a filtered process rate from the raw process rate and a prior forecasted process rate; calculating a process rate trend from the filtered process rate; setting the forecasted process rate equal to a sum of the filtered process rate and the process rate trend; calculating a predicted layer thickness sample at the first sample time; conjugating the filtered process rate with the first sample time to generate a conjugation; generating a first difference between the predicted layer thickness sample and the conjugation; generating a second difference between the first difference and the predetermined thickness; and dividing the second difference by the forecasted process rate to generate the endpoint time.
Claim 20
Independent Claim
123 words
A method for predicting an endpoint time at which a desired thickness of a target layer of a wafer under process occurs, comprising the steps of: receiving an actual layer thickness calculated by a processor for a first sample time; calculating a raw process rate; comparing the raw process rate to a minimum process rate and a maximum process rate; determining the actual layer thickness is valid if the raw process rate is between the minimum and the maximum process rates; updating a forecasted process rate with the actual layer thickness if the actual layer thickness is valid; predicting the endpoint time from the forecasted process rate; and controlling the process, using the endpoint time, to produce the layer at the desired thickness.
Claim 21
Independent Claim
123 words
A method for predicting an endpoint time at which a desired thickness of a target layer of a wafer under process occurs, comprising the steps of: receiving an actual layer thickness calculated by a processor for a first sample time; calculating a raw process rate; comparing the raw process rate to a minimum process rate and a maximum process rate; determining the actual layer thickness is valid if the raw process rate is between the minimum and the maximum process rates; updating a forecasted process rate with the actual layer thickness if the actual layer thickness is valid; predicting the endpoint time from the forecasted process rate; and controlling the process, using the endpoint time, to produce the layer at the desired thickness.
Claim 22
Dependent Claim
32 words
The method of claim 17 wherein the step of updating comprises the steps of: updating a shifting window with the raw process rate; computing the forecasted process rate from the shifting window.
Claim 23
Dependent Claim
66 words
The method of claim 17 wherein the step of predicting comprises the steps of: generating a conjugation between the forecasted process rate and the first sample time; computing a first difference between the actual layer thickness and the conjugation; generating a second difference between the first difference and the desired thickness; and dividing the second difference by the forecasted process rate to obtain the endpoint time.
Claim 24
Independent Claim
179 words
A system for controlling a semiconductor process for a wafer within a process chamber and having at least one layer, the system comprising: a generator for generating and transmitting a source signal, having a first set of parameters, toward the wafer and for receiving a reflected signal, having a second set of parameters, from the wafer; a processor in communication with the generator for calculating for a first sample time an actual layer thickness and a figure of merit from a set of differences between the first and second sets of parameters; an endpoint detector in communication with the processor for using the figure of merit to determine if the actual layer thickness is within a predetermined range, for updating a forecasted process rate from the actual layer thickness if the actual layer thickness is within the predetermined range and for predicting an endpoint time from the forecasted process rate; and a controller in communication with the process chamber and the endpoint detector, the controller responsive to the endpoint time for generating control signals for controlling the semiconductor process.
Claim 25
Independent Claim
179 words
A system for controlling a semiconductor process for a wafer within a process chamber and having at least one layer, the system comprising: a generator for generating and transmitting a source signal, having a first set of parameters, toward the wafer and for receiving a reflected signal, having a second set of parameters, from the wafer; a processor in communication with the generator for calculating for a first sample time an actual layer thickness and a figure of merit from a set of differences between the first and second sets of parameters; an endpoint detector in communication with the processor for using the figure of merit to determine if the actual layer thickness is within a predetermined range, for updating a forecasted process rate from the actual layer thickness if the actual layer thickness is within the predetermined range and for predicting an endpoint time from the forecasted process rate; and a controller in communication with the process chamber and the endpoint detector, the controller responsive to the endpoint time for generating control signals for controlling the semiconductor process.
Claim 26
Dependent Claim
194 words
The system of claim 20 further comprising the endpoint detector for: comparing the figure of merit to an acceptable figure of merit; determining that the actual layer thickness is outside of the predetermined range if the figure of merit is greater than the acceptable figure of merit; if the figure of merit is less than or equal to the acceptable figure of merit, calculating a predicted layer thickness at the first sample time from a prior forecasted process rate calculated at a prior sample time; calculating a difference between the predicted layer thickness and the actual layer thickness; calculating from the difference a moving average residual at the first sample time; calculating from the difference a moving absolute deviation at the first sample time; calculating a normalized residual from the difference, a prior moving average residual and a prior moving absolute deviation, wherein both the prior moving average residual and the prior moving absolute deviation are calculated for the prior sample time; comparing the normalized residual to a predetermined cutoff; and determining the actual layer thickness is within the predetermined range if the normalized residual is less than or equal to the predetermined cutoff.
Claim 27
Dependent Claim
107 words
The system of claim 20 comprising the endpoint detector for comparing the figure of merit to an acceptable figure of merit; determining that the actual layer thickness is outside of the predetermined range if the figure of merit is greater than the acceptable figure of merit; if the figure of merit is less than or equal to the acceptable figure of merit, calculating a raw process rate; comparing the raw process rate to a minimum process rate and a maximum process rate; and determining the actual layer thickness is within the predetermined range if the raw process rate is between the minimum and the maximum process rates.
Claim 28
Dependent Claim
43 words
The system of claim 20 comprising the endpoint detector for determining whether the endpoint time will occur within a predetermined interpolation time from the first sample time; and predicting the endpoint time if the endpoint time will occur within the predetermined interpolation time.
Claim 29
Dependent Claim
48 words
The system of claim 20 further comprising the endpoint detector for comparing the figure of merit to an acceptable figure of merit; and determining that the actual layer thickness is outside of the predetermined range of the figure of merit is greater than the acceptable figure of merit.