Abstract

Abstract A system for determining a cost effective and practical operation method for thermal source equipments includes a fundamental plan data storage unit, a fundamental plan generating unit for determining a fundamental operation plan of each equipment while minimizing an operation cost by linear programming, an operation knowledge storage unit for storing operation knowledge such as equipment performance characteristics and operation know-how, a fundamental plan evaluating unit for evaluating the fundamental plan, a modifying rule storage unit for storing modifying rules used for modifying the evaluated fundamental plan, and a fundamental plan modifying unit for modifying the fundamental plan in accordance with the modifying rules.

Inventors

  • 👤 Akihiro Yamada
  • 👤 Makoto Shimoda
  • 👤 Masaji Nakahara
  • 👤 Masahiro Yoshioka

Bibliographic Details

Application Number —
Jurisdiction US
Data Source google_patents
Last Synchronized 2026-10-27 11:29
CPC Classifications
G; G05; G05B; G05B13/00; F; F01; F01K; F01K13/00; F01K13/02; F24; F24D; F24D12/00; F24D12/02; F25; F25D; F25D29/00; H; H01; H01M; H01M8/00; H01M8/04; H01M8/04298; H01M8/04992; F24D10/00; F24D18/00; F24D2101/00; F24D2101/30; F24F; F24F11/00; F24F11/30; F24F11/46; F24F11/47; F24H; F24H2240/00; F24H2240/10; F25D2400/00; F25D2400/36; Y; Y02; Y02B; Y02B30/00; Y02B30/17; Y02E; Y02E20/00; Y02E20/14; Y02E60/00; Y02E60/30; Y02E60/50; Y02P; Y02P80/00; Y02P80/10; Y02P80/14; Y02P80/15; Y10; Y10S; Y10S706/00; Y10S706/902; Y10S706/903; Y10S706/906; Y10S706/907

