US5483797A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Method of and apparatus for controlling the operation of a valve that regulates the flow of geothermal fluid
Assignee: Ormat Technologies Inc
•
Filing: 1993-06-24
•
Granted: 1996-01-16
•
Expires: 2013-06-24
Abstract
Abstract The present invention provides a method of and apparatus for controlling the operation of a valve that regulates the flow of geothermal fluid that comprises geothermal brine and steam flowing through the valve to a geothermal plant. The method includes determining the maximum permitted value of at least one parameter or quantity affecting the operation of the geothermal plant, and setting a predetermined value for the at least one quantity which is less than the maximum value of the quantity. The flow of fluid through the valve is reduced when the value of said at least one quantity reaches its preset value for maintaining the operation of the geothermal plant.
Inventors
- 👤 Meir Rigal
- 👤 Amir Karas
- 👤 Aba Nathan
- 👤 Yechiel Rifner
- 👤 Naday Amir
- 👤 Lucien Y. Bronicki
- 👤 Moshe Grassianni
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-10-27 17:54
CPC Classifications
F; F01; F01K; F01K23/00; F01K23/02; F01K23/04; F01D; F01D15/00; F01D15/10; F01K25/00; F01K25/08; F03; F03G; F03G4/00; F03G4/074
Claims Analysis
Total Claims: 15
Claim 1
Independent Claim
138 words
A method for controlling the operation of a valve regulating the flow of geothermal fluid comprising geothermal brine and steam through the valve, said valve supplying the fluid to a geothermal plant, said method comprising the steps of: (a) determining the maximum permitted value of at least one quantity effecting the operation of the geothermal plant; (b) setting a preset value for said at least one quantity less than the maximum value of the quantity; and (c) reducing the flow of fluid through the valve when the value of said at least one quantity reaches its preset value for maintaining the operation of the geothermal plant; and (d) wherein said valve is a pressure control valve positioned at the head of a production well for controlling the flow of geothermal fluid from the well to the geothermal plant.
Claim 2
Independent Claim
138 words
A method for controlling the operation of a valve regulating the flow of geothermal fluid comprising geothermal brine and steam through the valve, said valve supplying the fluid to a geothermal plant, said method comprising the steps of: (a) determining the maximum permitted value of at least one quantity effecting the operation of the geothermal plant; (b) setting a preset value for said at least one quantity less than the maximum value of the quantity; and (c) reducing the flow of fluid through the valve when the value of said at least one quantity reaches its preset value for maintaining the operation of the geothermal plant; and (d) wherein said valve is a pressure control valve positioned at the head of a production well for controlling the flow of geothermal fluid from the well to the geothermal plant.
Claim 3
Independent Claim
125 words
A method for controlling the operation of a valve regulating the flow of geothermal fluid comprising geothermal brine and steam through the valve, said valve supplying the fluid to a geothermal plant, said method comprising the steps of: (a) determining the maximum permitted value of at least one quantity effecting the operation of the geothermal plant; (b) setting preset value for said at least one quantity less than the maximum value of the quantity; and (c) reducing the flow of fluid through the valve when the value or said at least one quantity reaches its preset value for maintaining the operation of the geothermal plant; and (d) including separating the geothermal fluid into geothermal brine and steam and supplying the steam to said geothermal plant.
Claim 4
Independent Claim
125 words
A method for controlling the operation of a valve regulating the flow of geothermal fluid comprising geothermal brine and steam through the valve, said valve supplying the fluid to a geothermal plant, said method comprising the steps of: (a) determining the maximum permitted value of at least one quantity effecting the operation of the geothermal plant; (b) setting preset value for said at least one quantity less than the maximum value of the quantity; and (c) reducing the flow of fluid through the valve when the value or said at least one quantity reaches its preset value for maintaining the operation of the geothermal plant; and (d) including separating the geothermal fluid into geothermal brine and steam and supplying the steam to said geothermal plant.
Claim 5
Dependent Claim
23 words
A method according to claim 2 wherein said quantity is the pressure of the geothermal steam at the input into the geothermal plant.
Claim 6
Independent Claim
127 words
A method for controlling the operation of a valve regulating the flow of geothermal fluid comprising geothermal brine and steam through the valve, said valve supplying the fluid to a geothermal plant, said method comprising the steps of: (a) determining the maximum permitted value of at least one quantity effecting the operation of the geothermal plant; (b) setting preset value for said at least one quantity less than the maximum value of the quantity; and (c) reducing the flow of fluid through the valve when the value of said at least one quantity reaches its preset value for maintaining the operation of the geothermal plant; and (d) wherein said quantity is the pressure of the geothermal fluid at an injection well where the geothermal fluid is injected.
