US5444632A
Expired / Lapsed
US
⏱️ 0.0 years remaining
Apparatus and method for controlling and scheduling processing machines
Assignee: Texas Instruments Inc
•
Filing: 1994-04-28
•
Granted: 1995-08-22
•
Expires: 2014-04-28
Abstract
Abstract A method and apparatus selects a period of time for evaluating process resources and lots to be processed by the process resources. Selected lots and selected process resource are chosen that are available to be processed by the process resource and that are available to process the selected lots respectively. For each of the combination of selected process and selected lots a tool score and a lot score is determine and combined in order to select a winning score. The factory is controlled through the process resource in accordance with the winning score.
Inventors
- 👤 Paul J. Kline
- 👤 Michael A. Kilgore
- 👤 Cynthia C. Martin
Bibliographic Details
Application Number
—
Jurisdiction
US
Data Source
google_patents
Last Synchronized
2026-11-03 05:21
CPC Classifications
H; H10; H10P; H10P74/00; H10P74/23; G; G05; G05B; G05B19/00; G05B19/02; G05B19/418; G05B19/41865; G05B2219/00; G05B2219/30; G05B2219/32; G05B2219/32253; G05B2219/32264; G05B2219/32265; G05B2219/32304; G05B2219/32305; G05B2219/32325; Y; Y02; Y02P; Y02P90/00; Y02P90/02
Claims Analysis
Total Claims: 20
Claim 1
Independent Claim
201 words
A method for generating a schedule for a plurality of lots of a factory; comprising the steps of: selecting a predetermined period of time for evaluating a plurality of process resources and said plurality of lots to be processed by said plurality of process resources; selecting, from said plurality of process resources, a plurality of selected process resources available to process said lots during said predetermined period of time; selecting, from said plurality of lots, a plurality of selected lots available to be processed by said selected process resources during said predetermined period of time; determining a process resource score for each of combinations of selected process resources and selected lots; determining a lot score for each of said combinations of said selected process resources and said selected lots; combining said lot score and said process resource score for each of said combinations to determine a combination score for each of said combinations of selected process resources and said selected lots; determining a winning score by comparing each of combination scores for each of said combination of selected process resources and said selected lots; controlling the process resources within the factory to process the lots in accordance with the winning score.
Claim 2
Independent Claim
201 words
A method for generating a schedule for a plurality of lots of a factory; comprising the steps of: selecting a predetermined period of time for evaluating a plurality of process resources and said plurality of lots to be processed by said plurality of process resources; selecting, from said plurality of process resources, a plurality of selected process resources available to process said lots during said predetermined period of time; selecting, from said plurality of lots, a plurality of selected lots available to be processed by said selected process resources during said predetermined period of time; determining a process resource score for each of combinations of selected process resources and selected lots; determining a lot score for each of said combinations of said selected process resources and said selected lots; combining said lot score and said process resource score for each of said combinations to determine a combination score for each of said combinations of selected process resources and said selected lots; determining a winning score by comparing each of combination scores for each of said combination of selected process resources and said selected lots; controlling the process resources within the factory to process the lots in accordance with the winning score.
Claim 3
Dependent Claim
54 words
A method for generating a schedule for a plurality of lots of a factory as in claim 1, wherein said method further comprise the step of determining said process resource score based on idle time of each of the process resources for each of said combinations of selected process resources and said selected lots.
Claim 4
Dependent Claim
49 words
A method for generating a schedule for a plurality of lots of a factory as in claim 1, wherein said method further comprises the step of determining said process resource score based on machine setup time for each of said combinations of selected process resources and said selected lots.
Claim 5
Dependent Claim
52 words
A method for generating a schedule for a plurality of lots of a factory as in claim 1, wherein said method further comprises the step of determining said process resource score based on process time of said process resource for each of said combinations of selected process resources and said selected lots.
Claim 6
Dependent Claim
56 words
A method for generating a schedule for a plurality of lots of a factory as in claim 1, wherein the method further comprises the step of determining said lot score based on the time required for said lots to wait for the process resources for each of said combinations of selected process resource and selected lots.
Claim 7
Dependent Claim
51 words
A method for generating a schedule for a plurality of lots of a factory as in claim 1, wherein the method further comprises the step of determining a lot score based on queue time of said lots for each of said combinations of said selected process resources and said selected lots.
Claim 8
Dependent Claim
52 words
A method for generating a schedule for a plurality of lots of a factory as in claim 1, wherein the method further comprises the step of determining said lot score based on the wait for setup of the process resources for each of said combinations of selected process resources and selected lots.
Claim 9
Dependent Claim
51 words
A method for generating a schedule for a plurality of lots of a factory as in claim 1, wherein the method further comprises the step of determining said lot score based on a critical path of the process resources for each of said combinations of selected process resources and selected lots.