Claims Analysis

Total Claims: 20
Claim 1
Independent Claim 160 words
A plant operation system comprising: input/output data storage means for storing input/output data of each equipment of a plant having a plurality of different type equipments; fundamental operation plan generating means for generating a fundamental operation plan by reading said input/output data of each said equipment stored in said input/output data storage means and formulating said read input/output data, and by obtaining an input to each said equipment for each operation time period by using an optimal planning method, said input satisfying a target output of said plant; rule storage means for storing knowledge rules regarding at least one of a life time and response characteristic of each said equipment; means for evaluating said fundamental operation plan generated by said fundamental operation generating means by using said knowledge rules; means for storing modifying rules for modifying a start/stop schedule and a load factor of each said equipment; and means for modifying said fundamental operation plan by using said modifying rules.
Claim 2
Dependent Claim 160 words
A plant operation system comprising: input/output data storage means for storing input/output data of each equipment of a plant having a plurality of different type equipments; fundamental operation plan generating means for generating a fundamental operation plan by reading said input/output data of each said equipment stored in said input/output data storage means and formulating said read input/output data, and by obtaining an input to each said equipment for each operation time period by using an optimal planning method, said input satisfying a target output of said plant; rule storage means for storing knowledge rules regarding at least one of a life time and response characteristic of each said equipment; means for evaluating said fundamental operation plan generated by said fundamental operation generating means by using said knowledge rules; means for storing modifying rules for modifying a start/stop schedule and a load factor of each said equipment; and means for modifying said fundamental operation plan by using said modifying rules.
Claim 3
Dependent Claim 154 words
A thermal source equipment operation determining method of determining a start/stop schedule and a running load factor of an energy supply plant having a plurality of different type thermal source equipments, comprising the steps of: formulating a relationship between input and output of each said thermal source equipment and the restrictive conditions of upper and lower bounds of said input and output, and generating said start/stop schedule and said running load factor of each said thermal source equipment by a linear planning method, said start/stop schedule and said running load factor satisfying a target output of said plant and minimizing an energy consumption cost of each said thermal source equipment and/or an exhaust amount of toxic gas to air; and modifying said start/stop schedule and said running load factor of each said thermal source equipment, by using knowledge rules regarding a life time and an output response characteristic of each said thermal source equipment.
Claim 4
Dependent Claim 154 words
A thermal source equipment operation determining method of determining a start/stop schedule and a running load factor of an energy supply plant having a plurality of different type thermal source equipments, comprising the steps of: formulating a relationship between input and output of each said thermal source equipment and the restrictive conditions of upper and lower bounds of said input and output, and generating said start/stop schedule and said running load factor of each said thermal source equipment by a linear planning method, said start/stop schedule and said running load factor satisfying a target output of said plant and minimizing an energy consumption cost of each said thermal source equipment and/or an exhaust amount of toxic gas to air; and modifying said start/stop schedule and said running load factor of each said thermal source equipment, by using knowledge rules regarding a life time and an output response characteristic of each said thermal source equipment.
Claim 5
Dependent Claim 82 words
A thermal source equipment operation determining method according to claim 2, wherein optimization of said start/stop schedule and said running load factor of each said thermal source equipment is evaluated by using said knowledge rules, in accordance with said evaluated results said restrictive conditions used for the execution of said linear planning method are changed, optimization calculation by said linear planning method is again performed, and said start/stop schedule and said running load factor of each said thermal source equipment are modified.
Claim 6
Dependent Claim 110 words
A thermal source equipment operation determining method according to claim 2, wherein as a method of evaluating optimization of said start/stop schedule and said running load factor of each said thermal source equipment, a stop time duration from when each said thermal source equipment is stopped and to when each said thermal source equipment is re-started, a load factor at the time of re-start, and an operation time duration from the time of re-start to the time of re-stop are compared with predetermined respective reference values, and in accordance with the comparison results with said reference values appropriateness of said start/stop schedule of each said thermal source equipment is judged.
Claim 7
Dependent Claim 125 words
A thermal source equipment operation determining method according to claim 2, wherein a steam absorption refrigerator is used as each said thermal source equipment, and as a method of evaluating optimization of and modifying said start/stop schedule and said running load factor of each said thermal source equipment, a dilution operation start time and a necessary dilution operation time duration of each said steam absorption refrigerator are detected, and said load factors of cooling and heating energy output equipments other than said equipment under said dilution operation are lowered so as to reduce a sum of output energies of said cooling and heating energy output equipments in the range equal to or less than the cooling energy generated by said equipment during said dilution operation.
Claim 8
Dependent Claim 28 words
A thermal source equipment operation determining method according to claim 2, wherein said output of each said thermal source equipment is forecast in accordance with past operation data.
Claim 9
Dependent Claim 32 words
A thermal source equipment operation determining method according to claim 6, wherein in forecasting said output of each said thermal source equipment, a neural network using said past operation data is used.
Claim 10
Dependent Claim 190 words
A thermal source equipment operation determining system of determining a start/stop schedule and a running load factor for a plurality of different type thermal source equipments, comprising: means for formulating a relationship between input and output of each said thermal source equipment and the restrictive conditions of upper and lower bounds of said input or output, and generating said start/stop schedule and said running load factor of each said thermal source equipment by a linear planning method, said start/stop schedule and said running load factor minimizing an energy consumption cost of each said thermal source equipment; operation rule storage means for storing knowledge rules regarding a life time and output response characteristic of each said thermal source equipment; fundamental operation plan evaluating means for evaluating optimization of said fundamental operation plan by using said knowledge rules stored in said operation rule storage means; modifying rule storage means for storing modifying rules for modifying said start/stop schedule and said running load factor of each said thermal source equipment in accordance with said fundamental operation plan evaluation results; and means for modifying said fundamental operation plan in accordance with said modifying rules.