Claim 7
Independent Claim
127 words
A method for controlling the operation of a valve regulating the flow of geothermal fluid comprising geothermal brine and steam through the valve, said valve supplying the fluid to a geothermal plant, said method comprising the steps of: (a) determining the maximum permitted value of at least one quantity effecting the operation of the geothermal plant; (b) setting preset value for said at least one quantity less than the maximum value of the quantity; and (c) reducing the flow of fluid through the valve when the value of said at least one quantity reaches its preset value for maintaining the operation of the geothermal plant; and (d) wherein said quantity is the pressure of the geothermal fluid at an injection well where the geothermal fluid is injected.
Claim 8
Dependent Claim
152 words
A geothermal power plant operating on geothermal fluid derived from a production well, said plant comprising: a) a plant pressure control valve for controlling the flow of said fluid from the production well to said geothermal plant; b) a central controller for controlling the setting of said valve; c) means responsive to at least one parameter of said power plant which affects the operation of the power plant for producing a control signal, said parameter having a maximum permitted value; d) means for applying said control signal to said central controller; e) means for applying to said central controller a preset value that represents less than the maximum value of the quantity; and d) said central controller being operational to reduce the flow of fluid through said plant pressure control valve when the value of said at least one parameter reaches its preset value for maintaining the operation of the geothermal plant.
Claim 9
Dependent Claim
152 words
A geothermal power plant operating on geothermal fluid derived from a production well, said plant comprising: a) a plant pressure control valve for controlling the flow of said fluid from the production well to said geothermal plant; b) a central controller for controlling the setting of said valve; c) means responsive to at least one parameter of said power plant which affects the operation of the power plant for producing a control signal, said parameter having a maximum permitted value; d) means for applying said control signal to said central controller; e) means for applying to said central controller a preset value that represents less than the maximum value of the quantity; and d) said central controller being operational to reduce the flow of fluid through said plant pressure control valve when the value of said at least one parameter reaches its preset value for maintaining the operation of the geothermal plant.
Claim 10
Dependent Claim
22 words
A geothermal power plant according to claim 5 wherein said one parameter is the pressure downstream of said plant pressure control valve.
Claim 11
Dependent Claim
37 words
A geothermal power plant according to claim 5 including means for supplying geothermal fluid from said plant to a re-injection well, and wherein said one parameter is the pressure of said geothermal fluid at said re-injection well.
Claim 12
Dependent Claim
142 words
A geothermal power plant according to claim 5 wherein said plant includes a separator for separating said geothermal fluid into steam and brine, a steam turbine responsive to said steam for generating power and producing expanded steam, a heat exchanger containing organic fluid for condensing said expanded steam into condensate and producing vaporized organic fluid, and organic vapor turbine responsive to said vaporized organic fluid for generating power and producing expanded organic vapor, a condenser for condensing said expanded organic vapor into organic liquid, means for returning said organic liquid to said heat exchanger, a steam sensor located between said pressure control valve and said plant for sensing the pressure of said steam, said central controller being operative to reduce the flow of geothermal fluid through said pressure control valve when said steam sensor senses a pressure greater than a predetermined value.
Claim 13
Dependent Claim
63 words
A geothermal power plant according to claim 8 including means for supplying steam condensate and said brine as a mixture to a re-injection well, a mixture sensor for sensing the pressure of said mixture, said central controller being operative to reduce the flow of said steam through said pressure control valve when said mixture sensor senses a pressure greater than a predetermined value.
Claim 14
Dependent Claim
74 words
A geothermal power plant according to claim 8 including a by-pass line in parallel with said steam turbine, and a by-pass valve in said by-pass line for controlling the flow therethrough, and sensors for sensing the back pressure on said steam turbine and said heat exchanger, said central controller being operative to control the operation of said by-pass valve in accordance with the sensed back pressure on said steam turbine and said heat exchanger.
Claim 15
Dependent Claim
72 words
A geothermal power plant according to claim 8 including a by-pass line in parallel with said organic turbine, and a by-pass valve in said by-pass line for controlling the flow therethrough, and sensors for sensing the back pressure on said organic turbine and said condenser, said central controller being operative to control the operation of said by-pass valve in accordance with the sensed back pressure on said organic turbine and said condenser.
References Cited (Backward Citations)
SU188219A1
Cited
SU646070A1
Cited
SU556230A1
Cited
SU585300A1
Cited
SU630441A1
Cited
SU646071A1
Cited
US4249385A
Cited
US4484446A
Cited
SU1101562A2
Cited
US4542625A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1999-01-15 | 1999-07-17 | 2000-01-16 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2003-01-15 | 2003-07-17 | 2004-01-16 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2007-01-15 | 2007-07-17 | 2008-01-16 | $7700.00 | Window Closed / Lapsed |