Claim 10
Dependent Claim
52 words
A method for generating a schedule for a plurality of lots of a factory as in claim 1, wherein the method further comprises the step of determining a process resource score based on wait for switch back time for each of said combinations of said selected process resources and said selected lots.
Claim 11
Independent Claim
218 words
An apparatus for generating a schedule for a plurality of lots of a factory, comprising: means for selecting a predetermining period of time for evaluating a plurality of process resources and said plurality of lots to be processed by said plurality of process resources; means for selecting, from said plurality of process resources, a plurality of selected process resources available to process said lots during said predetermined period of time; means for selecting, from said plurality of lots, a plurality of selected lots available to be processed by said selected process resources during said predetermined period of time; means for determining a process resource score for each of combinations of said selected process resources and said selected lots; means for determining a lot score for each of said combinations of selected process resources and said selected lots; means for combining said lot score and said process resource score for each of said combinations to determine a combined score for each of said combinations of selected process resources and said selected lots; and means for determining a winning score by comparing each of said combined score for each of said combination of selected process resource and said selected lots; a controller to control said process resources within the factory to process the lots in accordance with the winning score.
Claim 12
Independent Claim
218 words
An apparatus for generating a schedule for a plurality of lots of a factory, comprising: means for selecting a predetermining period of time for evaluating a plurality of process resources and said plurality of lots to be processed by said plurality of process resources; means for selecting, from said plurality of process resources, a plurality of selected process resources available to process said lots during said predetermined period of time; means for selecting, from said plurality of lots, a plurality of selected lots available to be processed by said selected process resources during said predetermined period of time; means for determining a process resource score for each of combinations of said selected process resources and said selected lots; means for determining a lot score for each of said combinations of selected process resources and said selected lots; means for combining said lot score and said process resource score for each of said combinations to determine a combined score for each of said combinations of selected process resources and said selected lots; and means for determining a winning score by comparing each of said combined score for each of said combination of selected process resource and said selected lots; a controller to control said process resources within the factory to process the lots in accordance with the winning score.
Claim 13
Dependent Claim
53 words
An apparatus for generating a schedule for a plurality of lots of a factory as in claim 10, wherein said apparatus further comprises means for determining said process resource score based on idle time of said selected process resources for each of said combinations of said selected process resources and said selected lots.
Claim 14
Dependent Claim
53 words
An apparatus for generating a schedule for a plurality of lots of a factory as in claim 10, wherein said apparatus further comprises means for determining said process resource score based on machine setup of said selected process resources for each of said combination of said selected process resources and said selected lots.
Claim 15
Dependent Claim
52 words
An apparatus for generating a schedule for a plurality of lots of a factory as in claim 10, wherein said apparatus further comprises means for determining a process resource score based on process time of said process resources for each of said combinations of said selected process resources and said selected lots.
Claim 16
Dependent Claim
52 words
An apparatus for generating a schedule for a plurality of lots of a factory as in claim 10, wherein said apparatus further comprises means for determining a lot score based on a critical path of said process resources for each of said combinations of said selected process resources and said selected lots.
Claim 17
Dependent Claim
54 words
An apparatus for generating a schedule for a plurality of lots of a factory as in claim 10, wherein said apparatus further comprises means for determining a lot score based on the time required to wait for said selected process resources for each of said combinations of selected process resources and said selected lots.
Claim 18
Dependent Claim
50 words
An apparatus for generating a schedule for a plurality of lots of a factory as in claim 10, wherein said apparatus further comprises means for determining a lot score based on queue time of the selected lots for each of said combinations of selected process resources and said selected lots.
Claim 19
Dependent Claim
52 words
An apparatus for generating a schedule for a plurality of lots of a factory as in claim 10, wherein said apparatus further comprises means for determining a lot score based on wait for setup of said selected processing resources for each of said combinations of selected process resources and said selected lots.
Claim 20
Dependent Claim
55 words
An apparatus for generating a schedule for a plurality of lots of a factory as in claim 10, wherein said apparatus further comprises means for determining a process resource score based on wait for switch back time of those selected process resources for each of said combination of selected process resources and said selected lots.
References Cited (Backward Citations)
US5260868A
Cited
US4796194A
Cited
US5148370A
Cited
US5053970A
Cited
US5212791A
Cited
US5140537A
Cited
US5285494A
Cited
USPTO Annuity & Maintenance Windows
| Annuity Stage | Window Opens | Payment Deadline | Surcharge Period Until | Estimated Fee | Status |
|---|---|---|---|---|---|
| 3.5 Years (Year 4) | 1998-08-21 | 1999-02-20 | 1999-08-22 | $2000.00 | Window Closed / Lapsed |
| 7.5 Years (Year 8) | 2002-08-21 | 2003-02-20 | 2003-08-22 | $3760.00 | Window Closed / Lapsed |
| 11.5 Years (Year 12) | 2006-08-21 | 2007-02-20 | 2007-08-22 | $7700.00 | Window Closed / Lapsed |