Claim 11
Dependent Claim 190 words
A thermal source equipment operation determining system of determining a start/stop schedule and a running load factor for a plurality of different type thermal source equipments, comprising: means for formulating a relationship between input and output of each said thermal source equipment and the restrictive conditions of upper and lower bounds of said input or output, and generating said start/stop schedule and said running load factor of each said thermal source equipment by a linear planning method, said start/stop schedule and said running load factor minimizing an energy consumption cost of each said thermal source equipment; operation rule storage means for storing knowledge rules regarding a life time and output response characteristic of each said thermal source equipment; fundamental operation plan evaluating means for evaluating optimization of said fundamental operation plan by using said knowledge rules stored in said operation rule storage means; modifying rule storage means for storing modifying rules for modifying said start/stop schedule and said running load factor of each said thermal source equipment in accordance with said fundamental operation plan evaluation results; and means for modifying said fundamental operation plan in accordance with said modifying rules.
Claim 12
Dependent Claim 64 words
An energy supply plant operation control system including the thermal source equipment operation determining system set forth in claim 8, comprising means for displaying at least one of a set of said start/stop schedule and said running load factor of each said thermal source equipment, and a set of knowledge regarding a life time and output response characteristic of each said thermal source equipment.
Claim 13
Dependent Claim 42 words
An energy supply plant operation control system including the thermal source equipment operation determining system set forth in claim 8, comprising means for adding, deleting, or modifying knowledge regarding a life time and output response characteristic of each said thermal source equipment.
Claim 14
Dependent Claim 68 words
An energy supply plant operation control system including the thermal source equipment operation determining system set forth in claim 8, comprising means for displaying knowledge rules regarding a life time and output response characteristic of each said thermal source equipment on a display screen, and adding, deleting, or modifying said knowledge rules by designating with input means including a keyboard, a mouse, a light pen, and the like.
Claim 15
Dependent Claim 83 words
An energy supply plant operation control system including the thermal source equipment operation determining system set forth in claim 8, comprising means for displaying a relationship expression of input and output of each said thermal source equipment and a restrictive condition expression for upper and lower bounds of said input on a display screen, and adding, deleting, or modifying said relationship expression and said restrictive condition expression by designating with input means including a keyboard, a mouse, a light pen, and the like.
Claim 16
Dependent Claim 54 words
An energy supply plant operation control system including the thermal source equipment operation determining system set forth in claim 8, comprising means for displaying said modifying rules used for modifying said start/stop schedule and said running load factor of each said thermal source equipment generated by said linear planning method, on a display screen.
Claim 17
Dependent Claim 82 words
An energy supply plant operation control system including the thermal source equipment operation determining system set forth in claim 8, comprising means for displaying said modifying rules used for modifying said start/stop schedule and said running load factor of each said thermal source equipment generated by said linear planning method, on a display screen, and determining whether said modifying rules are to be modified or not by designating with input means including a keyboard, a mouse, a light pen, and the like.
Claim 18
Dependent Claim 155 words
An energy supply plant operation system comprising: long term demand forecasting means for forecasting an energy demand up to a predetermined period; operation plan generating means for determining a start/stop schedule and a running load factor of each thermal source equipment of said energy supply plant up to said predetermined period by using the forecast results by said long term demand forecasting means; short term demand forecasting means for forecasting an energy demand during a short period shorter than said predetermined period; and plan modifying and controlling means for modifying the whole or part of said start/stop schedule and said running load factor of each said thermal source equipment by using the forecast results by said short term demand forecasting means, and converting the modified results into a control signal for each said thermal source equipment, wherein said operation plan generating means is the thermal source equipment operation determining system set forth in claim 8.
Claim 19
Dependent Claim 171 words
An operation method for a plant having a plurality of equipment of different types, comprising the steps of: generating a fundamental operation plan by reading a past record of input data and output data for each said equipment from a database to formulate a relationship therebetween, and providing a constraint condition expression for determining an upper bound and a lower bound for an input or an output in the relationship formulated, to obtain, at every operation time period, an input or an output of each of said equipments making a value of a predetermined objective function maximum or minimum, while satisfying a target output of said plant; and making rules of knowledge regarding lifetime and knowledge regarding a response characteristic of each said equipment, to modify at least one of the upper bound and the lower bound of the constraint condition expression on the basis of the rules, to obtain again an input or an output of each said equipment making a value of the predetermined objective function maximum or minimum.
Claim 20
Dependent Claim 171 words
An operation method for a plant having a plurality of equipment of different types, comprising the steps of: generating a fundamental operation plan by reading a past record of input data and output data for each said equipment from a database to formulate a relationship therebetween, and providing a constraint condition expression for determining an upper bound and a lower bound for an input or an output in the relationship formulated, to obtain, at every operation time period, an input or an output of each of said equipments making a value of a predetermined objective function maximum or minimum, while satisfying a target output of said plant; and making rules of knowledge regarding lifetime and knowledge regarding a response characteristic of each said equipment, to modify at least one of the upper bound and the lower bound of the constraint condition expression on the basis of the rules, to obtain again an input or an output of each said equipment making a value of the predetermined objective function maximum or minimum.

References Cited (Backward Citations)

JPS6197703A Cited
US4835690A Cited
US4868754A Cited
JPS63302318A Cited
US5053970A Cited
US5051932A Cited
US5305230A Cited
JPH0493558A Cited

USPTO Annuity & Maintenance Windows

Annuity Stage Window Opens Payment Deadline Surcharge Period Until Estimated Fee Status
3.5 Years (Year 4) 1998-11-13 1999-05-15 1999-11-14 $2000.00 Window Closed / Lapsed
7.5 Years (Year 8) 2002-11-13 2003-05-15 2003-11-14 $3760.00 Window Closed / Lapsed
11.5 Years (Year 12) 2006-11-13 2007-05-15 2007-11-14 $7700.00 Window Closed / Lapsed